What it does
This instrument, expressed as a set of schedules, reclassifies specified land and road segments in relation to the Bass Highway corridor. Mechanically it does five discrete things, each reflected in a separate schedule.
- Schedule 1 dedicates specified Crown land as highways, listing two discrete segments of the Bass Highway and their measured lengths, and identifying the relevant plan numbers in the Central Plan Register (Plans 6520-6531) that show the boundaries "by heavy black lines" (Schedule 1).
- Schedule 2 declares the same identified portions of road to be State Highways, repeating the two Bass Highway segments and the same plan references and lengths (Schedule 2).
- Schedule 3 removes or ceases the State Highway status of two other Bass Highway segments, giving route descriptions and lengths (Schedule 3).
- Schedule 4 designates subsidiary roads by name and route with measured lengths, specifically the Meander Valley Secondary Road and the Preservation Secondary Road (Schedule 4).
- Schedule 5 designates limited access portions of the Bass Highway, using the same segments and plan references as Schedules 1 and 2 (Schedule 5).
- Schedule 6 lists "Places of Access" to the limited access road, giving numbered locations and distances measured from the centres of two overpasses (the Hagley Station Lane overpass and the Ironcliffe Road overpass), and notes that the display and numbering are in accordance with the Rules Publication Act 1953 (Schedule 6).
The instrument is formally recorded as notified in the Gazette on 22 September 2004 and is administered in the Department of Infrastructure, Energy and Resources, as stated at the end of the text. The schedules anchor the changes to specific plans in the Central Plan Register (Plans 6520-6531), which are the operative spatial references for boundaries and ramps described in the text (Schedules 1, 2 and 5). The text repeatedly identifies the Bass Highway as the subject, with two named segments, interchange ramps, and associated subsidiary roads and places of access. The instrument contains no express penal or operational provisions within the schedules themselves; it presents as a classification and mapping exercise that depends on external plan material and departmental administration for operational detail.