235A Notice to owner of structure—territory network (1) This section applies to territory network operations on infrastructure owned by the Territory and installed in a structure not owned by the Territory, if the structure is on territory land. (2) At least 7 days before beginning territory network operations, the Territory must give the owner of the structure written notice of the proposed operations. (iii) the structure to be accessed; (iv) the period or periods during which the operations are (b) state the Territory’s obligations under this part. Note The Territory’s obligations include taking all reasonable steps to ensure that it causes as little inconvenience, detriment and damage as is practicable (see s 234), removing its property and waste (see s 239) and restoring the land (see s 240). (4) The owner of the structure may, in writing, agree to a notice period of less than 7 days. (5) However, there is no notice period for territory network operations carried out— (a) in urgent circumstances in which it is necessary to protect— (i) the integrity of a territory network or territory network facility; or
(ii) the health or safety of people; or (iii) public or private property; or (iv) the environment; or (b) in accordance with an access agreement between the Territory and the owner of the structure, made under a streetlight network code.