Transport Infrastructure (Dangerous Goods by Rail) Regulation 2018
sec.115Duties of transferors—hose assemblies
Start here
Get a plain-English read of sec.115
Turn the raw legal text into a practical explanation grounded in Transport Infrastructure (Dangerous Goods by Rail) Regulation 2018.
sec.115 Duties of transferors—hose assemblies
A person must not use a hose assembly for the bulk transfer of dangerous goods if the person knows, or ought reasonably to know, that the assembly is damaged or defective to the extent that it is not safe to use to transfer the goods. Maximum penalty—30 penalty units. A person must not use a hose assembly for the bulk transfer of dangerous goods if the person knows, or ought reasonably to know, that the hose assembly— has not been constructed, assembled or maintained in accordance with chapter 10.1 of the ADG Code; or has not been inspected or tested at the intervals, or in the way, required under that chapter; or did not satisfy a test under that chapter. Maximum penalty—40 penalty units. (sec.115-ssec.1) A person must not use a hose assembly for the bulk transfer of dangerous goods if the person knows, or ought reasonably to know, that the assembly is damaged or defective to the extent that it is not safe to use to transfer the goods. Maximum penalty—30 penalty units. (sec.115-ssec.2) A person must not use a hose assembly for the bulk transfer of dangerous goods if the person knows, or ought reasonably to know, that the hose assembly— has not been constructed, assembled or maintained in accordance with chapter 10.1 of the ADG Code; or has not been inspected or tested at the intervals, or in the way, required under that chapter; or did not satisfy a test under that chapter. Maximum penalty—40 penalty units.
- (a) has not been constructed, assembled or maintained in accordance with chapter 10.1 of the ADG Code; or
- (b) has not been inspected or tested at the intervals, or in the way, required under that chapter; or
- (c) did not satisfy a test under that chapter.