This Plan sets the local land‑use rules for Tenterfield: it maps zones and permissible uses, tells which development needs consent or is exempt/complying, sets subdivision lot sizes and rural controls, and imposes heritage, environmental, flood and operational requirements.
It affects landowners, developers and the Council (the consent authority): applicants pay application and compliance costs (permits, assessments, infrastructure) and the Council decides applications under discretionary clauses and map‑based limits.
Mechanically, the instrument reproduces Tenterfield Local Environmental Plan 2013 (the Plan) as the local environmental planning instrument applying to the land identified on the Land Application Map. It sets the operative zoning framework, land‑use permissions, development consent thresholds, and planning controls that govern land use, subdivision and development in the Tenterfield local government area. The consent authority for the Plan is the Council (cl 1.6). The Plan commenced on publication on the NSW legislation website (cl 1.1AA).
Key mechanical elements:
Zoning and maps: land is placed into zones listed at cl 2.1 and shown on the Land Zoning Map (cl 2.2); nominated maps (Land Zoning, Lot Size, Heritage, Sensitive Land, Designated Buffer, Rural Residential Subdivision and others) are adopted and may be amended in accordance with the Plan (cl 1.7).
Land use permissions: the Land Use Table in Part 2 sets, for each zone, objectives, development permissible without consent, development permissible only with consent and prohibited development (cl 2.3). Additional permitted uses may be specified in Schedule 1 (cl 2.5). Exempt and complying development schedules are provided at Schedules 2 and 3 and are governed by Part 3 (cls 3.1-3.3).
Development consent requirements and limits: subdivision always requires development consent (cl 2.6), demolition requires consent (cl 2.7), temporary uses are permitted only up to 28 days in any 12 month period subject to test criteria (cl 2.8) and canal estate development is prohibited (cl 2.9).
Standards and flexibility: principal development standards are set (Part 4) including minimum lot sizes (cl 4.1) and a mechanism for limited exceptions to development standards (cl 4.6) with a record‑keeping obligation where standards are varied (cl 4.6(4)). Several standard clauses (height, FSR) are noted as not adopted.
Current sections
Direct links to the current provisions in Tenterfield Local Environmental Plan 2013.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2016 (709), Sch 1 [2]; 2019 (402) cl 5 (2); 2020 (388), Sch 1[1].
Zone RU1 Primary Production
Zone RU5 Village
Zone SP2 Infrastructure
Zone C1 National Parks and Nature Reserves
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Aquaculture; Dwelling houses; Extractive industries; Intensive livestock agriculture; Open cut mining; Roadside stalls; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Nil
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
Note.
When this Plan was made it did not include Zone RE1 Public Recreation or Zone SP2 Infrastructure.
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2013 No 47, Sch 2.30.
sch.2-sec
Signage—general requirements
sch.2-sec Signage—general requirements
Signage—general requirements
(1) Must be non-moving.
(2) Must be at least 700mm from kerb or roadway edge of a public road.
(3) Must be at least 2.6m above any public footpath.
(4) Must relate to the lawful use of the building (except for temporary signs or tourist information or directional signs).
(5) Must not be detrimental to the character and functioning of the building.
(6) Must not cover mechanical ventilation inlet or outlet vents.
(7) Must not be externally illuminated.
(8) Must not be flashing.
(9) Must not be located on a heritage item.
sch.2-sec-oc.2
Signage—signs on residential accommodation
sch.2-sec-oc.2 Signage—signs on residential accommodation
Signage—signs on residential accommodation
(1) Must meet the general requirements for signage.
(2) Maximum 2 signs per premises.
(3) Maximum area—1m2.
(4) Maximum height—3m.
sch.2-sec-oc.3
Signage—signs on business or industrial premises
sch.2-sec-oc.3 Signage—signs on business or industrial premises
Signage—signs on business or industrial premises
(1) Maximum 3 signs per premises.
(2) Must be one of the following types of signs—
(a) top hamper sign—maximum area of 2.5m2,
(b) under awning sign—maximum area of 1.5m2,
(c) projecting wall sign—maximum area of 2.5m2,
(d) flush wall sign that does not extend above the top of the wall to which it is attached—maximum area of 2.5m2.
(3) Must not be internally illuminated unless—
(a) the sign is not in continuous or intermittent motion, and
(b) the display is not varied at pre-set timing intervals.
sch.2-sec-oc.4
Signage—real estate signs (advertising premises or land for sale or lease)
sch.2-sec-oc.4 Signage—real estate signs (advertising premises or land for sale or lease)
Signage—real estate signs (advertising premises or land for sale or lease)
(1) Must meet the general requirements for signage.
(2) Must be located within the curtilage of the premises.
(3) Maximum area for signs on residential premises—2.5m2.
(4) Maximum height—6m.
(5) Must be removed within 14 days after premises or land is sold or let.
(6) Maximum 2 signs per premises.
sch.2-sec-oc.5
Signage—signs behind the glass line of a shop window
sch.2-sec-oc.5 Signage—signs behind the glass line of a shop window
Signage—signs behind the glass line of a shop window
(1) Must meet the general requirements for signage.
(2) Must not be located in sex services premises or restricted premises.
sch.2-sec-oc.6
Signage—temporary signs (special events or venues for exhibitions or demonstrations)
sch.2-sec-oc.6 Signage—temporary signs (special events or venues for exhibitions or demonstrations)
Signage—temporary signs (special events or venues for exhibitions or demonstrations)
(1) Must meet the general requirements for signage.
(2) Maximum area—5m2.
(3) Maximum height—6m.
(4) Must not be displayed earlier than 28 days before, or later than 14 days after, the event.
(5) Must not obstruct the sight line of vehicular traffic.
sch.2-sec-oc.7
Signage—sponsorship signs
sch.2-sec-oc.7 Signage—sponsorship signs
Signage—sponsorship signs
(1) Must meet the general requirements for signage.
(2) Maximum height—6m.
(3) Must include only the name or logo of any event sponsors.
(4) Must be located and oriented to be predominantly visible to spectators within the site rather than to the general public externally.
(5) Must not obstruct the sight line of vehicular traffic.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Tenterfield Local Environmental Plan 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Tenterfield in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the orderly management, development and conservation of resources by protecting, enhancing and conserving—
(i) land of significance for agricultural production, and
(ii) timber, minerals, soils, water and other natural resources, and
(iii) areas of high scenic or recreational value, and
(iv) native plants and animals, including threatened species, populations and ecological communities, and their habitats, and
(v) places and buildings of heritage significance,
(b) to provide a choice of living opportunities and types of settlements,
(c) to facilitate development for a range of business enterprise and employment opportunities,
(d) to ensure that development is sensitive to both the economic and social needs of the community, including the provision of community facilities and land for public purposes.
1 Land to which Plan applies
1 Land to which Plan applies
1.3 Land to which Plan applies
Sector and activity‑specific controls: the Plan contains targeted controls for heritage (cl 5.10 and Schedule 5), bush fire hazard reduction (cl 5.11), intensive livestock agriculture thresholds and locational limits (cl 5.18), aquaculture site and operational requirements (cl 5.19 and Schedule 6) and flood planning criteria (cl 5.21).
Public land and acquisition: the Plan identifies the “relevant acquisition authority” for owner‑initiated acquisitions of reserved land on the Land Reservation Acquisition Map (cl 5.1) and classifies or reclassifies specific public land as operational or community land in Schedule 4 (cl 5.2).
Covenants and agreements: the Plan includes a head‑power to suspend covenants and similar instruments that would otherwise restrict development where necessary to give effect to the Plan, subject to a list of exemptions (cl 1.9A).
Town planning detail and local variations: it lists exempt signage requirements (Schedule 2), thresholds for home businesses, bed and breakfast and other small scale uses (cl 5.4), and localised provisions such as development within the Tenterfield Saleyards designated buffer (cl 6.6).
The Plan states its aims as protecting and promoting a range of land uses (including arts and cultural activity), conserving natural and heritage values, encouraging orderly and diverse settlement and facilitating a range of business and employment opportunities (cl 1.2). Those are the declared policy objectives; the provisions cited above constitute the legal mechanics by which those objectives are implemented.
What the Plan does not do, as expressed in the text: it does not adopt several optional development standards (height, FSR) (cls 4.3-4.5 are not adopted), it does not itself set out monetary penalties or offence provisions, and many operational enforcement matters remain within the procedural framework of the Environmental Planning and Assessment Act and associated regulations referenced in the Plan.
Main concepts
The Plan organises land regulation around a small set of interlocking concepts: zoning, development consent, exempt/complying development, mapped standards, and targeted provisions for particular activities or sensitivities.
Zoning and objectives. The Plan adopts conventional NSW LEP zoning (cl 2.1), with primary rural, village, infrastructure and national park/nature reserve zones. For each zone the Plan records objectives to guide decision making and the Land Use Table prescribes what is permitted without consent, permitted with consent and prohibited (cl 2.3; Land Use Table). The consent authority must have regard to zone objectives when deciding applications (cl 2.3(2)).
Maps and spatial overlays. The Plan relies heavily on spatial instruments: the Land Zoning Map, Lot Size Map, Land Application Map, Heritage Map, Sensitive Land Map, Designated Buffer Map and others (cl 1.7; cl 2.2; multiple cross references). These maps determine where particular controls apply, for example lot size minima (cl 4.1), “RRS” Rural Residential Subdivision areas (cl 4.2C), and sites subject to special provisions such as the Tenterfield Saleyards buffer (cl 6.6).
Consent categories and streamlined tracks. The Plan distinguishes development requiring a development application and consent from two streamlined alternatives:
Exempt development in Schedule 2, subject to standards in Part 3 (cl 3.1).
Complying development in Schedule 3 and cl 3.2, where a complying development certificate may be issued provided the proposal meets specific deemed‑to‑satisfy or development standards.
Development standards and exceptions. The Plan sets primary development standards (notably minimum lot sizes in Part 4) and gives the consent authority a limited ability to grant consents that contravene development standards where the applicant demonstrates that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds (cl 4.6(3)). The clause also records specific prohibitions on the use of cl 4.6 in certain subdivision contexts and for particular development standards (cl 4.6(6), (8)).
Targeted controls for activity‑types and sensitivities. The Plan embeds site‑ and activity‑specific regimes:
Heritage: an explicit requirement for development consent for works affecting heritage items, Aboriginal objects and archaeological sites, plus the consent authority’s power to require heritage management documents or conservation management plans (cl 5.10).
Flood risk: tests for development in flood planning areas including compatibility with flood function, risk to life and changes due to climate change (cl 5.21).
Intensive livestock agriculture: capacity thresholds and locational setbacks where small scale operations may proceed without consent, and matters to be considered when consenting intensive livestock (cl 5.18).
Aquaculture: detailed site and operational requirements for pond, tank and oyster aquaculture including exclusion zones and operational limits (cl 5.19 and Schedule 6).
Temporary use: temporary use consent allowed up to 28 days in any 12 month period with tests to protect amenity and future development (cl 2.8).
Public land and acquisition. The Plan nominates the State authority to acquire reserved land under owner‑initiated acquisition provisions and classifies listed parcels of public land as operational or community land (cl 5.1-5.2; Schedule 4). The Plan also records conditions and trust discharges for specific parcels (cl 5.2(5) and Schedule 4 parts).
Suspension of private encumbrances. Clause 1.9A empowers the Plan to render agreements, covenants and similar instruments inoperative to the extent necessary to allow development that is permissible under the Plan, while specifying categories of agreements that are not affected and preserving public authority interests (cl 1.9A(1)-(3)).
Administrative prescripts. The Plan records administrative requirements such as the consent authority record‑keeping obligation when varying development standards (cl 4.6(4)), notification obligations when dealing with archaeological and some State heritage items (cl 5.10(7)-(9)), and that notes in the Plan are guidance only (cl 1.5).
Together these concepts allocate decision rights to the Council as consent authority, set the universe of permissible activities by zone and map, and create carve outs and procedural steps for specific land uses and sensitivities.
Who it affects
The Plan creates direct regulatory effects on multiple, identifiable groups. Each paragraph below ties back to clauses in the Plan.
Landowners and developers. Any owner or prospective purchaser of land within the Plan area is affected because zoning, minimum lot sizes (cl 4.1), subdivision consent requirements (cl 2.6), and permitted uses under the Land Use Table determine what they may lawfully do. Those proposing subdivision, demolition, earthworks or new buildings must engage with the development consent process unless their proposal is exempt or complying (cls 2.6-2.7; Part 3; Schedule 2-3).
Council (consent authority). The Council is the consent authority for the Plan (cl 1.6). It decides development applications, may require heritage management documents or a heritage conservation management plan (cl 5.10(5) and (6)), must keep records when exceptions to development standards are granted (cl 4.6(4)) and must consider specified matters (for example cl 5.18 for intensive livestock agriculture, cl 5.21 for flood planning).
Owners or beneficiaries of covenants and agreements. Clause 1.9A can materially affect private rights under agreements and covenants by suspending those instruments to the extent necessary to enable development authorised under the Plan (cl 1.9A(1)). The clause preserves covenants imposed by Council and certain public conservation agreements (cl 1.9A(2)), and public authority registered interests are unaffected (cl 1.9A(3)).
Heritage owners and custodians. Owners of heritage items listed in Schedule 5 or land within heritage conservation areas are affected by cl 5.10, which requires consent for demolition, exterior alterations, disturbance of archaeological sites and many other actions. The Plan imposes consultation steps with the Heritage Council and local Aboriginal communities for some applications (cl 5.10(7), (8), (9)).
Primary producers and rural industries. The Plan regulates subdivision and dwelling entitlements in rural zones (Part 4 clauses 4.1, 4.2 and the RU1 objectives in the Land Use Table). Specific controls for rural workers’ dwellings (cl 4.2D) and restrictions on dual occupancies and dwellings in RU1 (cl 4.2E) affect farm operators’ capacity to create accommodation or subdivide. The intensive livestock agriculture clause sets capacity thresholds and locational constraints (cl 5.18).
Operators of licensed premises and live music venues. Clause 5.20 bars consent authorities from refusing development for licensed premises on a range of grounds connected with music, dancing and performance, and bars refusal on noise grounds where the consent authority is satisfied the noise can be managed to an acceptable level (cl 5.20). That directly changes the assessment environment for pubs, clubs and similar venues.
Aquaculture and fisheries operators. The Plan sets site and operational standards for pond, tank and oyster aquaculture and identifies where extensive aquaculture may proceed without consent (cl 5.19; Schedule 6). Oyster operators benefit from priority oyster aquaculture area recognition where the Plan permits oyster aquaculture without consent (cl 5.19(6)).
Public authorities and State agencies. The Plan recognises State environmental planning policies that prevail as provided by the Act (cl 1.9(1)). It also specifies relevant acquisition authorities for reserved land (cl 5.1), and preserves the Crown’s use of buildings under transport and infrastructure policies (cl 5.12). Public authorities with registered instruments retain their rights (cl 1.9A(3)).
Members of the local community. The Plan affects residents through controls on temporary events (cl 2.8), signage (Schedule 2), noise and amenity considerations (for example cl 5.18 on odour, cl 6.6 on saleyards buffer), and heritage protections. For flood‑prone areas the Plan imposes safety and evacuation considerations to protect life and property (cl 5.21).
Other land users and neighbours. The Plan contains multiple provisions that require the consent authority to assess impacts on adjoining land and amenity, for example unzoned land (cl 2.4(2)(a)), earthworks (cl 6.1(3)(d) on amenity), and subdivision for rural residential uses (cl 5.16).
Who pays and who decides. The Plan assigns decision power to Council (cl 1.6) and places the compliance costs, application preparation costs, and any conservation or mitigation costs on applicants and landowners. Public authorities will bear costs of acquisition where the owner‑initiated acquisition process is used (cl 5.1), and the Plan records which State authority is the relevant acquiring body for particular reserved land.
Key duties and rights
This section sets out the principal affirmative duties the Plan imposes and the rights it recognises.
Duties on applicants and landowners
Obtain development consent where required. Subdivision generally requires consent (cl 2.6); demolition also requires consent (cl 2.7). Exempt/compliant tracks exist but are circumscribed by Schedules and Part 3 (cls 3.1-3.3).
Meet mapped and numerical standards. Applicants must ensure proposed subdivision lot sizes meet minimums on the Lot Size Map unless a specified exception applies (cl 4.1).
Provide information and management documents on request. The consent authority may require a heritage management document or a heritage conservation management plan for development affecting heritage items or areas (cl 5.10(5)-(6)). For proposed intensive livestock agriculture or designated development, applicants must provide adequate statements of environmental effects or EIS material (cl 5.18(3)(a); note).
Observe local operational limits. Home businesses must not use more than 100 m2 of floor area; bed and breakfast must be no more than five guest rooms (cl 5.4(1)-(2)). Other quantified limits are set in cl 5.4.
Design and manage development to avoid or mitigate sensitive impacts. For flood planning, the applicant must show the development is compatible with flood function and will not increase flood affectation and must incorporate measures to manage risk to life (cl 5.21(2)-(3)). Earthworks consent decisions must consider drainage, fill quality, soil stability and potential disturbance of relics (cl 6.1(3)).
Duties on the Council (consent authority)
Have regard to zone objectives when deciding applications (cl 2.3(2)).
Keep a record of assessments where a development standard is contravened and consent is granted under cl 4.6(4).
Notify and consult in heritage and Aboriginal matters. For archaeological sites and nominated State heritage items the consent authority must notify the Heritage Council and consider responses within 28 days (cl 5.10(7), (9)). For Aboriginal places it must notify local Aboriginal communities and consider responses (cl 5.10(8)).
Consider specific assessment matters. For example, when assessing intensive livestock applications the authority must take into account odour, pollution potential, soil degradation, compliance with industry codes and site suitability (cl 5.18(3)).
Rights and entitlements
Right to carry out exempt or complying development if the proposal meets the Schedule criteria and applicable standards (cl 3.1-3.2).
Right to request that a proposed development be assessed notwithstanding Plan commencement if the development application was lodged before commencement and not finally determined (savings provision cl 1.8A).
Right to apply for exceptions to development standards, subject to demonstrating that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6(2)-(3)); the consent authority must keep a record of its assessment (cl 4.6(4)).
Property rights affected by the Plan are preserved except as modified by specific clauses such as the suspension of covenants (cl 1.9A) which operates only to the extent necessary to allow Plan‑permitted development and expressly does not affect certain protected instruments or public authority interests (cl 1.9A(2)-(3)).
Procedural obligations
Heritage and archaeological processes impose notification and consultation duties on the consent authority (cl 5.10(7)-(9)).
For complying development certificates issued under Schedule 3, conditions set out or referred to in Part 2 of Schedule 3 apply (cl 3.2(4)).
For development that contravenes a standard under cl 4.6, the Environmental Planning and Assessment Regulation 2021 requires supporting documentation explaining the grounds to justify contravention (cl 4.6 note).
Limits on powers and rights
The Plan precludes the use of cl 4.6 to authorise particular subdivision outcomes in many rural and environmental zones as set out at cl 4.6(6). It also excludes contravening standards for complying development, BASIX commitments and specified other clauses (cl 4.6(8)).
Clause 1.9A does not apply to covenants required by Council or to a list of conservation instruments and planning agreements (cl 1.9A(2)).
In short, the Plan creates a regime of statutory duties centred on obtaining consent where required, meeting mapped standards and providing evidence on environmental/heritage/flood/risk matters, while preserving procedural rights to exemptions, complying development and limited departures from standards under recorded tests.
Penalties and enforcement
The Plan itself does not set out fines or criminal offence provisions. Enforcement mechanisms and penalties for non‑compliance are administered under the Environmental Planning and Assessment Act and associated regulations to which this Plan is subordinate. The Plan repeatedly frames permissions and prohibitions around whether development may be "carried out only with development consent" or is "permitted without consent", or is "prohibited" (for example cls 2.3, 2.6-2.7, Land Use Table). Non‑compliance with the Plan will therefore engage the Act’s compliance and enforcement framework.
Relevant enforcement and procedural features evident from the Plan:
Decision‑maker and enforcement role: Council is the consent authority and so is the primary decision maker for development applications (cl 1.6). Enforcement of consent conditions, and the handling of unauthorised development, will be exercised through the Act in the name of the consent authority or other relevant public authorities as provided by the Act.
Consent conditions and compliance monitoring: where development consent is granted the consent authority may impose conditions, for example as required by heritage conservation incentives (cl 5.10(10)(c)). Those conditions create enforceable obligations under the Act.
Record‑keeping obligation as an administrative control: when cl 4.6 is used to permit contravention of a development standard the consent authority must keep a record of the assessment (cl 4.6(4)). That creates an administrative transparency and audit trail that may be relied upon in subsequent compliance or review processes.
Notification obligations that enable third party scrutiny: the Plan requires notification in certain heritage and archaeological cases to the Heritage Council and to local Aboriginal communities and specifies timeframes for responses (cl 5.10(7)-(9)). Those notification obligations enable third party engagement which can lead to challenges or submissions that influence enforcement decisions.
Exemptions and complying development as compliance‑reducing devices: works that meet Schedule 2 or Schedule 3 standards may be carried out without development consent (cls 3.1-3.2). Non‑compliance with the criteria for those tracks can render development unlawful under the Act, triggering enforcement action.
Where the Plan prescribes particular procedural steps for higher‑impact activities it also prescribes matters the consent authority must consider, for example odour and pollution for intensive livestock agriculture (cl 5.18(3)), and flood compatibility for development within flood planning areas (cl 5.21(2)-(3)). Failure to address those matters in an application may affect the ability to obtain consent and thereby create exposure to enforcement if development proceeds without valid consent.
Specific prohibitions and their enforcement nexus:
Canal estate development is expressly prohibited (cl 2.9). An unlawful attempt to carry out such development would be treated as unauthorised development under the Act.
The Plan identifies certain development that requires consent even where it might otherwise be exempt under another instrument, and preserves the primacy of State environmental planning policies where they prevail (cl 1.9). This makes the analysis of enforcement dependent on cross‑instrument interpretation, creating scope for compliance disputes.
In summary, the Plan sets the perimeter of lawful development: what must be consented, what is exempt or complying, and what is prohibited. The Plan itself refers to enforcement by implication through the Act and through administrative obligations such as records and notifications. Practitioners and owners should assume enforcement remedies, penalties and specific offence provisions are found in the Act and associated regulations referenced repeatedly in the Plan; the Plan supplies the substantive permissions and constraints that trigger those enforcement provisions.
How it interacts with other laws
The Plan sits within the hierarchy of environmental planning instruments and intersects with a number of State statutes and policies that are referenced in the text. The Plan states explicitly that it is subject to State environmental planning policies that prevail under section 3.28 of the Act (cl 1.9(1)). The Plan cross‑references numerous Acts and policies; the following list identifies the principal statutory and policy interactions evident from the Plan.
Relationship with the Environmental Planning and Assessment Act and Regulations
The Plan implements local environmental planning under the Act. Many procedural mechanisms invoked (development consent, complying development certificates, recording of exceptions to development standards) are governed by the Act and the Environmental Planning and Assessment Regulation 2021 (cl 4.6 note; cl 1.2 references the Act). The Plan also adopts tests and processes that are tied to Act concepts (for example designated development, Division 3.5 public notice processes referenced in cl 1.8A note).
State environmental planning policies (SEPPs) and other state instruments
The Plan defers to SEPPs that prevail over it (cl 1.9(1)) and identifies specific SEPPs as potentially relevant in the Land Use Table notes (for example SEPP (Housing) 2021; SEPP (Transport and Infrastructure) 2021; SEPP chapters on resources, resilience and hazards, industry, primary production). That means where a SEPP contains an operative provision that is inconsistent with the Plan the SEPP will apply to the extent of the inconsistency, as provided by the Act.
Interaction with environmental, heritage and biodiversity laws
Heritage: the Plan references the Heritage Act 1977 in relation to the State Heritage Register and interim heritage orders and requires consent for work affecting heritage items and archaeological sites (cl 5.10). The consent authority must notify the Heritage Council in specified circumstances (cl 5.10(7), (9)).
Biodiversity and conservation: exemptions and exclusions for exempt/complying development are linked to State policies and the Biodiversity Conservation Act 2016 via references in cl 3.1(5) and cl 3.3.
Fisheries and aquaculture laws: aquaculture provisions reference the Fisheries Management Act 1994, the Fisheries Management (Aquaculture) Regulation 2017 and the Department of Primary Industries’ aquaculture industry development plans (cl 5.19; Schedule 6).
Local Government Act and public land classification
The Plan enables classification and reclassification of public land under Part 2 of Chapter 6 of the Local Government Act 1993 (cl 5.2) and identifies specific parcels to be classified as operational or community land (Schedule 4). The Plan notes the need for Governor approval where required under the Local Government Act when discharging reserves (cl 5.2(5) note).
Crown land and Crown authorities
The suspension of covenants clause explicitly excludes instruments within the meaning of section 13.4 of the Crown Land Management Act 2016 (cl 1.9A(2)(b)). The Plan also acknowledges that certain public authority interests under registered instruments are unaffected by cl 1.9A(3).
Rural Fires Act and bush fire management
Bush fire hazard reduction works authorised by the Rural Fires Act 1997 may be carried out without development consent (cl 5.11), and the Plan notes the Rural Fires Act contains additional provisions for bush fire prone land. This creates an operational overlap between bush fire operational powers and development consent regimes.
Land acquisition and just terms
The Plan identifies the relevant acquisition authority for owner‑initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 (cl 5.1), linking local reservation decisions to State acquisition powers and compensation regimes.
Other cross‑instruments and administrative interactions
The Plan refers to State policies on exempt and complying development (State Environmental Planning Policy (Exempt and Complying Development Codes) 2008) and BASIX commitments (cl 4.6(8)(b)); it also cross‑refers to other State policies affecting housing, transport, resources, resilience and industry in the Land Use Table. It therefore functions as one instrument within a nested system of State and local laws.
Practical consequence of interactions
Where the Plan is silent or where a SEPP prevails, the applicable SEPP or Act controls. Practitioners must check the maps and the schedules in the Plan, the Act, relevant SEPPs and the cited statutes on heritage, biodiversity, fisheries and local government to obtain a full compliance picture. The Plan uses multiple defined statutory terms with meanings taken from other Acts or guidelines (for example "flood planning area" as defined in the Flood Risk Management Manual referenced in cl 5.21).
In sum, the Plan is not self‑standing. It prescribes local rules and local maps but explicitly references State laws and policies that fill gaps, provide exceptions and take precedence where there is inconsistency.
Amendment history
The Plan document as provided contains inline annotations and amendment notes attached to specific clauses and schedules. Those annotations in the Plan text indicate the dates and instruments by which particular clauses were amended or inserted. Below are discrete items extracted from the Plan’s marginal notes and clause annotations.
Notable clause-level amendments and insertions shown in the Plan:
Clause 1.8A (Savings provision relating to development applications) includes an annotation: cl 1.8A: Am 2019 (621), Sch 5[1]. That records an amendment made in 2019 (legislative instrument 621) as Schedule 5, item 1.
Clause 1.9A (Suspension of covenants, agreements and instruments) is annotated cl 1.9A: Am 2019 (621), Sch 5[2]-[4], showing amendments in the same 2019 instrument affecting subclauses (1)-(3).
Clause 2.1 (Land use zones) shows multiple amendment annotations: cl 2.1: Am 2016 (709), Sch 1[1]; 2019 (402) cl 5 (1). This indicates amendments in 2016 and a further change in 2019.
The Land Use Table is annotated Land Use tbl: Am 2016 (709), Sch 1[2]; 2019 (402) cl 5 (2); 2020 (388), Sch 1[1]. These notes show successive amendments in 2016, 2019 and 2020.
Clause 4.2F (Exceptions to minimum subdivision lot size for lot boundary adjustments) includes cl 4.2F: Ins 2013 (715), cl 4, recording an insertion in 2013.
Clause 4.2F was noted as inserted in 2013 and elsewhere cl 4.2F is marked Ins 2013 (715), so the Plan has been modified since initial making.
Schedule 2 contains an amendment note sch 2: Am 2013 No 47, Sch 2.30.
Several clauses show “Not adopted” or “Not applicable,” and those notations reflect choices or subsequent amendments leaving certain optional provisions unadopted (for example cls 4.3-4.5 not adopted; cls 5.7, 5.9, 5.9AA repealed).
Clause 6.2 shows cl 6.2: Rep 2021 (225), Sch 1, indicating that clause was repealed in 2021.
Schedule 4 is annotated sch 4: Am 2015 (162), Sch 1[1][2], indicating amendments in 2015.
Schedule 5 (Environmental heritage) shows sch 5: Am 2014 (673), Sch 1[1]-[6]; 2020 (388), Sch 1[2]-[15]; 2021 (683), Sch 1. Multiple schedules and items were adjusted across 2014, 2020 and 2021.
Where the Plan text states “When this Plan was made …” or “Note” alongside clauses, those notes often record that certain zones or maps were not included at original making and have been added later (for example cl 2.1 notes the Plan did not originally include Zone RU2, RU4, RU6 when cl 4.2 was drafted).
Practical reading of the amendment history from the Plan:
The Plan has received iterative amendments across the 2013-2021 period. Amendments have targeted map‑based rules, the Land Use Table, Schedule content (exempt/compliant development, heritage, public land classification), and inserted local exceptions and localised controls (for example clause insertions on buffer areas and lot boundary adjustments).
The Plan records specific legislative instruments or amending orders adjacent to amended clauses. For clients seeking the authoritative history and texts of each amendment, the Plan’s annotations point to the relevant amending instruments (for example instrument numbers 2013 (715), 2016 (709), 2019 (621), 2020 (388), 2021 (225), 2021 (683)). Practitioners should consult the NSW legislation database or Gazette for the exact amending instrument texts to track the legal chronology and scope of each change.
The Plan as presented includes amendment markers but does not include the full amending instruments themselves. For certainty on operative dates and transitional savings attached to particular amendments, the practitioner should retrieve the identified amending instruments and any associated explanatory memoranda or registers of amendments.
Litigation history
The Plan document provided does not record any judicial or tribunal decisions that interpret or challenge its provisions. There are no cases named in the Plan text. Consequently, from the text alone there is no litigation history to summarise.
Practical implications for practitioners:
Absence of litigation references in the Plan does not mean that the Plan has not been subject to review or appeal under the Act in the Land and Environment Court or otherwise. It simply means the instrument itself does not list or discuss any such litigation.
Where interpretation issues are likely to arise (for example the scope of cl 1.9A suspension of covenants, the meaning of “environmentally sensitive area” for exempt development exclusions in cl 3.3, or the evidentiary thresholds for demonstrating cl 4.6 exceptions to development standards), practitioners should search court and tribunal databases for decisions that consider the Plan or similar clauses in other LEPs.
For matters that commonly generate dispute , heritage works under cl 5.10, applications for exceptions to development standards under cl 4.6, flood and climate‑related planning under cl 5.21 , counsel and advisers should locate precedents in Environmental Planning and Assessment Act jurisprudence and any Land and Environment Court authorities that relate to equivalent LEP clauses in other local government areas.
Because the Plan references numerous State policies and Acts, litigation that concerns those higher ranking instruments may indirectly affect how the Plan is applied. Practitioners should therefore consult decisions that address interplay between LEPs and SEPPs, heritage law, biodiversity law, and flood planning standards.
Gotchas
This section flags traps and non‑obvious operational risks that arise from the Plan text. Each point is grounded in a specific provision.
Savings provision for pre‑commencement applications. Clause 1.8A requires that any development application made before the Plan’s commencement and not finally determined must be determined as if the Plan had not commenced. That means an applicant with a pending application loses the benefit of any more permissive rules in the new Plan; conversely, if the prior instrument was less permissive, applicants should be aware their applications must be decided under the old rules. The clause also cross‑references Division 3.5 of the Act for applications seeking development permitted only if an EPI is amended (cl 1.8A note). Check lodgement dates carefully.
Suspension of covenants is limited and conditional. Clause 1.9A can suspend private covenants and agreements only to the extent necessary to enable development under the Plan (cl 1.9A(1)). But the clause expressly excludes covenants imposed by Council, Crown Land Management Act instruments, conservation agreements, property vegetation plans, biobanking agreements, and planning agreements (cl 1.9A(2)(a)-(g)). Public authority registered interests are preserved (cl 1.9A(3)). Practitioners should not assume blanket removal of private encumbrances; the clause is narrowly framed and particular classes of instruments remain effective.
Exempt/compliant development exclusions and environmentally sensitive areas. Exempt and complying development cannot be carried out in identified environmentally sensitive areas (cl 3.3(1)-(2)). The Plan adopts a broad definition of environmentally sensitive areas that includes coastal waters, Ramsar sites, World Heritage areas, land within 100 metres of certain coastal areas, land identified in any EPI as high Aboriginal cultural significance or high biodiversity significance, reserved national park land, and declared areas of outstanding biodiversity value (cl 3.3(2)). Applicants relying on exempt or complying tracks must check these overlays carefully; the presence of a mapped sensitivity will require a development application even for seemingly minor works.
Local map dependencies. Numerous operative rules depend on maps (Lot Size Map, Land Zoning Map, Rural Residential Subdivision Map, Sensitive Land Map, Designated Buffer Map, Heritage Map). Errors or changes in maps change entitlement. For example minimum lot size obligations (cl 4.1) and exceptions (cl 4.2C) are map‑dependent. Practitioners should always consult the current LEP maps on the NSW Planning Portal link referenced in the Plan (cl 1.7 note).
Limits on use of cl 4.6 exceptions for rural subdivision. Clause 4.6 denies the consent authority the power to allow certain subdivision outcomes in rural and environmental zones where the result would create multiple lots below the minimum standard or at least one lot below 90% of the minimum area (cl 4.6(6)). This limits flexibility for applicants seeking to use exception grounds to subdivide rural land; several rural zones are specifically named. Check whether your subdivision proposal is excluded from variation under cl 4.6.
Heritage consent triggers are wide and procedural obligations are exacting. Works affecting heritage items, Aboriginal objects and archaeological sites attract consent requirements (cl 5.10(2)) and the Plan allows the consent authority to require heritage assessments or conservation management plans (cl 5.10(5)-(6)). The consent authority must notify the Heritage Council or local Aboriginal communities in specified situations and consider responses within 28 days (cl 5.10(7)-(9)). Failure to follow these procedures risks refusal or challenge.
Temporary use cap. Temporary use consents are generally limited to a maximum period of 28 days in any 12 month period (cl 2.8(2)), with a narrow exception for dwellings used as sales offices. Events or pop‑ups that might be considered recurring or that might exceed 28 days require careful planning and potentially multiple applications.
Music protection is conditional on manageability of noise. Clause 5.20 prevents consent authorities refusing licensed premises development on specified grounds related to music and performance, and it prevents refusal on noise grounds if the consent authority is satisfied the noise can be managed to an acceptable level (cl 5.20(1)-(2)). That does not immunise venues from noise regulation; applicants must still demonstrate acceptable noise management measures.
Intensive livestock agriculture thresholds are precise but technical. Clause 5.18 contains specific capacity thresholds below which intensive livestock agriculture may be carried out without consent and a set of locational prohibitions (cl 5.18(4)-(5)). Proponents of livestock operations close to other farms, residential areas or watercourses must map their proposal against these numerical buffers (for example 100 m to a natural watercourse; 500 m to dwellings or residential zones) to determine whether consent is required.
Flood planning requires climate change consideration. Clause 5.21 explicitly requires consent authorities to consider projected changes to flood behaviour as a result of climate change when assessing development in the flood planning area (cl 5.21(3)(a)). That elevates the evidentiary threshold for flood‑prone sites and may require climate‑sensitive modelling or consultant inputs.
Public land classification and trust considerations. Schedule 4 lists parcels reclassified as operational or community land and cl 5.2(5) states that some parcels cease to be public reserves and are discharged from trusts except where specified. Where a parcel is in Part 2 (interests changed) the Plan records trusts not discharged (Schedule 4, Part 2 Column 3). Practitioners working with public land should check Schedule 4 for trust constraints and Governor approvals required under the Local Government Act.
Incomplete or “not adopted” clauses. Several optional LEP clauses are recorded as “Not adopted” (for example cl 4.3 height, cl 4.4 FSR, cl 5.6 roof features). Where those controls are blank the Plan does not provide specific local standards and other instruments or development controls may apply. Do not assume the absence of a Plan standard means no constraint; other State policy or development control plans may apply.
Record‑keeping and transparency for exceptions. When cl 4.6 is used to approve contraventions of development standards the consent authority must keep a record of its assessment (cl 4.6(4)). Applicants should ensure the record captures their grounds; an insufficient administrative record can complicate later review or challenge.
These “gotchas” are not exhaustive but identify attention points where mapping, timing, inter‑instrument interaction or precise numerical tests can determine whether a development route is available and what evidence will be required.
How to comply
This section provides a practitioner‑oriented compliance roadmap tied to Plan provisions. It is procedural and prescriptive in the sense of outlining steps and documents the Plan requires or anticipates.
Confirm zoning and mapped overlays first
Consult the Land Zoning Map, Lot Size Map, Heritage Map, Sensitive Land Map, Designated Buffer Map and any other maps mentioned in the Plan (cl 1.7; cl 2.2; various clause references). The zoning and overlays determine permissibility, minimum lot sizes, heritage triggers, saleyards buffers and flood planning applicability.
Be mindful that maps can be amended; use the NSW Planning Portal links referenced in the Plan and check the date/version.
Determine the correct development pathway
If the proposed work is listed in Schedule 2 and meets the Schedule’s standards and Part 3 conditions, it may be exempt (cl 3.1). Verify the development is not in an “environmentally sensitive area” (cl 3.3).
If the work is listed in Schedule 3 Part 1 and meets the specified deemed‑to‑satisfy standards and conditions in Schedule 3 Part 2, it may be complying development (cl 3.2).
Otherwise, prepare a development application for consent. Subdivision, demolition and many other works explicitly require consent (cls 2.6-2.7).
Meet information and technical requirements
For any application, assemble the supporting information the Plan requires or contemplates: statements of environmental effects, heritage impact statements, heritage management documents or conservation management plans where requested (cl 5.10(5)-(6)), and EIS material for designated development (cl 5.18(3)(a) note).
For applications that propose to contravene a development standard, attach the document required by the Environmental Planning and Assessment Regulation showing the grounds to justify the contravention and be prepared for the consent authority to keep an assessment record (cl 4.6(3)-(4) note).
Address specialist local tests
Heritage: if the site contains a heritage item, Aboriginal object or lies within a conservation area, prepare a heritage management document and be ready to consult with the Heritage Council or local Aboriginal communities as required (cl 5.10(2), (5), (7)-(9)).
Flooding: for sites in the flood planning area, demonstrate compatibility with flood behaviour, include evacuation and life safety measures, and address projected climate‑driven flood changes (cl 5.21(2)-(3)).
Intensive livestock and aquaculture: map capacities and separations against the numerical thresholds in cl 5.18 and cl 5.19/Schedule 6; design ponds and outlets to meet operational restrictions and screening to avoid species escape (cl 5.19; Schedule 6 Part 1 Div 2).
Check exemptions and local limits
Apply the quantified local caps in cl 5.4: home businesses (100 m2), bed and breakfast (maximum 5 bedrooms), farm stay (12 bedrooms), neighbourhood shop (100 m2), etc. Ensure the proposal does not exceed these caps where the use is to be permitted without consent (cl 5.4).
For licensed premises proposing music and dance, prepare and document noise management measures demonstrating that noise may be managed to an acceptable level, because cl 5.20 bars refusals only where noise is manageable (cl 5.20(2)).
Address covenants and agreements
If private covenants or agreements exist on title, determine whether cl 1.9A will operate to suspend them to the extent necessary. Remember that protections exist for covenants imposed by Council and for many conservation and Crown instruments that cl 1.9A excludes (cl 1.9A(2)-(3)). Seek title searches and legal advice on the specific instrument.
For subdivision proposals
Check minimum lot size on the Lot Size Map and whether the proposal would fall within the exceptions in Part 4 (cls 4.2-4.2F). For rural land, ensure proposed lots meet the tests in cl 4.2B and cl 4.2C where applicable.
Be aware that certain subdivisions cannot be authorised via cl 4.6 exceptions where they create multiple lots below the minimum area; check cl 4.6(6).
Engage early with the consent authority
Use pre‑lodgement meetings with Council to confirm map interpretations, necessary supporting studies and likely conditions. Council is the consent authority (cl 1.6) and may advise if heritage management documents or environmental assessments will be required (cl 5.10(5)).
Prepare for notification and consultation obligations
For heritage or Aboriginal places, prepare stakeholder consultation strategies because the consent authority must notify and consider responses from the Heritage Council and local Aboriginal communities in specified circumstances (cl 5.10(7)-(9)).
Maintain records and administrative compliance
If seeking an exception to a development standard under cl 4.6, compile robust planning grounds and evidence. The consent authority must keep a record of its assessment (cl 4.6(4)), and the application should include the Regulation‑required document explaining the grounds to demonstrate unreasonableness or that compliance is unnecessary (cl 4.6 note).
Practical checks before construction
Confirm that all licences and approvals under other Acts are in place, since exempt development is not exempt from other statutory requirements (Schedule 2 Note 2). For aquaculture, confirm any fisheries licences or industry development plan requirements and check priority oyster aquaculture area maps where relevant (cl 5.19(5)-(6)).
Monitor for Plan amendments and SEPP interactions
Given the Plan’s amendment history, check for recent or impending LEP amendments, and always verify whether a relevant SEPP prevails under cl 1.9(1). The interaction with SEPPs can alter the consent pathway, permitted uses and standards.
Checklist summary for an applicant:
Step 1: Confirm zoning and mapped overlays on the NSW Planning Portal.
Step 2: Determine if exempt, complying or development application route applies.
Step 4: Check covenants and title instruments; assess cl 1.9A applicability.
Step 5: Prepare and lodge application with Council and satisfy notification/consultation requirements.
Step 6: If seeking departures from standards, prepare the Regulation‑required justification document and expect Council to record its decision basis (cl 4.6).
Step 7: Obtain any other statutory approvals outside the Plan (State licences, Crown permissions).
Step 8: Before works commence, confirm all approvals and any conditions attached to complying development certificates or development consents are met.
Compliance under the Plan requires due attention to mapping, special local numeric caps, heritage and environmental sensitivities and cross‑instrument obligations. Early engagement with Council and proper technical briefs keyed to the Plan’s clauses materially reduces execution risk.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Tenterfield Local Environmental Plan 1996
Severn Local Environmental Plan 2002
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 28 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterway or waterbody, that—
This is an opening excerpt, not the complete document.