CTHRepealedAct
Telecommunications Act 1991
8Facilities beyond the boundaries of a reserved line link
Start here
Get a plain-English read of 8
Turn the raw legal text into a practical explanation grounded in Telecommunications Act 1991.
##### 8 Facilities beyond the boundaries of a reserved line link
(1) A line is beyond the boundaries of a reserved line link if, and only if:
(a) the line is connected, within the meaning of subsection 22(2), to no line that is, or forms part of, the line link; or
(b) the line is connected to an end facility that is a boundary of the line link and, if the line were removed from that facility:
(i) the line would not itself be a line link of a kind referred to in subsection 24(1); and
(ii) the line would form part of no line link of a kind so referred to.
(2) Subject to subsection (3), a facility (other than a line) is beyond the boundaries of a reserved line link if, and only if:
(a) the facility is connected to no line that is, or forms part of, the line link, and to no facility (other than a line) to which such a line is connected; or
(b) the first-mentioned facility:
(i) is connected to an end facility that is a boundary of the line link; and
(ii) is not otherwise connected as mentioned in paragraph (a).
(3) An end facility that is a boundary of a reserved line link is taken to be within, and not beyond, the boundaries of that reserved line link.