This local environmental plan sets the rules for land in the Upper Hunter: it defines zones, what uses are permitted or prohibited, minimum lot sizes, building height and floor-space limits, environmental overlays (biodiversity, groundwater, riparian, flood), heritage controls, exempt/complying development and local conditions. It applies to land shown on the Plan maps and gives the Council control over development consents, so landowners, developers and service providers must follow its maps and standards when proposing subdivision, buildings or land use changes.
Mechanically, this instrument is a local environmental plan (the Upper Hunter Local Environmental Plan 2013) that sets the statutory land‑use regime for the geographic area identified on the Land Application Map and related maps (cl 1.1; cl 1.3; cl 1.7). It commences on publication on the NSW legislation website (cl 1.1AA). The Plan:
establishes the consent authority as the Council (cl 1.6);
creates a zoning framework (Part 2, cl 2.1-2.3; Land Use Table) with specific zones (for example Zone RU1 Primary Production; Zone R1 General Residential; Zone E4 General Industrial; Zone C3 Environmental Management, among others) and maps that fix permissible, consented and prohibited land uses and objectives for each zone (cl 2.1, cl 2.2, cl 2.3);
prescribes principal development standards (Part 4) including minimum subdivision lot sizes (cl 4.1 and related exceptions, and cl 4.1AA, 4.1A, 4.1B, 4.1C, 4.1D), height controls (cl 4.3), floor space ratio rules and calculation methods (cl 4.4-4.5), and the procedural avenue for exceptions to development standards (cl 4.6);
sets out exempt and complying development categories and conditions (Part 3; Schedule 2 exempt development; Schedule 3 complying development), including BCA and other technical requirements (cl 3.1-3.3);
includes a suite of local provisions addressing environmental constraints and specific land uses: earthworks (cl 6.1), terrestrial biodiversity (cl 6.3), groundwater vulnerability (cl 6.4), drinking water catchments (cl 6.5), riparian land and watercourses (cl 6.6), flood planning (cl 5.21) and special flood considerations (cl 5.22), intensive livestock agriculture (cl 5.18), pond/tank and oyster aquaculture (cl 5.19 and Schedule 6), and controls for music at licensed premises (cl 5.20);
Current sections
Direct links to the current provisions in Upper Hunter Local Environmental Plan 2013.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Crematoria; Depots; Dual occupancies (attached); Dwelling houses; Eco-tourist facilities; Emergency services facilities; Environmental facilities; Extractive industries; Farm buildings; Flood mitigation works; Function centres; Funeral homes; Health services facilities; Helipads; Home-based child care; Home businesses; Home industries; Information and education facilities; Intensive livestock agriculture; Jetties; Landscaping material supplies; Mortuaries; Open cut mining; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Respite day care centres; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Sewerage systems; Signage; Tourist and visitor accommodation; Transport depots; Truck depots; Turf farming; Veterinary hospitals; Water recreation structures; Water supply systems; Wharf or boating facilities
4
Prohibited
4 Prohibited
4 Prohibited
Hospitals; Hotel or motel accommodation; Serviced apartments; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone SP2 Infrastructure and marked “Local Road and Car Parking” | Council |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2022 (831), Sch 1.25[9]–[14].
sch.2-sec
Commercial use of footpaths
sch.2-sec Commercial use of footpaths
Commercial use of footpaths
(1) Must be located within a road reserve for which the Council is the roads authority under the Roads Act 1993.
(2) Maximum area—20m2 per use.
sch.2-sec-oc.2
Dams in Zones RU1, RU4, R5 and C3
sch.2-sec-oc.2 Dams in Zones RU1, RU4, R5 and C3
Dams in Zones RU1, RU4, R5 and C3
(1) Embankment fill batter grades must not be steeper than 1:2.5 (vertical: horizontal).
(2) Minimum distance from any property boundary—10m.
(3) Maximum fill embankment crest width—3m.
(4) Minimum height difference between the embankment crest level and the spillway level—1m.
(5) Maximum fill embankment height—3m (measured from ground level (existing) immediately down slope of the embankment to the top of the embankment crest level).
Note.
Farm dams must comply with the NSW Farm Dams Policy (Harvestable Right Dams Policy), a copy of which can be obtained from the NSW Office of Water.
sch.2-sec-oc.3
Restumping or repairing structure foundations of existing building that is a heritage item or in a heritage conservation area
sch.2-sec-oc.3 Restumping or repairing structure foundations of existing building that is a heritage item or in a heritage conservation area
Restumping or repairing structure foundations of existing building that is a heritage item or in a heritage conservation area
(1) Existing floor height must not be altered unless the alterations result from floor levelling to rectify unevenness.
(2) Termite barriers must be maintained or installed in accordance with AS 3660—2000, Termite management.
(3) Must not involve alterations to existing plumbing and drainage works. Repairs to defective pipe work must be undertaken by a licensed plumber.
(4) Materials used must be the same as the existing stumps, bracing or any infill.
sch.2-sec-oc.4
Signage
sch.2-sec-oc.4 Signage
Signage
(1) General requirements Signage must comply with the following—
(a) must be non-moving,
(b) must relate to the lawful use of the land on which the sign is located (except for community information or directional signs),
(c) must be within the boundary of the property to which the signage relates (except for under awning signs in Zone E1 or MU1 and community information or directional signs),
(d) must not obstruct the sight line of vehicular or pedestrian traffic,
(e) must have the consent of the owner of the property on which the sign is located,
(f) must not be illuminated or flashing,
(g) must not be located on a heritage item or in a heritage conservation area unless the advertisement will replace existing signage.
(2) Business identification signs in Zone E1 or MU1 Must comply with the following—
(a) under awning signs (being a sign attached to the underside of an awning other than a fascia or return end) must comply with the following—
(i) 1 sign per ground floor premises with street frontage,
(ii) maximum length—2.5m,
(iii) maximum height—0.5m,
(iv) minimum distance from outer edge of awning—0.3m,
(v) must be at least 2.6m above any public footpath,
(b) flush wall signs (being a sign attached to the wall of a building, other than the transom of a doorway or display window, and not projecting more than 300mm) must comply with the following—
(i) maximum area—
(A) if the building elevation is 100m2 or less—20% of the elevation, or
(B) if the building elevation is more than 100m2 but no more than 200m2—20m2, or
(C) if the building elevation is more than 200m2—10% of the elevation,
(ii) must not project above or beyond the parapet or eaves,
(iii) 1 sign per building elevation,
(iv) must not cover mechanical ventilation inlet or outlet vents, windows or wall openings,
(c) freestanding signs (being a moveable freestanding sign displayed at ground level) must comply with the following—
(i) maximum area—0.65m2,
(ii) 1 sign per business.
(3) Business identification signs (excluding sex services premises) in Zone E4 Must comply with the following—
(a) pole or pylon signs must comply with the following—
(i) 1 sign per premises (including any directory board for multiple occupancies),
(ii) maximum height—3m,
(iii) must be at least 2.6m above any public footpath,
(iv) maximum surface area—
(A) if relating to a single occupancy premises—4m2, or
(B) if relating to a multiple occupancy premises—8m2,
(b) flush wall signs (being a sign attached to the wall of a building, other than the transom of a doorway or display window, and not projecting more than 300mm) must comply with the following—
(i) maximum area—
(A) if the building elevation is greater than 200m2—10% of the elevation, or
(B) if the building elevation is greater than 100m2 but not greater than 200m2—20m2, or
(C) if the building elevation is 100m2 or less—20% of the elevation,
(ii) must not project above or beyond the parapet or eaves,
(iii) 1 sign per building elevation,
(iv) must not cover mechanical ventilation inlet or outlet vents, windows or wall openings,
(c) freestanding signs must comply with the following—
(i) maximum area—0.65m2,
(ii) 1 sign per business,
(d) top hamper signs (being a sign attached to the transom of a doorway or window)—maximum 1 sign per building elevation.
(4) Business identification signs in rural and residential zones Must comply with the following—
(a) maximum area—
(i) if located in a rural zone—0.75m2, or
(ii) if located in a residential zone—0.6m2,
(b) maximum 1 sign per premises,
(c) if located in a rural zone, must not be within 250m of a classified road.
(5) Community information and directional signs Must comply with the following—
(a) must be installed by or on behalf of a public authority,
(b) must be located wholly on a footpath or, with the owner’s consent, be attached to a fence.
(6) Real estate signs Must comply with the following—
(a) maximum area—
(i) if advertising land development—6m2, or
(ii) if located in an employment zone—4.5m2, or
(iii) if located in a rural or residential zone—2.5m2, and
(b) must be removed within 14 days after the last lot, premises or land is sold.
(7) Temporary signs for religious, cultural, social or recreational events Must comply with the following—
(a) maximum area—1.5m2,
(b) 1 sign per street frontage,
(c) must not include commercial advertising apart from the name of the event’s sponsor,
(d) must not be displayed earlier than 28 days before, or later than 14 days after, the event,
(e) must not be used in relation to recurring events.
(8) Window signs in an employment zone (excluding sex services premises) must not occupy more than 25% of the area of the window.
Maps: Am 2015 (637), cl 4; 2016 (27), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Upper Hunter Local Environmental Plan 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in the Upper Hunter in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the proper management, development and conservation of natural and human-made resources in the Upper Hunter by protecting, enhancing and conserving the following—
(i) important agricultural resources,
(ii) timber, minerals, soil, water and other natural resources,
(iii) the environmental, scenic and cultural heritage of the Upper Hunter,
(b) to protect and conserve—
(i) soil stability by controlling development in accordance with land capability, and
(ii) remnant native vegetation, and
(iii) water resources, water quality and wetland areas, natural flow patterns and their catchments and buffer areas,
(c) to establish a pattern of broad development zones as a means of—
(i) separating incompatible uses, and
(ii) minimising the cost and environmental impact of a development, and
(iii) maximising efficiency in the provision of utility, transport, retail and other services,
preserves heritage by listing heritage items and conservation areas and requiring consent in specified circumstances (cl 5.10; Schedule 5);
provides for classification and reclassification of public land (cl 5.2; Schedule 4) and identifies the relevant State authority for owner‑initiated acquisition of land reserved for public purposes (cl 5.1; Land Reservation Acquisition Map);
repeals earlier local environmental plans that applied to the same land (cl 1.8) and contains a savings provision allowing development applications made before the Plan’s commencement to be determined as if the Plan had not commenced (cl 1.8A);
suspends private covenants, agreements or instruments that would restrict development carried out in accordance with the Plan, subject to enumerated public interest exceptions such as certain Crown instruments, conservation agreements and planning agreements (cl 1.9A).
The Plan is expressly subject to State environmental planning policies that prevail under the Environmental Planning and Assessment Act (cl 1.9(1)), and it cross‑references multiple State and Commonwealth Acts and instruments (for example the Heritage Act 1977, National Parks and Wildlife Act 1974, Land Acquisition (Just Terms Compensation) Act 1991 and various SEPPs). The text contains numerous map references (Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Drinking Water Catchment Map, Watercourse Map, Air Noise Exposure Forecast Map, etc.) that fix quantitative and spatial limits on development outcomes (see cl 2.2; cl 4.1; cl 4.3; cl 4.4; cl 6.3; cl 6.4; cl 6.5; cl 6.6; cl 6.8).
The Plan states its aims (cl 1.2), including protection of agricultural resources, conservation of native vegetation and biodiversity, management of flood‑prone land, and strengthening retail centres and employment opportunities. Those policy aims are expressed as aims and objectives throughout the Plan and drive permitted uses, development controls and assessment criteria across the schedules and clauses.
Main concepts
The Plan’s organising concepts are spatial zoning, mapped development standards, and a mix of permissive and prohibitive controls calibrated to local resource, heritage and hazard considerations.
Zoning and Land Use Table
Zones are the primary regulatory unit: the Land Use Table specifies for each zone the objectives, the development that may be carried out without consent, with consent, and what is prohibited (cl 2.1; cl 2.3). The Council must have regard to the objectives for the zone when determining a development application (cl 2.3(2)). The Plan lists rural (RU), residential (R), employment (E), mixed use (MU), special purpose (SP), recreation (RE) and conservation (C) zones (cl 2.1).
Maps as technical instruments
The operative spatial limits for many standards are map‑driven. Multiple controls are “shown on the ... Map” (Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Watercourse Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Drinking Water Catchment Map, Heritage Map and others) and the Plan ties permissible activity and standards to map identification (cl 2.2; cl 4.1; cl 4.3; cl 4.4; cl 6.3-6.6; cl 5.10; cl 1.7). The Plan also authorises the maps to be kept in electronic or paper form (cl 1.7(4)).
Permitted, consented and prohibited activities
The Land Use Table and several schedules separate low‑impact activities that may be carried out without development consent (some as exempt development under Schedule 2), those that require development consent, and those prohibited outright (cl 2.3 and Land Use Table entries). The Plan also provides for complying development in Schedule 3 where specified standards are met (cl 3.2).
Development standards and exceptions
Principal standards include minimum lot sizes (cl 4.1 and related clauses on strata and community title schemes cl 4.1AA, 4.1A), height (cl 4.3), floor space ratio and how to calculate site area and gross floor area (cl 4.4-4.5). Clause 4.6 provides a route to seek development consent for proposals that contravene a development standard provided the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds; the consent authority must keep a record of its assessment (cl 4.6(2)-(4)). Clause 4.6 contains specific exclusions and limits on when it can be used (cl 4.6(6), (8)).
Environmental, heritage and hazard layering
The Plan layers controls directed at environmental protection (biodiversity cl 6.3; groundwater cl 6.4; riparian cl 6.6), heritage (cl 5.10; Schedule 5), and hazards (flood planning cl 5.21 and special flood considerations cl 5.22). For each mapped environmental constraint, the consent authority is to consider specific matters and must not grant consent unless it is satisfied that impacts will be avoided, minimised or, if unavoidable, mitigated (for example cl 6.3(3)-(4); cl 6.4(3)-(4); cl 6.5(3)-(4); cl 6.6(3)-(4); cl 5.21(2)).
Local carve‑outs and site‑specific clauses
The Plan contains site‑specific additional permitted uses (Schedule 1), exempt development lists and technical requirements (Schedule 2), and site‑specific aquaculture constraints (Schedule 6). There are multiple local carve‑outs, e.g. certain land at Macqueen Street Aberdeen may be used for vehicle repairs and sales (Schedule 1 cl 1), and Scone Memorial Aerodrome‑related constraints and permissions (Schedule 1 cl 2; cl 6.7; cl 6.8).
Administrative mechanics
The Plan: designates Council as consent authority (cl 1.6); makes explicit that State environmental planning policies prevail where specified (cl 1.9(1)); suspends private covenants to the extent required to enable Plan‑consistent development (cl 1.9A); provides procedures for public notice and consultation in heritage contexts (cl 5.10(7)‑(9)); and links to other Acts for approvals that the Plan does not displace (note in Schedule 2; cl 5.12).
Behavioural conceptually embedded in the Plan
The instrument operates by modifying private property entitlements and the exercise of municipal permission: it allocates ex ante which land uses are permitted or not, conditions development consent on technical and environmental assessments and maps, and creates administratively enforceable constraints and exceptions that shape investment, subdivision and operational choices by landowners, developers, the Council and State agencies.
Who it affects
Geographically the Plan applies to the land identified on the Land Application Map for the Upper Hunter (cl 1.3). The practical cast of affected persons and entities is broad; the Plan’s text specifies roles, constraints and rights.
Primary stakeholders
Landowners and prospective developers within the mapped area: they must determine permissible uses under the Land Use Table and maps (cl 2.2; cl 2.3); obtain development consent where required (for example subdivision cl 2.6; demolition cl 2.7); and, for exempt or complying categories, meet the technical and BCA conditions in Schedule 2 and Schedule 3 (cl 3.1-3.2). Particular owner types are singled out: owners of heritage items or land in heritage conservation areas face additional consent requirements (cl 5.10); owners in mapped biodiversity, groundwater vulnerability, drinking water catchment and riparian zones must satisfy additional environmental tests (cl 6.3-6.6).
Consent authority and public bodies
The Council is the designated consent authority (cl 1.6). State agencies are implicated in several places: certain State environmental planning policies prevail over the Plan (cl 1.9(1)); the Plan identifies the relevant State authority for acquisition for particular mapped land (cl 5.1 and the Land Reservation Acquisition Map); the Plan requires consultation with a relevant Commonwealth body before granting consent for development that penetrates the Limitation or Operations Surface for the Scone Memorial Aerodrome (cl 6.7(2)-(4)); and the Plan does not restrict development permitted under SEPP (Transport and Infrastructure) Chapter 2 (cl 5.12(1)).
Third parties and local interests
Adjoining landowners or users are addressed via assessment criteria. For example, where land is unzoned, the consent authority must consider impacts on adjoining zoned land and be satisfied the proposed development is compatible (cl 2.4). The Plan sets separation and amenity considerations for sensitive uses such as sex services premises (cl 6.11). Operators of licensed premises are affected by protections for live, amplified or genre‑based music: the consent authority cannot refuse consent for licensed premises on enumerated grounds related to music and must not refuse where noise can be managed to an acceptable level (cl 5.20).
Sectoral impacts
Farming and rural industries: the Plan’s aims and rural zoning (cl 1.2; cl 2.1) and specific clauses on rural subdivision (cl 4.2; cl 4.2A), rural workers’ dwellings (cl 4.2C), intensive livestock agriculture (cl 5.18) and pond/tank aquaculture (cl 5.19; Schedule 6) shape where and how agricultural and aquaculture enterprises can expand and what performance standards they must meet.
Heritage sector: owners of heritage items and local Aboriginal communities where Aboriginal places are affected in development applications have consultative rights (cl 5.10(8)); the consent authority must notify the Heritage Council in certain archaeological and demolition cases (cl 5.10(7), (9)).
Utilities and infrastructure providers: the Plan requires developers to ensure availability or arrangements for essential services before consent is granted (cl 6.10); it also identifies relevant authorities for acquisition and for classified roads in Schedule 4 and cl 5.1.
Specialised local actors
Operators or proponents near Scone Memorial Aerodrome: specific siting and acoustic obligations apply (cl 6.7; cl 6.8; Schedule 1 cl 2 refers to dwellings that must comply with AS 2021-2000).
Event organisers using public reserves or roads: the Plan permits temporary events on public reserves and public roads without development consent subject to time limits and other statutory approvals (cl 6.9).
Owners subject to covenants: cl 1.9A suspends private instruments that restrict development to the extent necessary to permit development under the Plan, but carves out instruments imposed by Council and several named public instruments (cl 1.9A(2)-(3)).
Administrative beneficiaries and losers
The Plan concentrates discretion in the Council as consent authority (cl 1.6), and in State agencies in matters where the Plan requires consultation or where SEPPs prevail (cl 1.9; cl 6.7). Owners whose land is rezoned into a more permissive use will realise direct, concentrated gains; owners facing tighter heritage, biodiversity, flood or groundwater overlays face potential restrictions and compliance costs. The Plan also shifts some decision costs onto applicants who must prepare evidence to satisfy clause‑specific tests (heritage impact statements, biodiversity assessment, flood compatibility analysis, noise management plans for licensed premises).
Who does not fall outside the Plan?
Public authorities carrying out development authorised by SEPP (Transport and Infrastructure) Chapter 2 are not restricted by the Plan (cl 5.12(1)); similarly the Crown’s use of existing Crown buildings is preserved (cl 5.12(2)). The suspension of covenants does not affect public authority rights under registered instruments (cl 1.9A(3)).
In sum, the Plan affects private landholders, developers, local government, State and Commonwealth bodies engaged in planning, utilities and infrastructure providers, sectoral businesses such as agriculture and aquaculture, event operators, licensed premises, and heritage/Aboriginal heritage stakeholders , with the Council centrally placed as the decision maker under mapped standards and clause‑by‑clause assessment tests.
Key duties and rights
The Plan allocates duties to the consent authority, obligations on applicants/landowners and confers certain rights. Below are the principal duties and rights expressly written into the text.
Duties of the consent authority (Council)
Apply zone objectives in assessment: the consent authority must have regard to zone objectives when determining development applications (cl 2.3(2)).
Apply mapped standards: the consent authority must ensure development complies with mapped height, floor space ratio and lot size limits (cl 4.1; cl 4.3; cl 4.4), unless a lawful exception under the Plan applies.
Record assessments for development standard contraventions: if considering a request under cl 4.6 to contravene a development standard, the consent authority must be satisfied of the applicant’s grounds and keep a record of that assessment (cl 4.6(2)-(4)).
Environmental, heritage and hazard assessment duties: the consent authority must consider particular matters and be satisfied about avoidance/minimisation/mitigation of impacts in biodiversity (cl 6.3(3)-(4)), groundwater (cl 6.4(3)-(4)), drinking water catchments (cl 6.5(3)-(4)), riparian areas (cl 6.6(3)-(4)), flood planning (cl 5.21(2)-(3)), special flood considerations (cl 5.22(3)), and intensive livestock agriculture (cl 5.18(3)).
Heritage consultation duties: where development affects archaeological sites or Aboriginal places the consent authority must notify and have regard to responses from the Heritage Council and local Aboriginal communities within specified timeframes (cl 5.10(5), (7)-(9)). For demolition of nominated State heritage items the consent authority must notify the Heritage Council (cl 5.10(9)).
Consult Commonwealth body for airspace penetrations: if proposed development will penetrate the Limitation or Operations Surface for Scone Memorial Aerodrome, the consent authority must consult the relevant Commonwealth body and act on any objection or advice (cl 6.7(2)-(4)).
Duties of applicants / landowners
Obtain development consent where required: the Plan requires consent for subdivision (cl 2.6) and demolition (cl 2.7) and many land uses listed in the Land Use Table are “permitted with consent”; applicants must ensure compliance with applicable standards and provide required information.
Meet technical and regulatory preconditions for complying/exempt development: exempt development in Schedule 2 must meet BCA deemed‑to‑satisfy provisions and other listed conditions (cl 3.1); complying development must meet the specified development standards and Building Code obligations (cl 3.2).
Provide sufficient environmental information: for intensive livestock agriculture, aquaculture and earthworks, the consent authority must consider the adequacy of environmental statements or EISs and applicants must supply them (cl 5.18(3)(a); cl 6.1(3)(c)).
Ensure essential services and access: the consent authority must be satisfied that essential services are available or adequate arrangements are in place before granting consent (cl 6.10).
Abide by local activity controls: limits on home business/industry floor area, B&B room numbers, kiosk size, neighbourhood shop floorspace, secondary dwelling size and siting are mandatory controls to be applied (cl 5.4(1)-(9); cl 5.5).
Rights and entitlements
Exempt and complying development entitlement: where development falls squarely within Schedule 2 and Schedule 3 standards and other statutory requirements, applicants may proceed without the need for development consent (subject to other approvals under other Acts) (cl 3.1-3.2; Schedule 2; Schedule 3).
Ability to seek exceptions to standards: applicants may seek development consent to contravene a development standard under cl 4.6 by demonstrating compliance is unreasonable or unnecessary and there are sufficient planning grounds; the consent authority may grant consent if satisfied (cl 4.6(2)-(3)). The Plan outlines specific limits to this power (cl 4.6(6), (8)).
Replacement and repair rights after natural disaster: owners of lawfully erected dwelling houses and secondary dwellings in specified zones have a limited right to repair or replace dwellings damaged by natural disaster if a development application is made within five years (cl 5.9).
Temporary use rights: development consent may be granted for temporary uses of up to 52 days in any 12‑month period, subject to safeguards (cl 2.8). Temporary events on public reserves and roads may be carried out without development consent (cl 6.9), although other statutory approvals may still be required.
Suspension of private restrictions: the Plan suspends private covenants and similar instruments that restrict development to the extent necessary to allow Plan‑consistent development, with enumerated exceptions (cl 1.9A(1)-(3)). That suspension is not absolute and excludes covenants imposed by Council and specified public instruments (cl 1.9A(2)).
Limits and conditionalities
SEPPs prevailing: the Plan is subject to State environmental planning policies that prevail under section 3.28 of the Act (cl 1.9(1)). The Plan explicitly disapplies one regional SEPP (cl 1.9(2)).
Non‑exhaustive interaction with other Acts: exempt development under the Plan does not remove the need for other statutory approvals, licences or permits under other Acts, which remain enforceable (Schedule 2 Note 2; other cross references such as cl 5.12 and cl 1.9A).
Collectively, these duties and rights structure how the Council and applicants must act when proposing, assessing and implementing development in the Upper Hunter local government area.
Penalties and enforcement
The Plan itself is an environmental planning instrument that prescribes permitted and prohibited uses and assessment criteria; the text does not specify criminal penalties or pecuniary fines within its clauses. Enforcement and compliance with the Plan therefore operate through the administrative and statutory system established by the Environmental Planning and Assessment Act and linked legislation. From the Plan text the principal enforcement mechanisms and consequential processes are the following.
Administrative enforcement pathways and conditions
Development consent and conditions: the Plan requires development consent for many categories of development (for example subdivision cl 2.6; demolition cl 2.7; conservation‑sensitive works cl 5.10). The consent authority can refuse consent or grant consent subject to conditions that control how the development proceeds (through conditions embedded in consent instruments and compliance checks post‑approval). The Plan allows the consent authority to require covenants to be registered as a condition of consent to prevent “double dipping” in floor space allocation (cl 4.5(9)-(10)).
Exempt/compliant development limits and other Acts: the Plan warns that exempt development under the Plan or SEPP may still require approvals, licences or permits under other Acts; therefore failure to obtain such approvals remains a separate enforcement exposure (Schedule 2 Note 2).
Record‑keeping and administrative transparency: the Plan requires the consent authority to keep a record of assessments under cl 4.6(4) when considering contraventions of development standards. That record‑keeping supports internal administrative accountability and could be relevant to external review processes under the Act (cl 4.6(2)-(4)).
Statutory and inter‑agency enforcement linkages
Cross‑referenced Acts for enforcement: the Plan repeatedly cross‑references other statutes and instruments that have their own compliance and enforcement regimes. Examples: Heritage Act 1977 (heritage matters cl 5.10), National Parks and Wildlife Act 1974, Land Acquisition (Just Terms Compensation) Act 1991 (owner‑initiated acquisition and s 23 referenced in cl 5.1 note), Rural Fires Act 1997 (bush fire hazard reduction cl 5.11). Non‑compliance with provisions of those Acts where relevant can attract their respective enforcement mechanisms.
Notifications and consultations that trigger separate agency responses: where the consent authority must notify the Heritage Council or local Aboriginal communities (cl 5.10(7)-(9)), responses from those bodies may produce conditions, advice or other agency actions that affect the development outcome. For airspace penetrations, a Commonwealth body’s objection will bar consent (cl 6.7(3)-(4)).
Indirect enforcement by civil avenues
Private rights and common law: Schedule 2 notes that exempt development remains subject to adjoining owners’ property rights and the common law (Schedule 2 Note 2). That means neighbours may pursue civil remedies (nuisance, trespass, nuisance injunctions or other property remedies) if rights are infringed, even if planning consent is not required. The Plan does not change those civil law entitlements.
Administrative remedies under planning legislation
The Plan sits within the Environmental Planning and Assessment framework. The Plan references Division 3.5 of the Act in the savings note (cl 1.8A), which governs amendment processes and the consideration of applications where an instrument is required to permit development. Administrative review, merits review and judicial review mechanisms are established under the Act and associated regulations; the Plan itself does not restate those mechanisms but must be applied within them.
Limitations of the instrument as an enforcement text
The Plan does not list penalties, infringement notices or prescribed fines. Enforcement in practice will therefore flow from the statutory enforcement and compliance mechanisms available under the Environmental Planning and Assessment Act, the cross‑referenced Acts (heritage, Crown land, local government, Crown acquisition) and common law remedies. The Plan’s chief enforcement tools are the conditioning power attached to development consent, the map‑driven prohibition or permission of uses, the requirement for essential services (cl 6.10), and the suspension of covenants (cl 1.9A) which shifts certain private enforcement dynamics.
For practitioners, the operative point is that compliance and enforcement are administered through development consent and inter‑agency processes; the Plan specifies what is permitted and the assessment tests to be satisfied, but enforcement action and penalties are derived from the wider legislative framework it sits inside.
How it interacts with other laws
The Plan is expressly embedded within and cross‑linked to other legislation and State instruments; it does not operate in isolation. The Plan’s text repeatedly directs users to related Acts, State Environmental Planning Policies (SEPPs), technical guidelines and Australian Standards. Key interactions evident in the Plan text are set out below.
Precedence of SEPPs and State instruments
The Plan is subject to any State environmental planning policy that prevails under section 3.28 of the Environmental Planning and Assessment Act (cl 1.9(1)). The Plan also lists an SEPP that does not apply (Hunter Regional Environmental Plan 1989 (Heritage) at cl 1.9(2)). Exempt and complying development regimes under the State SEPP (Exempt and Complying Development Codes) remain relevant: the Plan’s own Schedule 2 and Schedule 3 are supplemental to the State SEPP, and Note 1 and 2 in Schedule 2 make that relationship explicit (Schedule 2 notes; cl 3.1-3.2).
Environmental and natural resources statutes
Heritage: the Plan cross‑references the Heritage Act 1977 in defining State Heritage Register items and in procedure references (cl 3.1(3)(d); cl 5.10). The consent authority must notify the Heritage Council in some cases (cl 5.10(7), (9)). Heritage management documents and conservation management plans are regulatory instruments the council can require (cl 5.10(5)-(6)).
National Parks and related Acts: the Plan references the National Parks and Wildlife Act 1974 in multiple places (cl 1.9A(2)(c); cl 5.2) concerning trusts, reservations and uses on land reserved under that Act.
Biodiversity and fisheries: the Plan references the Biodiversity Conservation Act 2016 (areas of outstanding biodiversity value) and the Fisheries Management Act 1994 and its aquaculture instruments; Schedule 6 and cl 5.19 require aquaculture to be consistent with aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19(5)-(7); Schedule 6).
Local Land Services, Native Vegetation and Crown land: the Plan cross‑refers to the Local Land Services Act 2013, Native Vegetation Act 2003 (repealed but referenced), Crown Land Management Act 2016 and others (cl 1.9A(2)(b),(e); cl 3.1 Note; cl 1.9A(3)).
Local government and land acquisition
Local Government Act 1993: the Plan authorises Council to classify or reclassify public land under Part 2 of Chapter 6 of the Local Government Act 1993 (cl 5.2). Schedule 4 exercises that function for specified parcels. The Plan also highlights that reclassification of public reserves may require the Governor’s approval under the Local Government Act (cl 5.2(5) note).
Land Acquisition (Just Terms Compensation) Act 1991: the Plan identifies the relevant State authorities for owner‑initiated acquisition of reserved land and notes the s 23 hardship acquisition obligation in the Land Acquisition Act (cl 5.1 and note).
Building Code, BASIX and other regulatory overlaps
Exempt and complying development provisions require compliance with the Building Code of Australia (cl 3.1(3)(a); cl 3.2(3)(b)). Clause 4.6(8) expressly excludes development standards relating to complying development and BASIX commitments from the scope of cl 4.6 variations. The Plan also references AS 2021-2000 (aircraft noise) for developments affected by aerodrome noise contours (cl 6.8(3)(b)-(c)).
Emergency services, rural fire and environmental hazard regimes
The Plan authorises bush fire hazard reduction work under the Rural Fires Act 1997 without development consent (cl 5.11) and engages evacuation and hazard considerations in flood planning, linking to the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.21(4)-(5); cl 5.22(4)-(5)).
Crown, State and Commonwealth approvals and consultation
The Plan preserves the Crown’s use of existing Crown buildings and does not restrict development by public authorities that is permitted by State SEPPs (cl 5.12). For aerodrome limitations, the Plan requires consultation with the relevant Commonwealth body and will not permit consent where that body objects (cl 6.7(2)-(4)). Suspension of covenants does not affect rights or interests of public authorities under registered instruments (cl 1.9A(3)).
Practical consequences of interactions
Applicants must navigate a package of approvals: planning consent under the Plan, complying/exempt development rules and other approvals under heritage, transport, Crown land, water, fisheries, and building laws as relevant (Schedule 2 Note 2; cl 5.12). The Plan delegates detailed technical standards to external guidelines and industry development plans (for example aquaculture industry development plans, Considering Flooding guideline, AS 2021-2000) and makes those external standards mandatory considerations in consent assessment (cl 5.19(2)(a); cl 5.21(4)-(5); cl 6.8(3)).
In short, the Plan is integrated into a multi‑layered legal landscape: SEPPs and State instruments can prevail; listed State and Commonwealth bodies have consultation or veto roles in defined circumstances; heritage, environmental and water regimes intersect and impose separate compliance obligations; and complying/exempt development rules under State SEPPs remain central to the low‑impact pathway.
Amendment history
The Plan text carries embedded amendment annotations. These annotations identify multiple changes made since the Plan’s original making and provide discrete timestamps in the instrument. The Plan itself contains amendment footnotes that should be read as the authoritative record of textual edits. Below are the amendments and insertions expressly recorded in the text provided.
Notable amendments and insertions recorded in the Plan text
Clause 1.8A (Savings provision relating to development applications) shows amendments: Amended 2019 (621), Sch 5[1]; amended 2023 (609), Sch 1.1[1]. The clause also specifically addresses treatment of development applications made before commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 (cl 1.8A(2)).
Clause 1.9A (Suspension of covenants, agreements and instruments) records amendment: Am 2019 (621), Sch 5[2]-[4]. The Governor’s approval under s 3.16 of the Act is recorded in the clause (cl 1.9A(4)).
Clause 2.1 (Land use zones) contains an amendment note: Am 2022 (831), Sch 1.25[1] indicating later modification of zonal nomenclature or insertion of zones.
Clause 4.1AA (Minimum subdivision lot size for community title schemes) is noted as Am 2022 (831), Sch 1.25[3].
Clause 4.1A and 4.1C (strata plan and split zone minimum lot sizes) annotated Am 2022 (831), Sch 1.25[3], with cl 4.1A also indicating a prior insertion note [4].
Clause 4.1B (Exceptions to minimum lot sizes for certain residential development) indicates Am 2022 (831), Sch 1.25[5].
Clause 4.1D (Boundary changes between lots) Am 2022 (831), Sch 1.25[3] and notes [4].
Clause 4.2B (Erection of dwelling houses on land in certain rural and conservation zones) shows Am 2022 (831), Sch 1.25[3] [4].
Clause 4.2C (rural workers’ dwellings) appears without amendment note in the provided text but is located in the same Part.
Clause 4.6 (Exceptions to development standards) contains repeals and amendments; it notes repealed subclauses and specific exclusions that have been updated , the legislation text shows repeals and amendments but does not list the full amendment dates at cl 4.6 heading; however a number of subsequent insertions in other clauses refer to 2017, 2018, 2019, 2021, 2022 and 2023 as dates of changes elsewhere.
Clause 5.9 (Dwelling house or secondary dwelling affected by natural disaster) is recorded as inserted 2021 (302), Sch 1.29 and amended 2022 (831), Sch 1.25[3].
Clause 5.22 (Special flood considerations) was substituted 2023 (609), Sch 1.1[2] and replaced relevant prior wording.
Clause 6.2 has been repealed: cl 6.2: Rep 2021 (225), Sch 1.
Schedule 1 and Schedule 2 both carry amendment annotations indicating Am 2016, 2017, 2018, 2019 and 2022 changes in various subclauses and notes (for example Schedule 1: Am 2016 (27), cl 5; 2016 (482), cl 4; 2022 (831), Sch 1.25[7] [8]; Schedule 2: Am 2022 (831), Sch 1.25[9]-[14]).
Schedule 4 contains a note Am 2016 (40), cl 4 (1) (2); 2024 (308), Sch 1 , indicating a 2024 update to Schedule 4 in the provided text (Schedule 4: sch 4: Am 2016 (40), cl 4 (1) (2); 2024 (308), Sch 1).
Map updates: Maps are annotated as amended in 2015 and 2016 (Entries discontinued from July 2021 when responsibility for map updates moved to the Department of Planning, Industry and Environment) (Schedule 4 note).
Implications for readers
The Plan text shows multiple iterative amendments, additions and repeals over time, reflecting refinements to minimum lot size rules (including special rules for strata/community title schemes), flood and disaster repair rights, biodiversity and aquaculture controls, and other local provisions. Where the Plan contains an amendment footnote, practitioners should check the cited amending instrument (for example the State Gazette references given in the bracketed amendment annotations) for precise change language, commencement dates and transitional provisions.
Several amendments are recent (2021-2024) and affect flood planning (notably cl 5.21 and cl 5.22 amendments/substitutions in 2023), minimum lot size regimes (2022), and public land mapping (2024). Those recent modifications alter substantive development entitlements in hazard, subdivision and public land classification domains.
This embedded amendment history in the document should be used as a starting point; practitioners should confirm the current consolidated text and the precise commencement dates of amendments when advising clients or lodging/assessing applications.
Litigation history
The Plan text provided does not record any litigation history and names no cases. It is an environmental planning instrument, not a judgment or case database, and so does not include judicial determinations or summaries of litigation. From the Plan itself the following procedural and evidentiary features are relevant to potential legal challenges or administrative review, and therefore to the litigation and dispute anatomy that may follow from planning decisions.
Administrative record and reviewability
The Plan requires the consent authority to keep a record of its assessment where a development standard contravention is considered under cl 4.6(4). That administrative record will be pertinent to any subsequent merits or judicial review of the decision because it documents the reasoning required by the clause.
The Plan prescribes notification steps and minimum consultation windows for heritage and Aboriginal matters (cl 5.10(7)-(9)). Failure to follow those prescribed notice steps could be a ground for administrative challenge if they are mandatory procedural prerequisites to valid consent.
Statutory pathways that generate reviewable decisions
Decisions about development consent under the Plan are administrative decisions made by the consent authority (Council). The Plan embeds a framework of mapped standards, assessment criteria and cross‑agency consultation obligations (for example cl 6.7 requiring consultation with the relevant Commonwealth body for aerodrome airspace issues). Those decisions will be amenable to the review mechanisms provided by the Environmental Planning and Assessment Act (for example merits review, where available, and judicial review) , the Plan references the Act but does not itself establish those review routes.
Evidence‑based decision making
For categories such as intensive livestock agriculture, aquaculture and flood risk, the Plan requires environmental statements, EISs or other technical demonstrations (cl 5.18(3)(a); cl 5.19(2)(a); cl 5.21(3)). The adequacy of that material and whether the consent authority properly considered it are common focal points in post‑decision proceedings.
Common procedural contest points (borne out by the Plan’s content)
Whether a development is exempt or complying and thus not requiring development consent (cl 3.1-3.2; Schedule 2; Schedule 3) can be contested and may trigger disputes about the factual application of technical criteria (BCA compliance, BCA classification, heritage overlay applicability).
The exercise of discretion under cl 4.6 (exceptions to development standards) rests on the consent authority’s assessment of “unreasonable or unnecessary” compliance and “sufficient environmental planning grounds” (cl 4.6(3)). Those are fact‑sensitive assessments that generate reviewable decisions and, where inadequately reasoned, are often targets of review.
Heritage and Aboriginal consultation steps are procedural hooks that may be relied on in challenges where notice or consultation obligations were not followed (cl 5.10(5), (7)-(8)).
Absence of named cases
Because the Plan does not itself name any cases, practitioners seeking to understand litigation trends or judicial interpretation of similar LEP provisions must look to the broader case law under the Environmental Planning and Assessment Act and decisions involving equivalent clauses (for example exceptions to standards, heritage notification obligations, and flood planning rules). The Plan’s cross‑references and record‑keeping obligations provide the structural basis for review, but the document does not provide case outcomes.
In short, the Plan creates administrative decisions that are likely reviewable under the broader planning statutes; the Plan contains procedural and evidential anchors (mapping, records, consultation steps, technical requirements) that materially affect the strengths and weaknesses of any judicial or merits review challenge, but it does not itself record litigation history or judicial interpretations.
Gotchas
This Plan contains multiple features that commonly lead to practical missteps. The following “gotchas” are grounded in the instrument’s text and set out concrete traps for applicants, owners, consent authorities and advisers.
Savings and pre‑commencement applications
Development applications lodged before the Plan’s commencement must be determined as if the Plan had not commenced (cl 1.8A(1)). However cl 1.8A(2) highlights an exception in relation to development applications made, but not finally determined, before commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023, which must be determined as if that policy had not commenced. Practitioners must check timing and sequencing of multiple instruments; failing to apply the correct “snapshot” legal regime at determination can lead to re‑exposure and administrative challenge.
Suspension of covenants is qualified
Clause 1.9A suspends private covenants, agreements and similar instruments “to the extent necessary” to enable development under the Plan. That suspension explicitly excludes covenants imposed by the Council and several categories of public or conservation instruments (cl 1.9A(2)(a)-(g)). It also does not affect rights or interests of any public authority under any registered instrument (cl 1.9A(3)). Practitioners should not assume a blanket suspension; check whether the particular covenant falls into one of the statutory exceptions.
Complex minimum lot size regime
Minimum lot sizes are governed by the Lot Size Map (cl 4.1), but there are many exceptions and special rules: community title schemes (cl 4.1AA), strata plan schemes in certain rural and conservation zones (cl 4.1A), exceptions for residential infill (cl 4.1B), split zone rules (cl 4.1C), boundary changes (cl 4.1D), rural subdivision flexibilities (cl 4.2) and exceptions for certain rural subdivisions (cl 4.2A). The access handle exclusion for battle‑axe lots when calculating lot area (cl 4.1(3A)) is another detail easily overlooked. Failure to apply the correct clause can invalidate a subdivision proposal or lead to a refusal.
Double‑dipping on floor space and covenants
Clause 4.5(9) enables conditions requiring covenants to prevent creation of equivalent floor area on another lot to “double‑dip” the site's floor space entitlement. Conversely, existence of such covenants reduces the floor space available to other parts of consolidated sites (cl 4.5(10)). Drafting and stamping of covenants at the consent stage are therefore critical and can produce ongoing constraints on development across multiple lots.
Exempt and complying development limitations
Exempt development needs to meet BCA deemed‑to‑satisfy provisions and must not be on land listed on the State Heritage Register or subject to an interim heritage order (cl 3.1(3)(a),(d)). Schedule 2 emphasises exempt development does not remove the need for approvals under other Acts (Schedule 2 Note 2). Practitioners must check heritage listings, Aboriginal heritage sensitivities and other statutory licensing (for example water, fisheries) before assuming an activity is permitted without consent.
Heritage procedural traps
The Plan gives the consent authority power to treat minor heritage works as exempt if the consent authority is satisfied in writing that the proposed works are minor or for maintenance and will not adversely affect heritage significance (cl 5.10(3)(a)). That satisfaction must be provided in writing before work is carried out. Proceeding without such written confirmation risks non‑compliance.
Flood and climate linkage
Flood planning (cl 5.21) and special flood considerations (cl 5.22) require the consent authority to be satisfied development is compatible with flood function and behaviour, considering projected changes from climate change and reference to the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.21(4)-(5)). Applicants that provide insufficient climate‑sensitive flood modelling or neglect evacuation route capacity considerations risk refusal.
Music and licensed premises protections
Clause 5.20 restricts the consent authority’s grounds for refusal in relation to licensed premises where the objection is based on the playing or performance of music, the genre, live or amplified status, whether dancing occurs, presence of dance floor, stage orientation, decorations or lighting (cl 5.20(1)). The consent authority must not refuse on noise grounds if satisfied the noise may be managed to an acceptable level (cl 5.20(2)). Neighbours and councils accustomed to using noise as a reason for refusal must ensure they base any refusal on evidence that management is not feasible, rather than on the enumerated artistic features.
Airspace and airport safety veto
For development that will penetrate the Limitation or Operations Surface for Scone Memorial Aerodrome, the consent authority must consult the relevant Commonwealth body and must not grant consent if that body advises the development should not be constructed (cl 6.7(2)-(4)). That is an absolute gate where an objecting Commonwealth body will prevent consent.
Aquaculture and discharge limits
Pond/tank aquaculture that is intensive must have ponds capable of being drained and dried (Schedule 6 cl 3) and must not discharge freshwater used in intensive cultivation to natural waterbodies except for open flow‑through systems (Schedule 6 cl 4). Oyster aquaculture has additional mapped exemptions for priority oyster aquaculture areas but must still be reconciled with aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19(5)-(6)). Failure to design operations to these operational requirements will attract refusal.
Not adopted or not applicable clauses
Several clauses are explicitly “Not adopted” or “Not applicable” in the Plan (for example cl 5.7 Development below mean high water mark; cl 5.14 Siding Spring Observatory; cl 5.15 Defence communications facility; cl 5.17 Artificial waterbodies in environmentally sensitive areas; cl 5.23 Public bushland; cl 5.24 Farm stay accommodation; cl 5.25 Farm gate premises). Confusion can arise where users assume the Plan contains operative provisions for these topics; the text explicitly signals non‑adoption.
Events and other Act approvals
Temporary events on public reserves or roads are permitted without development consent (cl 6.9(2)), but other approvals remain required under other Acts, for example the Roads Act 1993 and Local Government Act 1993 (cl 6.9 note). Practitioners should not conflate development consent exemption with full statutory freedom to proceed.
In short, the Plan contains multiple detailed technical tests, map‑linked parameters and procedural conditions. Overlooking the exact mapping, the relevant clause for exceptions, or the necessity to obtain related non‑planning approvals are frequent practical errors.
How to comply
Compliance under this Plan is a mixture of spatial checking, technical demonstration and procedural fulfilment. The steps below translate the statutory clauses into a practical checklist for applicants, consent authorities and advisers. References in parentheses point to the clauses in the Plan that create the requirement.
Confirm the legal regime at the time of lodgement
Identify the relevant maps: Land Application Map, Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Drinking Water Catchment Map, Watercourse Map, Air Noise Exposure Forecast Map and any other relevant map (cl 1.3; cl 1.7; cl 2.2). Check the Plan’s amendment history annotations to ensure you are applying the current version of every clause.
Determine permissibility before preparing the application
Consult the Land Use Table (cl 2.3 and the Land Use Table) for the zone that applies to the site and categorise the proposed activity as permitted without consent, permitted with consent or prohibited. If the activity appears to be exempt or complying, check Schedule 2 and Schedule 3 for the exact technical conditions (cl 3.1-3.2; Schedule 2; Schedule 3).
If the site is unzoned, remember that development may be carried out only with development consent and the consent authority must be satisfied the development is compatible with adjoining zoned land’s objectives (cl 2.4).
Map overlays and environmental constraints
If the land is identified in any overlay map (Biodiversity Map, Groundwater Vulnerability Map, Drinking Water Catchment Map, Watercourse Map, Heritage Map, Flood Mapping), gather the necessary specialist studies early (cl 6.3-6.6; cl 5.10; cl 5.21-5.22). The consent authority will require evidence that the development will avoid, minimise or mitigate impacts; demonstrate these by design alternatives where avoidance is feasible (cl 6.3(4); cl 6.4(4); cl 6.5(4); cl 6.6(4); cl 5.21(2)).
Heritage matters and Aboriginal places
Where heritage items, archaeological sites or Aboriginal places are implicated, prepare a heritage management document or a heritage impact statement as necessary (cl 5.10(5)). Notify and consult with the Heritage Council and local Aboriginal communities where the Plan requires it and allow the statutory 28‑day response windows (cl 5.10(7)-(8)). If the proposal is minor maintenance and the consent authority provides written confirmation that consent is not required, secure that confirmation in writing before works commence (cl 5.10(3)(a)).
Flood and hazard proofing
For development in flood planning areas, prepare flood risk assessments that address flood function and behaviour, evacuation, safe occupation and capacity of evacuation routes, and projected climate change impacts in line with the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual (cl 5.21(2)-(5); cl 5.22). Address special flood considerations for sensitive and hazardous development types enumerated in cl 5.22(5).
Minimum lot size and subdivision technicalities
For subdivisions, confirm the Lot Size Map minimums and determine which exception clauses apply: general minimum (cl 4.1), community title schemes (cl 4.1AA), strata schemes (cl 4.1A), exceptions for residential infill (cl 4.1B), split zones (cl 4.1C), boundary adjustments (cl 4.1D), rural subdivision exceptions (cl 4.2; cl 4.2A). Remember the battle‑axe access handle exclusion from lot area calculations (cl 4.1(3A)).
Floor space ratio calculation and covenants
Apply the floor space ratio calculation rules and the site area definition (cl 4.5). Exclude land on which development is prohibited and community land except as provided (cl 4.5(4)). Where consent is proposed for consolidated sites, be prepared for covenant conditions preventing “double dipping” of FSR (cl 4.5(9)-(10)).
Variations to development standards
If the proposal contravenes a development standard, prepare a cl 4.6 justification that demonstrates why compliance is unreasonable or unnecessary and provides sufficient environmental planning grounds for the contravention; the consent authority must keep a record of its assessment (cl 4.6(2)-(4)). Check cl 4.6(6) and (8) for express exclusions and limitations (for example complying development standards and BASIX commitments cannot be displaced under cl 4.6).
Essential services and infrastructure evidence
Demonstrate availability or appropriate arrangements for essential services,water, electricity, sewage disposal/management, stormwater drainage and suitable vehicular access,before the consent authority can grant consent (cl 6.10).
Specific use controls
Apply the numerical limits for particular uses: B&B bedroom limits (cl 5.4(1)); home business/home industry floor area limits (cl 5.4(2)-(3)); industrial retail and artisan food retail limits (cl 5.4(4), cl 5.4(10)); kiosks, roadside stalls and neighbourhood shop sizes (cl 5.4(6)-(8)); secondary dwelling size and distance constraints depending on zone (cl 5.5). Use these as checklist items when preparing plans and statements.
Licensed premises and music
For licensed premises, include a noise management plan where music is proposed. Note that the consent authority must not refuse consent on enumerated grounds about the music itself and must not refuse where noise can be managed to an acceptable level (cl 5.20(1)-(2)). Evidence of management measures will be essential.
Aquaculture and intensive livestock
For pond/tank aquaculture or intensive livestock agriculture, adhere to the operational and site location requirements in cl 5.18, cl 5.19 and Schedule 6 (for example pond design, no freshwater discharge to natural waterbodies for intensive operations except open flow‑through systems, exclusion zones). Provide evidence of compliance with relevant aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy where applicable (cl 5.19(2)-(6)).
Airspace and aerodrome constraints
If the development might penetrate Scone Memorial Aerodrome surfaces, consult early with the relevant Commonwealth body and ensure design conforms to AS 2021-2000 where required; an adverse advisory from the Commonwealth body can bar consent (cl 6.7; cl 6.8).
Public land and acquisition considerations
If the land is subject to Land Reservation Acquisition Map entries or appears in Schedule 4 classification/reclassification lists, review cl 5.1 and cl 5.2. For owner‑initiated acquisition concerns, be aware of the authority designated as the acquiring agency (cl 5.1(2) table) and the Land Acquisition Act s 23 note.
Procedural diligence and cross‑agency approvals
Obtain or confirm in writing any approvals required under other statutes (Heritage Act, Fisheries Management Act, Crown land licensing, Roads Act, Local Government Act, Water licensing). For temporary events on public reserves or roads, obtain any necessary approvals under the Roads Act 1993 and Local Government Act 1993 (cl 6.9(2) note).
Record keeping and decisions
Consent authorities must retain records where cl 4.6 is utilised (cl 4.6(4)). Applicants should keep all evidence, consultation correspondence and technical reports to support decisions and to withstand potential administrative review.
Check exclusions and “not adopted” entries
Confirm whether any clause is “Not adopted” or “Not applicable” before relying on it (for example several clauses are explicitly marked Not adopted in the text). Do not assume clauses are operative if the Plan indicates otherwise.
This checklist converts the Plan’s statutory requirements into staged tasks: map and zoning identification; permissibility assessment; environmental, heritage and hazard studies; technical design to meet operational controls; cross‑agency consultations and approvals; application lodgement with full evidence; and securing and implementing consent conditions, including any covenanting or covenant discharge required. Follow the clause citations above to match each step to the Plan provision that creates the duty.
(d) to manage the urban areas of the Upper Hunter by strengthening retail centres and employment opportunities, promoting appropriate tourism development, guiding affordable urban form and providing for the protection of heritage items and precincts,
(e) to promote ecologically sustainable urban and rural development and control the development of flood liable land,
(f) to secure a future for agriculture by expanding the Upper Hunter’s economic base and minimising the loss or fragmentation of productive agricultural land,
(g) to protect, enhance and provide for biological diversity, including native threatened species, populations and ecological communities, by long-term management and by identifying and protecting habitat corridors and links throughout the Upper Hunter.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Merriwa Local Environmental Plan 1992
Murrurundi Local Environmental Plan 1993
Scone Local Environmental Plan 1986
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
Hunter Regional Environmental Plan 1989 (Heritage)
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU4 Primary Production Small Lots
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E4 General Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP1 Special Activities
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
cl 2.1: Am 2022 (831), Sch 1.25[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, s
This is an opening excerpt, not the complete document.