This Local Environmental Plan sets zoning, permitted uses and development controls for land in Urana, identifies overlays (heritage, biodiversity, riparian) and when consent or exemptions apply. It affects landowners, developers and the Council as consent authority (cl 1.6).
Developers/landowners bear compliance costs and must get Council consent for most works (cls 2.3, 2.6). The Plan allows limited flexibility to vary standards (cl 4.6), permits suspension of some private covenants to enable development (cl 1.9A) and requires heritage and environmental assessment for sensitive sites (cls 5.10; 6.1–6.4).
This local environmental plan (the Plan) sets out statutory land use rules, mapped zones and operational controls for land in the Urana local government area. Mechanically, it does the following.
Prescribes the zones that apply to the land and links the zoning to specific Land Zoning, Lot Size, Land Application, Heritage and Natural Resources maps (clauses 2.1, 2.2, 1.3, 1.7, 4.1(3) and Part 6 maps). The Land Use Table attached to the Plan identifies, for each zone, permitted without-consent uses, permitted-with-consent uses and prohibited uses (clause 2.3; Land Use Table).
Establishes the consent authority as the Council for development within the Plan area (clause 1.6).
Determines the consent regime: what requires development consent, what is exempt development (Part 3, cl 3.1, Schedule 2), and what qualifies as complying development (Part 3, cl 3.2, Schedule 3). It also imposes specific consent requirements for demolition (clause 2.7), subdivision (clause 2.6), temporary uses (clause 2.8) and other identified activities across Parts 4-6.
Sets principal development standards and controls affecting subdivision (minimum lot sizes and exceptions) (Part 4: clauses 4.1, 4.1AA, 4.1A, 4.2), controls on dwellings and rural workers’ dwellings (clauses 4.2B, 4.2C), and a prescribed mechanism for exceptions to development standards (clause 4.6).
Imposes a range of matter-specific decision requirements the consent authority must consider before granting consent, notably in relation to heritage (clause 5.10), biodiversity, wetlands, groundwater vulnerability and riparian land (Part 6, clauses 6.1-6.4), flood planning (clause 5.21), aquaculture (clause 5.19 and Schedule 6), and intensive livestock agriculture (clause 5.18).
Provides design and operational minimums for aquaculture (Schedule 6), sets limits on certain accessory uses (for example bed and breakfast limits, neighbourhood shop sizes,clause 5.4), and contains a prohibition on canal estate development (clause 2.9).
Current sections
Direct links to the current provisions in Urana Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Depots; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Freight transport facilities; Heavy industrial storage establishments; Heavy industries; Helipads; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Mooring pens; Moorings; Open cut mining; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Research stations; Roads; Roadside stalls; Rural industries; Rural workers’ dwellings; Secondary dwellings; Sewerage systems; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C2 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
Note.
When this Plan was made, it did not include Zone RE1 Public Recreation.
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Terrestrial biodiversity
6 Terrestrial biodiversity
6.1 Terrestrial biodiversity
(1) The objective of this clause is to maintain terrestrial biodiversity by—
(a) protecting native fauna and flora, and
(b) protecting the ecological processes necessary for their continued existence, and
(c) encouraging the conservation and recovery of native fauna and flora and their habitats.
(3) Before determining a development application for development on land to which this clause applies, the consent authority must consider whether or not the development—
(a) will cause any adverse impact on the condition, ecological value and significance of the fauna and flora on the land, and
(b) will cause any adverse impact on the importance of the vegetation on the land to the habitat and survival of native fauna, and
(c) has any potential to fragment, disturb or diminish the biodiversity structure, function and composition of the land, and
(d) will cause any adverse impact on the habitat elements providing connectivity.
(4) Development consent must not be granted to development on land to which this clause applies unless the consent authority is satisfied that—
(a) the development is designed, sited and will be managed to avoid any adverse environmental impact, or
(b) if that impact cannot be avoided by adopting feasible alternatives—the development is designed, sited and will be managed to minimise that impact, or
(c) if that impact cannot be minimised—the development will be managed to mitigate that impact.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
| Suburb | Item name | Address | Property description | Significance | Item number |
| Urana | Post Office | Anna Street | Lot 8, Section 4, DP 759023 | Local | I2 |
| Urana | Returned Soldiers Hall | Anna Street | Lots 1 and 2, DP 1109877 | Local | I3 |
| Urana | Courthouse | William Street | Lot 375, DP 729527 | Local | I1 |
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
7
Conservation exclusion zones
7 Conservation exclusion zones
7 Conservation exclusion zones
(1) Must not be carried out on the following land, except to the extent necessary to gain access to water—
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Urana Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Urana in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage sustainable economic growth and development,
(b) to protect, enhance and conserve agricultural land through the proper management, development and conservation of natural and man-made resources,
(c) to identify, protect, conserve and enhance Urana’s natural assets,
(d) to allow for the equitable provision of social services and facilities for the community,
(e) to conserve, protect and enhance the environmental and cultural heritage of Urana.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
Includes transitional and savings rules for development applications made before the Plan’s commencement (clause 1.8A), a clause suspending certain private covenants to the extent necessary to give effect to the Plan (clause 1.9A), and provisions for classification/reclassification of public land by Council (clause 5.2 and Schedule 4).
The Plan is expressed as being subject to State environmental planning policies (SEPPs) that prevail to the extent provided under the relevant Act (clause 1.9(1)). It cross‑refers to a number of State statutes (for example the Heritage Act 1977, Crown Land Management Act 2016, National Parks and Wildlife Act 1974, Fisheries Management Act 1994 and Land Acquisition (Just Terms Compensation) Act 1991) and to State guidance documents (for example the Considering Flooding in Land Use Planning Guideline cited in clause 5.21).
The Plan therefore changes the legal landscape for land use in Urana by allocating development rights by zone, attaching mapped constraints and triggers, specifying matters the consent authority must be satisfied about prior to consent, and by creating mapped areas where special referral, notification or design rules apply (for example Defence communications facility buffer land,clause 5.15; Biodiversity maps,clause 6.1).
Main concepts
The Plan organises regulatory control around a small set of core concepts. Those concepts determine how decisions are framed, what evidence applicants must provide, and where the consent authority’s discretion is circumscribed.
Zoning and Land Use Table: central to the Plan is the Land Use Table which lists permitted without-consent uses, permitted-with-consent uses and prohibited uses for each zone (clause 2.3 and Land Use Table). The consent authority must have regard to zone objectives when deciding applications (clause 2.3(2)). Zoning is implemented by maps (clause 1.7).
Consent hierarchy: the Plan distinguishes exempt development (Schedule 2, cl 3.1), complying development (Schedule 3, cl 3.2) and development requiring consent (numerous clauses). Exempt/compliant pathways are conditional on meeting standards (clause 3.1(2)-(5), cl 3.2(2)-(4)). Exempt/compliant development is excluded from environmentally sensitive areas (clause 3.3).
Minimum lot sizes and subdivision controls: clause 4.1 establishes minimum lot sizes as shown on the Lot Size Map for subdivisions requiring consent. There are special measures for community title schemes (clause 4.1AA), split‑zone lots (clause 4.1A) and rural subdivision flexibility (clause 4.2). Strata subdivision in RU1 is restricted (clause 4.2A).
Development standards and exceptions: the Plan provides a mechanism for exceptions to development standards (clause 4.6). The clause requires applicants to demonstrate that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds; the consent authority must record its assessment (clause 4.6(3)-(4)). Clause 4.6 also limits its operation for particular subdivisions (clause 4.6(6)) and excludes certain standards from being subject to exceptions (clause 4.6(8)).
Environmental and heritage decision tests: Part 6 imposes structured matters the consent authority must consider and conditions that must be met before consent is granted for development affecting biodiversity (clause 6.1), wetlands (clause 6.2), groundwater vulnerability (clause 6.3), riparian land and waterways (clause 6.4), and earthworks (clause 6.7). Heritage items and Aboriginal places are subject to explicit consent requirements and referral/notification provisions (clause 5.10).
Special overlay rules: the Plan creates overlay-style controls by reference to maps and specific clauses, for example: defence communications facility buffer land (clause 5.15), flood planning area (clause 5.21), and Natural Resources maps including Biodiversity, Wetlands, Groundwater Vulnerability and Riparian Land and Waterways (Part 6). These overlays trigger additional decision criteria or require consultation/notification.
Interaction with other instruments: the Plan expressly defers to SEPPs where they prevail (clause 1.9(1)), and cross-references other NSW statutes and State policies that affect approvals, licences and operational standards (multiple clauses, e.g. cl 3.1(5), cl 5.17(5), cl 5.19(5)). Clause 1.9A allows, to a limited extent, suspension of private covenants that would prevent development authorised by the Plan, subject to enumerated exceptions (clause 1.9A(1)-(3)).
These concepts structure incentive and compliance effects. For example the clear mapping of minimum lot sizes and the prohibition on canal estates (clause 2.9) assigns capital value to parcels that meet particular lot-size restrictions; the environmental overlays and specific “must be satisfied” tests shift evidentiary burden onto applicants and consultants, increasing the cost of consenting for development in mapped areas (Part 6). The exception mechanism in clause 4.6 introduces case‑by‑case flexibility but requires documented justification and creates record‑keeping obligations for the consent authority (clause 4.6(4)).
Who it affects
The Plan affects a broad set of actors; the provisions identify who decides, who must act, who bears costs and who may gain rights.
Landowners and developers: the Plan controls what landowners can do on their land by zone and by mapped overlays. Owners seeking subdivision, new dwellings, agricultural developments, aquaculture, intensive livestock agriculture, or works in riparian or biodiversity areas will be directly affected by minimum lot sizes (clauses 4.1, 4.1AA), restrictions on dwellings in RU1 (clause 4.2B), aquaculture requirements (clause 5.19, Schedule 6), and Part 6 environmental tests (clauses 6.1-6.4). Those intending to rely on exempt or complying development pathways must meet the standards in Schedule 2 or Schedule 3 and check that the land is not within excluded environmentally sensitive areas (clause 3.3).
The Council (consent authority): the Plan names the Council as the consent authority (clause 1.6) and requires Council to consider specified matters, to be satisfied about particular outcomes (for example avoidance/minimisation of environmental impacts in clauses 6.1(4), 6.2(4), 6.3(4), 6.4(4)), to keep records of decisions in respect of exceptions to development standards (clause 4.6(4)), and to give or withhold advice/conditions under heritage provisions (clause 5.10).
State authorities and referral bodies: the Plan prescribes consultation or notification to State agencies in specific contexts. For example, before granting consent for works on archaeological sites the consent authority must notify the Heritage Council and consider any response within 28 days (clause 5.10(7)); proposed demolition of nominated State heritage items similarly requires notice to the Heritage Council (clause 5.10(9)); development in the Defence communications facility buffer must involve consultation with the Secretary of the Commonwealth Department of Defence in certain cases (clause 5.15(3)). The Plan also identifies the State authority that would be the relevant acquisition authority in owner-initiated acquisitions (clause 5.1(2) and table).
Crown and public authorities: clause 5.12 confirms the Plan does not restrict development by or on behalf of a public authority where State SEPPs grant rights (clause 5.12(1)) and does not restrict use of existing Crown buildings by the Crown (clause 5.12(2)). Clause 1.9A saves public authority interests in registered instruments (clause 1.9A(3)).
Aboriginal communities and heritage stakeholders: the Plan requires notification and consideration of responses from local Aboriginal communities before granting consent for development in Aboriginal places of heritage significance (clause 5.10(8)). Heritage items listed in Schedule 5 identify specific properties where extra controls apply.
Agricultural and primary production businesses: rules on intensive livestock agriculture (clause 5.18) create thresholds under which consent is not required for certain small-scale operations, but otherwise require consideration of odour, water pollution, soil degradation, and proximity constraints (clause 5.18(3)-(5)). The Plan also protects agricultural land through minimum lot size objectives (clause 4.1(1)) and through objectives in the RU1 zone (Land Use Table objectives).
Community and users of public land: Schedule 4 and clause 5.2 deal with classification and reclassification of public land as operational or community land, which affects management by the Council and the status of trusts and reservations (clause 5.2(2)-(5) and Schedule 4).
Operators of licensed premises and entertainment venues: clause 5.20 limits the grounds on which a consent authority can refuse development applications for licensed premises on the basis of music or entertainment-related characteristics, and bars refusing consent for noise from music where the consent authority is satisfied noise can be managed to an acceptable level (clause 5.20(1)-(2)).
Who pays: applicants generally bear the financial cost of meeting mapping and evidence requirements (environmental assessments, heritage management documents, engineering, flood risk assessments, BASIX certificates where applicable). The Council bears administrative costs associated with assessing applications, keeping records (clause 4.6(4)) and undertaking the prescribed notifications and referrals (clause 5.10, 5.15). State agencies may incur costs from referrals and consultations. Where land is acquired under owner-initiated acquisition provisions, the designated State authority is required to acquire land (clause 5.1(2) and note).
Key duties and rights
The Plan creates decision duties for the consent authority, obligations for applicants, and rights for certain parties. These are stated as statutory “musts” and “must nots” and as criteria that the consent authority must be satisfied of.
Duty to apply zone objectives: the consent authority must have regard to the objectives for development in a zone when determining a development application (clause 2.3(2)). That places an interpretative constraint on how permitted uses are assessed against their broader purpose.
Duty to be satisfied before granting consent in overlay areas: multiple clauses require the consent authority to be satisfied that development will avoid, minimise or mitigate environmental impacts before granting consent, for example biodiversity (clause 6.1(4)), wetlands (clause 6.2(4)), groundwater vulnerability (clause 6.3(4)), riparian land (clause 6.4(4)), flood planning (clause 5.21(2)), and eco-tourist facilities (clause 5.13(3)). Those duties impose evidentiary standards and place the assessment burden on applicants to demonstrate compliance.
Duty to keep records and notify: clause 4.6(4) requires the consent authority to keep a record of its assessment under the exceptions to development standards procedure. Clause 5.10(7)-(9) requires the consent authority to notify the Heritage Council regarding archaeological sites and nominated State heritage items, and to notify local Aboriginal communities for development in Aboriginal places of heritage significance.
Rights to exemption and complying pathways: where development meets Schedule 2 standards it is exempt development and may proceed without development consent (clause 3.1(2)), subject to other approvals under other Acts. Similarly, Schedule 3 permits complying development where standards are met and the development is permissible in the zone (clause 3.2(2)-(3)).
Right to seek an exception to a development standard (but with required justification): clause 4.6 allows the consent authority to grant consent even if a development contravenes a development standard, provided the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (clause 4.6(2)-(3)). The consent authority must document its assessment (clause 4.6(4)). However, clause 4.6(6) and 4.6(8) limit the capacity to use this mechanism for certain subdivisions and standards.
Prohibitions: certain development forms are expressly prohibited. For example, canal estate development is prohibited (clause 2.9(1)); the Land Use Table lists uses prohibited in particular zones (Land Use Table). Clause 4.2B prevents the erection of a dwelling on RU1 land where no dwelling has previously been erected unless the lot meets minimum lot size or other specified criteria.
Applicant obligations to provide specified information: a development application that would contravene a development standard must be accompanied by a document setting out the grounds for the contravention per the Environmental Planning and Assessment Regulation as noted in clause 4.6(3) Note. Clause 5.17(4)(a) prescribes a statement of environmental effects for artificial waterbodies in irrigation corporation areas. Clause 5.18(3)(a) requires adequacy of information in the statement of environmental effects for intensive livestock agriculture.
Rights of State authorities and the Crown: clause 5.12 confirms that the Plan does not restrict development by or use of existing buildings by the Crown where State SEPPs apply (clause 5.12(1)-(2)). Clause 1.9A(3) preserves rights and interests of public authorities under registered instruments.
These duties and rights shape the evidentiary and procedural responsibilities of applicants and decision-makers. Applicants have the right to apply for exceptions and to pursue exempt or complying development where standards are met, but they also face specified duties to demonstrate impacts and mitigation measures in sensitive overlays. The Council must document its reasoning on exceptions and carry out prescribed consultations and notifications.
Penalties and enforcement
The Plan itself is an environmental planning instrument and does not prescribe monetary penalties or criminal sanctions within its text. Enforcement and penalties for breaches of planning controls are functions taken under the primary planning legislation and associated regulations; the Plan references the Act and various other Acts as the legal context for enforcement (for example clause 1.9(1) and various notes). Within the Plan text the enforcement and compliance mechanisms are implicit and administrative rather than penal; the following are the operative enforcement-related features in the Plan.
Development consent and compliance paths: the Plan distinguishes development that needs consent, exempt development, and complying development (Part 3). A development carried out without required consent or outside the conditions of an exemption/compliance certificate will attract enforcement under the Act and its regulations rather than this Plan setting out specific fines (see cl 3.1-3.3).
Conditions on development consents: consent authorities may impose conditions when granting development consent in accordance with the Plan’s various “must be satisfied” tests (e.g. Part 6 environmental clauses, clause 5.13 eco-tourist facilities). Non‑compliance with conditions is enforced under the Act’s compliance regime.
Notification and referral obligations as administrative checks: clauses such as 5.10(7)-(9) (heritage notifications) and 5.15(3) (Defence consultation) create procedural referral and notification steps that act as enforcement pre-conditions to consent; failing to observe required referrals may affect the validity of a consent decision and expose decisions to review.
Records and transparency: clause 4.6(4) requires the consent authority to keep a record of its assessment under the exceptions process, which creates an administrative trail in the event of review or challenge.
Suspension of private covenants: clause 1.9A suspends private covenants and similar instruments to the extent necessary to allow development in accordance with the Plan, but it expressly excludes certain covenants and does not affect public authority rights under registered instruments (clause 1.9A(1)-(3)). The suspension mechanism alters private legal constraints and may give rise to disputes or administration by the Council.
Owner-initiated acquisition framework: clause 5.1 identifies the relevant State authority for owner-initiated acquisition purposes and notes the operation of the Land Acquisition (Just Terms Compensation) Act 1991. That Act contains acquisition and compensation mechanisms (the Plan does not set compensation rules).
Administrative limits on contravention mechanisms: clause 4.6 delineates where exceptions to development standards cannot be used (for example certain subdivisions and specified standards are excluded,clause 4.6(6) and 4.6(8)). These are not penalties but limit procedural pathways; they constrain the consent authority’s latitude.
Practitioners should therefore look to the Act and regulations for the specific penalty and enforcement provisions applicable to non-compliant works. The Plan provides the decision criteria and mapped constraints whose breach will activate enforcement procedures under the primary planning legislation and related NSW statutes.
How it interacts with other laws
The Plan is explicitly framed to operate within a network of State planning instruments and other statutes. The Plan both defers to and incorporates requirements from other laws and State policies; these interactions are frequent and in some cases prescriptive.
SEPP primacy and interaction: clause 1.9(1) states the Plan is subject to the provisions of any State environmental planning policy that prevails over the Plan as provided by section 3.28 of the Act. This means SEPPs can override or modify the Plan where the SEPP has operative effect. The Land Use Table notes several SEPPs that may be relevant (e.g. SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021, SEPP (Resilience and Hazards) 2021 and SEPPs relating to primary production, resources and industry).
Building Code, BASIX and Regulations: exempt and complying development requirements rely on compliance with Building Code of Australia provisions and BASIX commitments where applicable (clause 3.1(3)(a)-(b), note in clause 4.6(8)(b)). The Environmental Planning and Assessment Regulation 2021 is referenced in relation to required documentation for contravening development standards (clause 4.6(3) Note).
Heritage and Aboriginal heritage statutes: clause 5.10 cross‑references the Heritage Act 1977 and requires notification to the Heritage Council for archaeological sites and nominated State heritage items (clause 5.10(7), (9)). The Plan also requires consideration of Aboriginal places of heritage significance and notification of local Aboriginal communities (clause 5.10(8)).
Crown land and conservation Acts: clause 1.9A excludes “relevant instruments” within the meaning of the Crown Land Management Act 2016, conservation agreements under the National Parks and Wildlife Act 1974, Trust agreements under the Nature Conservation Trust Act 2001 (repealed), property vegetation plans under the Native Vegetation Act 2003 (repealed), biobanking agreements under the Threatened Species Conservation Act 1995 (repealed) and planning agreements under the Act, from the covenant suspension mechanism (clause 1.9A(2)(a)-(g)). Clause 5.2 refers to the Local Government Act 1993 rules on classification and reclassification of public land and the Governor’s approval requirement for discharging trusts on reclassified land (clause 5.2(4)-(5) and note).
Water, fisheries and environment legislation: aquaculture provisions refer to the Fisheries Management Act 1994 and its aquaculture industry development plans (clause 5.19) and the Water Management Act 2000 is referenced in clause 5.17 in relation to irrigation corporations. Clause 5.17 also requires the consent authority to consider licences or approvals under other legislation (clause 5.17(4)(b)).
Rural Fires and bushfire legislation: bush fire hazard reduction work authorised by the Rural Fires Act 1997 may be carried out without development consent (clause 5.11).
Defence and radiocommunications standards: clause 5.15 requires consideration of ANZ Standard AS/NZS 5070.1:2008 and consultation with the Secretary of the Commonwealth Department of Defence for specified electromagnetic or infrastructure uses on Defence communications facility buffer land (clause 5.15(2)-(3)).
Flood guidance documents: clause 5.21 requires the consent authority to consider projected changes as a result of climate change and refers to the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual as interpretive aids (clause 5.21(4)-(5)).
Local Land Services, Protection of the Environment and other regulatory regimes: various clauses require consideration of licences and approvals under the Local Land Services Act 2013, Protection of the Environment Operations Act 1997, and the Local Government Act 1993 as relevant (for example clause 5.17(4)(b) and cl 3.2(3)(c)).
Practical consequences of these interactions:
Applicants must check and satisfy multiple statutory regimes in parallel: planning consent under this Plan, building and BASIX requirements, fisheries or water licences, heritage approvals and possibly Crown land approvals where relevant. The Plan repeatedly requires the consent authority to consider whether other statutory approvals are required and to be satisfied about those matters (e.g. clause 5.17(4)).
Some Plan provisions expressly reserve decision space to external agencies: Heritage Council responses and Defence consultation are required inputs to the Plan’s consent process (clauses 5.10 and 5.15).
The Plan can change the operational effect of private law instruments: clause 1.9A suspends private agreements to the extent necessary to enable development authorised by the Plan, but with exclusions for Crown-related instruments and Council-imposed covenants (clause 1.9A(1)-(3)). That creates an intersection between statutory planning rights and private property covenants and may alter contractual expectations.
Procedural primacy: where SEPPs prevail, they can displace Plan provisions (clause 1.9(1)). Applicants and practitioners must therefore check the suite of SEPPs listed and other State instruments in addition to the Plan.
Amendment history
The Plan text itself contains annotations of certain amendments and insertions. The Plan as provided records the following amendment notes and insertions (text quoted and clause references below are taken directly from the Plan as provided):
Clause 1.8A: Savings provision relating to development applications , annotated “cl 1.8A: Am 2019 (621), Sch 5[1].” (clause 1.8A).
Clause 1.9A: Suspension of covenants, agreements and instruments , annotated “cl 1.9A: Am 2019 (621), Sch 5[2]-[4].” (clause 1.9A).
Land Use Table: annotated “Land Use tbl: Am 2013 (232), cl 4.” (Land Use Table note).
Clause 4.2B: Erection of dwelling houses on land in Zone RU1 , annotated “cl 4.2B: Am 2024 (42), Sch 1.49[1].” (clause 4.2B).
Clause 4.6: Exceptions to development standards , annotated “cl 4.6: Am 2024 (42), Sch 1.49[2].” (clause 4.6).
Clause 5.3: Development near zone boundaries , annotated “cl 5.3: Am 2024 (42), Sch 1.49[2].” (clause 5.3).
Schedule 5 and other schedules have been updated in content (Schedule 5 lists specific heritage items at the time of this Plan).
Various notes in the Plan refer to the Standard Instrument (Local Environmental Plans) Order 2006 and to State policies and regulations, indicating amendments may have occurred to align with standard instrument updates.
These amendment annotations identify specific insertions, repeals and amendments by year and instrument number as recorded in the Plan text. Practitioners should verify the currency of these amendments against the digital register (the Plan notes that maps and instruments are to be kept on the NSW Planning Portal,clause 1.7 Note) because the Plan expressly allows maps to be amended or replaced and for instruments to be updated (clause 1.7(1)(b)).
Litigation history
The Plan itself contains no statement of case law or litigation that arises under it. The text does not name or summarise any judicial decisions or disputes. Where the Plan prescribes consultation or notification duties (for example heritage notifications in clause 5.10), these are procedural inputs that can be the subject of administrative review or judicial challenge under the Act; however the Plan does not provide any litigation history or list judicial determinations.
Practitioners seeking precedent on interpretation, challenge to consent decisions, or enforcement actions arising from this Plan must therefore consult decisions under the Act and the Planning and Environment Court or other relevant tribunals and case law outside the Plan text. The Plan itself should be treated as the primary source of substantive planning controls and procedural requirements; any litigation analysis must be built on the Act, the regulations and court decisions that interpret those instruments rather than on content included in this Plan.
Gotchas
This Plan contains several provisions that commonly cause practical surprises for applicants and advisers. These are the concrete pitfalls and friction points that affect timing, cost, legal rights and project viability.
Savings provision for pending DAs (clause 1.8A). If a development application was lodged before the Plan’s commencement and not finally determined when the Plan commenced, it must be determined as if the Plan had not commenced (clause 1.8A). This can be a major timing issue: applicants expecting to rely on the new Plan’s standards may find they are frozen to the prior instrument, while opponents may leverage the previous rules. Check lodgement and final determination dates carefully (clause 1.8A and its note).
Suspension of private covenants (clause 1.9A). Clause 1.9A will disapply private covenants, agreements or instruments to the extent necessary to enable development authorised by the Plan (clause 1.9A(1)), but it excludes Council-imposed covenants and several Crown and conservation instruments (clause 1.9A(2)). If development depends on the continued operation of a private covenant, that covenant may be suspended; conversely, those relying on the covenant should be aware their private restriction may not be an absolute bar to development. This creates potential disputes between covenanting parties.
Environmental overlays exclude exempt/compliant pathways (clause 3.3). Exempt or complying development cannot be carried out in “environmentally sensitive areas” as defined in clause 3.3. That means projects that would otherwise rely on fast tracks may need full development applications and environmental assessments if the land falls within the listed categories.
Minimum lot size and RU1 restrictions (clauses 4.1, 4.2B). The Plan’s subdivision and dwelling controls are restrictive in RU1 primary production areas: clause 4.2B largely prevents new dwellings on RU1 land unless the lot meets minimum sizes or other specified conditions; clause 4.1 sets binding minimum lot sizes on subdivision. An applicant proposing subdivision or a new dwelling must check the Lot Size Map and the “existing holding” definition in clause 4.2B(6), and must be alert to the 12‑month rule in clause 4.2B(4).
Strata and community title limits (clause 4.2A and 4.1AA). Clause 4.2A prohibits strata subdivision in RU1 in circumstances that will produce lots below the minimum size. Clause 4.1AA applies to community title scheme subdivisions, preserving minimum lot sizes for association property. These provisions limit property product structuring in rural zones and may surprise financiers and developers used to strata or community title solutions.
Exceptions to development standards constrained (clause 4.6). While clause 4.6 allows flexibility, it imposes a two‑part justification test (unreasonable or unnecessary compliance and sufficient environmental planning grounds) and requires the consent authority to keep a record of its assessment (clause 4.6(3)-(4)). Importantly, clause 4.6(6) prevents the use of this flexibility for certain subdivisions in listed zones and clause 4.6(8) excludes certain standards (e.g. complying development standards, BASIX-related standards, clause 5.4 or 5.5 where applicable). Practitioners must not assume the exceptions route is always available.
Defence buffer special controls (clause 5.15). On defence communications facility buffer land the consent authority cannot grant consent for certain uses unless the Secretary of the Commonwealth Department of Defence has been consulted and indicated the development will not adversely affect the facility (clause 5.15(3)). Clause 4.6 cannot be used to contravene clause 5.15 (clause 5.15(4)). If the subject site appears on the Defence Communications Facility Buffer Map, plan early for Defence consultation.
Heritage and Aboriginal notification timing (clause 5.10). For archaeological sites and Aboriginal places of heritage significance, the Plan mandates notification and sets 28‑day windows for responses (clause 5.10(7)-(8)). Timeframes for heritage consultation can extend determination timelines and may require heritage management documents or plans before consent can be granted (clause 5.10(5)-(6)).
Intensive livestock agriculture thresholds and proximity limits (clause 5.18). Some intensive livestock operations benefit from no-consent development up to specified capacities if not located in environmentally sensitive areas or within specified buffer distances from dwellings or residential zones (clause 5.18(4)-(5)). But larger operations require careful environmental assessment,applicants must demonstrate adequacy of statements of environmental effects and management measures (clause 5.18(3)(a)-(h)).
Exemptions and building classification interplay (clause 3.1 and clause 5.4 notes). Exempt development is conditional on Building Code compliance and BASIX commitments where relevant (clause 3.1(3)(a); note in clause 4.6). Some exempt development can be unavailable because of building classification issues or fire safety certificate requirements (clause 3.1(4)).
Temporariness limits on temporary use and sales offices (clause 2.8). Temporary uses are limited to 52 days in any 12 months unless the use is a dwelling acting as a sales office for a new release area (clause 2.8(2)-(5)). Applicants seeking longer temporary occupation must plan for development consent or ensure the special sales office exception applies.
These practical traps implicate timing, costs and the available consent pathways. Early mapping checks, timely statutory consultations and clarity about whether the site falls into any overlay area are essential to avoid delay and unexpected requirements.
How to comply
Compliance work is organised around four tasks: map and legal status checks; pathway selection and scope of assessment; compiling the required documentation and notifications; and systematising post-consent conditions and monitoring obligations. The Plan makes clear which steps are mandatory for particular circumstances,refer to the clause citations below.
Start with mapping and zone checks
Confirm the site’s Land Zoning Map, Lot Size Map, Land Application Map, Natural Resources maps (Biodiversity, Wetlands, Groundwater Vulnerability, Riparian Land and Waterways), Defence Communications Facility Buffer Map and Heritage Map mentioned in clauses 1.3, 1.7, 2.2 and the Part 6 references. Many Plan provisions trigger only where the land is shown on these maps (for example clauses 6.1-6.4, and clause 5.15).
Check Schedule 5 to see if the property is a listed heritage item (clause 5.10 and Schedule 5).
Determine the correct approval pathway
If the proposed works are listed in Schedule 2 and meet those standards, treat them as exempt development (clause 3.1). Remember clause 3.3 excludes exempt or complying development in environmentally sensitive areas.
If the development is listed in Schedule 3 Part 1 and meets the stated development standards and complying development conditions, seek a complying development certificate (clause 3.2(2)-(4)).
Otherwise, prepare to lodge a development application for development consent with the Council, the consent authority named in clause 1.6.
For development applications prepare the required information
Provide a statement of environmental effects where required, and where the development may contravene a development standard, include the document required by the Environmental Planning and Assessment Regulation that sets out the grounds for the contravention (clause 4.6(3) note).
For proposals in environmentally sensitive overlays prepare targeted assessments in accordance with the relevant clause: biodiversity impacts (clause 6.1(3)), wetlands (clause 6.2(3)), groundwater (clause 6.3(3)), riparian impacts (clause 6.4(3)), flood impacts (clause 5.21(2)-(3)), and earthworks (clause 6.7(3)). The Plan requires the consent authority to be satisfied that impacts are avoided, minimised or mitigated (each clause’s final subclause).
For proposals involving aquaculture, follow the site location and operational requirements in clause 5.19 and Schedule 6; prepare any aquaculture industry development plan materials and demonstrate compliance with the NSW Oyster Industry Sustainable Aquaculture Strategy where relevant (clause 5.19(2), (5)).
For intensive livestock agriculture over threshold sizes prepare robust environmental assessments addressing odour, water pollution, soil degradation and site suitability as listed in clause 5.18(3).
For heritage items and Aboriginal places prepare either a heritage management document or a heritage conservation management plan if required (clause 5.10(5)-(6)), and be ready for the consent authority’s notification obligations (clause 5.10(7)-(9)).
Observing procedural requirements and referrals
Allow time for referral responses where the Plan requires them: Heritage Council (28 days) for archaeological sites and nominated State heritage items (clause 5.10(7), (9)); notifications to local Aboriginal communities with a 28‑day window (clause 5.10(8)); Defence consultation for specified equipment or uses in the Defence buffer (clause 5.15(3)).
Where the Plan’s clause 1.9A may operate to suspend private covenants, advise clients on the risk that Council- or State‑imposed covenants are not suspended and that certain Crown-related instruments are excluded (clause 1.9A(2)-(3)).
If a development standard cannot be met
Consider if clause 4.6 (exceptions to development standards) can lawfully be used. Prepare the two-part argument required by clause 4.6(3): why compliance is unreasonable/ unnecessary, and the environmental planning grounds for a contravention. Keep in mind clause 4.6(6) limits the exceptions pathway for certain subdivisions and clause 4.6(8) excludes particular standards from being varied.
Ensure the consent authority will be able to keep the record of the assessment required by clause 4.6(4). This may mean preparing a clear written justification and attaching expert technical reports.
Draft and negotiate consent conditions
Anticipate conditions dealing with environmental mitigation, flood risk management, heritage conservation work, monitoring and remediation, and ongoing operational controls for activities such as aquaculture and intensive livestock (clause 5.13, clause 5.19, clauses 6.1-6.4).
For temporary uses, condition compliance with restoration obligations and the 52-day cap unless a sales office exception applies (clause 2.8(2)-(5)).
Post-consent monitoring and compliance
Set up systems to demonstrate ongoing compliance with consent conditions, particularly environmental monitoring obligations (clause 5.13(3)(k)(iv) on eco-tourist facilities and similar clauses requiring ongoing management and monitoring).
Ensure construction works meet Building Code and BASIX commitments where relevant (clause 3.1(3)-(4); note in clause 4.6(8)(b)).
For aquaculture, ensure outlets are screened to prevent escape of stock (Schedule 6, Part 1 Division 2, item 5) and that ponds are designed to meet drainage and discharge restrictions (Schedule 6, items 3-4).
Record-keeping and administrative steps
Keep documentary evidence for any use of clause 4.6 exceptions, including the environmental planning grounds and reasons why compliance was unreasonable or unnecessary (clause 4.6(3)-(4)).
Where heritage management documents or conservation management plans are required, keep approvals and conservation work records linked to the consent (clause 5.10(5)-(6)).
In short: begin with map and zone checks; identify whether exempt/compliant or consent paths apply; prepare targeted environmental, heritage and technical documents to satisfy clause-specific “must be satisfied” tests (Part 6, clause 5.21, clause 5.19 etc.); factor in time for the statutory notifications and referral responses; and where an exception to a development standard is sought, prepare the two-part statutory justification and document the consent authority’s assessment as required by clause 4.6.
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Urana Local Environmental Plan 1990
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R5 Large Lot Residential
Special Purpose Zones
SP2 Infrastructure
Conservation Zones
C1 National Parks and Nature Reserves
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterway or waterbody, that—
(i) is inundated by surface water or groundwater movement, or
(ii) drains to a waterway or waterbody by surface water or groundwater movement, and
(b) the erection of a dwelling, and
(c) one or both of the following—
(i) the use of fill material to raise the level of all or part of the land on which the dwelling will be erected to comply with requirements for residential development in the flood planning area,
(ii) excavation to create a waterway.
(3) Canal estate de
This is an opening excerpt, not the complete document.