Sydney Local Environmental Plan (Green Square Town Centre—Stage 2) 2013
In ForceNSW
Jurisdiction
New South Wales
Act Number
525 of 2013
Collection
regulation
Plain English Summary
7/10 complexity
This Plan sets the local land‑use rules for the Green Square Town Centre: it creates zones (E2, MU1), maps for height and floor‑space, lists permitted/prohibited uses, and prescribes consent, exempt and complying development processes. The Council is the consent authority (cl 1.6); developers meet compliance costs including possible affordable‑housing contributions (cl 6.5). The Plan relies on maps and State policies, allows limited flexibility against development standards (cl 4.6), and imposes design, heritage, flood, parking and environmental controls (cls 6.9, 5.10, 5.15, 6.8, 6.1).
This instrument is a local environmental plan (LEP) titled Sydney Local Environmental Plan (Green Square Town Centre,Stage 2) 2013 that sets zoning, permissible uses, development standards, mapping references and a range of local provisions for the Green Square Town Centre in the City of Sydney (cl 1.1; cl 1.3). It commences on publication on the NSW legislation website (cl 1.1AA). The Plan replaces earlier local environmental plans and deemed environmental planning instruments for the land to which it applies, subject to land shown as “Deferred matter” (cl 1.8; note to cl 1.8). It adopts the standard instrument structure and map-based controls: Land Application Map, Land Zoning Map, Floor Space Ratio Map, Height of Buildings Map, Active Street Frontages Map, Heritage Map and other specific maps referred to throughout the Plan (cl 1.7; cl 2.2; cl 4.3; cl 4.4; cl 6.6; cl 5.10).
Mechanically, the Plan does the following things:
Establishes two zones applicable to the area, E2 Commercial Centre and MU1 Mixed Use, and fixes the Land Use Table for what is permitted, not permitted and permitted with consent for each zone (cl 2.1; cl 2.3; Land Use Table).
Sets mandatory development consent requirements for key activities including subdivision (cl 2.6), demolition (cl 2.7), and specified temporary uses (cl 2.8).
Identifies exempt development in Schedule 2 and complying development in Schedule 3, with qualifying conditions and exclusions (cl 3.1; cl 3.2; Schedule 2; Schedule 3).
Imposes principal development standards in Part 4: a mapped maximum building height (cl 4.3), a mapped floor space ratio ceiling (cl 4.4), rules for calculating site area and gross floor area including exclusions and anti-“double-dipping” covenants (cl 4.5), and an exceptions-to-development-standards procedure (cl 4.6).
Current sections
Direct links to the current provisions in Sydney Local Environmental Plan (Green Square Town Centre—Stage 2) 2013.
24
Part 1
Preliminary
Part 1 Preliminary
Part 1 Preliminary
Note—
The Standard Instrument (Local Environmental Plans) Order 2006 sets out matters to be included in standard local environmental plans. While this Plan is not a standard local environmental plan, standard clauses have been included in this Plan and the clause numbering from that Order has been retained. This means that the numbering in this Plan may contain some gaps. If additional provisions have been inserted they are numbered accordingly.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2— relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Backpackers’ accommodation; Hotel or motel accommodation; Light industries; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Agriculture; Air transport facilities; Airstrips; Boat building and repair facilities; Boat launching ramps; Boat sheds; Caravan parks; Cemeteries; Charter and tourism boating facilities; Correctional centres; Crematoria; Depots; Electricity generating works; Environmental protection works; Exhibition homes; Exhibition villages; Extractive industries; Farm buildings; Forestry; Freight transport facilities; Hardware and building supplies; Helipads; Highway service centres; Home-based child care; Home businesses; Home industries; Home occupations; Industrial retail outlets; Industries; Jetties; Mortuaries; Port facilities; Recreation facilities (major); Recreation facilities (outdoor); Residential accommodation; Rural industries; Rural supplies; Sewerage systems; Sex services premises; Specialised retail premises; Storage premises; Tourist and visitor accommodation; Transport depots; Truck depots; Vehicle body repair workshops; Vehicle repair stations; Veterinary hospitals; Warehouse or distribution centres; Waste or resource management facilities; Water recreation structures; Water supply systems; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note—
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
Note—
None of these zones were included in this Plan when it was made.
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
cl 5.1: Am 2019 (621), Sch 4.3[9] [10]; 2020 No 30, Sch 4.104[1]; 2024 (42), Sch 1.44[2].
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Acid sulfate soils
6 Acid sulfate soils
6.1 Acid sulfate soils
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2017 (751), Sch 1.4; 2020 No 30, Sch 4.104[2].
sch.2-sec
Home occupations (sex services)
sch.2-sec Home occupations (sex services)
Home occupations (sex services)
Must be carried out in a lawful dwelling or in a building ancillary to a lawful dwelling.
sch.2-sec-oc.2
Street art
sch.2-sec-oc.2 Street art
Street art
(1) Must not project more than 30mm from a wall or other surface.
(2) Must not constitute signage.
Note—
Signage includes advertisements and advertising structures.
(3) Must not be located on a heritage item or within a heritage conservation area.
(4) Must not contain material that—
(a) discriminates against or vilifies any person or group, or
(b) is offensive or sexually explicit.
(5) In this clause, street art means art that is painted, marked or otherwise affixed to the outside of a building and that is visible from a public place (within the meaning of the Local Government Act 1993).
Note—
Street art may only be carried out subject to requirements to obtain the approval of the owner of the building on which the street art is located or any statutory authorities (such as Transport for NSW). See also Part 2 of the Graffiti Control Act 2008 for graffiti related offences.
sch.2-sec-oc.3
Temporary sign or banner
sch.2-sec-oc.3 Temporary sign or banner
Temporary sign or banner
(1) Must not be displayed for more than 40 days in any calendar year.
(2) Must be no more than 3m by 4m.
(3) Must not display offensive material.
(4) Must not be on, or attached to, an “A” frame structure.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
(When this Plan was made this Schedule was blank)
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
Note—
The Standard Instrument (Local Environmental Plans) Order 2006 sets out matters to be included in standard local environmental plans. While this Plan is not a standard local environmental plan, standard clauses have been included in this Plan and the clause numbering from that Order has been retained. This means that the numbering in this Plan may contain some gaps. If additional provisions have been inserted they are numbered accordingly.
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Sydney Local Environmental Plan (Green Square Town Centre—Stage 2) 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in the City of Sydney known as the Green Square Town Centre generally in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to foster the environmental, economic, social and cultural well-being of the Green Square Urban Renewal Area by encouraging the establishment of Green Square Town Centre as the major commercial, retail, cultural and entertainment centre for Green Square,
(b) to allow for a mix of land uses that will—
(i) provide an appropriate balance between residential, retail, commercial and other land uses in the Green Square Town Centre, and
(ii) encourage the provision of a range of services and facilities to help meet the needs of the population and users of the Green Square Town Centre, and
(iii) generate employment in the Green Square Town Centre, and
Contains numerous local provisions (Part 5 and Part 6) such as heritage controls (cl 5.10), flood planning requirements referencing the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.15), protections for licensed premises playing or performing music (cl 5.14), acid sulfate soils controls (cl 6.1), airspace and aircraft noise controls (cl 6.3; cl 6.4), affordable housing levy provisions (cl 6.5) and a design excellence regime with a potential 10 percent FSR uplift when a competitive design process is won (cl 6.9).
The Plan also contains procedural and transitional mechanics: savings provisions that direct how development applications made before particular amendments are to be determined (cl 1.8A), an express statement that State Environmental Planning Policies may prevail where applicable (cl 1.9(1)), a suspension power permitting the Plan to operate notwithstanding private agreements or covenants except for specified categories (cl 1.9A), and provisions identifying the consent authority as the Council (subject to the Act and the Central Sydney Planning Committee arrangements) (cl 1.6).
Taken together, the instrument translates the City of Sydney’s planning objectives for Green Square into zoning, mapped numerical controls and a set of documentary and process requirements that developers, landowners and the Council must follow on the mapped land parcels.
Main concepts
The Plan operates around a small set of organising concepts: map-based zoning and numerical standards; the tripartite treatment of development as exempt, complying or development requiring consent; targeted local controls that modify or augment State instruments; and process levers the consent authority may use to secure public outcomes.
Zoning and land use controls
The Plan fixes zones by map and a Land Use Table that associates objectives with each zone and prescribes which uses are permitted without consent, permitted with consent or prohibited (cl 2.1; cl 2.3; Land Use Table). The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)).
Mapped numerical standards
Height and floor space are set by maps: the Height of Buildings Map (cl 4.3) and the Floor Space Ratio Map (cl 4.4). These maps create hard ceilings, subject to narrow exceptions (cl 4.3A) and the broader exceptions procedure in cl 4.6.
Site and floor area calculation rules
Clause 4.5 defines floor space ratio, sets rules for measurement of site area, excludes land where development is prohibited and excludes community land or public places, and addresses strata overlap and “double-dipping” by allowing covenants to prevent the creation of floor area on one lot because it is included in a consolidated site calculation for another (cl 4.5(2)-(11)).
Exempt and complying development
Part 3 identifies development of minimal environmental impact that may proceed without development consent if it meets the Schedule 2 standards (cl 3.1), and complying development that may proceed under a complying development certificate where it meets Part 1 of Schedule 3 and the Building Code requirements (cl 3.2). The Plan expressly excludes environmentally sensitive areas from exempt or complying development (cl 3.3).
Flexibility and concessions
Two mechanisms grant flexibility. First, clause 4.6 permits the consent authority to grant consent that contravenes a development standard provided the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6(2)-(3)). Second, clause 6.9(7) offers an incentive: an approved competitive design can permit up to a 10 percent FSR uplift beyond the mapped FSR.
Local targeted controls
The Plan inserts detailed, use-specific controls. Examples include acid sulfate soil management plans for works on land mapped by class (cl 6.1), requirements for active street frontages on identified frontages that require ground-floor business or retail uses (cl 6.6), car parking maximums per land use with visitor parking rules (cl 6.8), heritage consent triggers and the consent authority’s ability to require heritage management documents (cl 5.10), affordable housing contributions tied to defined thresholds and specified contribution rates (cl 6.5), and sustainability requirements for large commercial development including a net-zero on-site energy objective from 1 January 2026 (cl 6.13).
Process and institutional interaction
The consent authority is the Council, subject to the Act and the Central Sydney Planning Committee arrangements in the City of Sydney Act where major development is concerned (cl 1.6). The Plan repeatedly cross-refers to State instruments and other Acts (for example, the Heritage Act, Local Government Act and Land Acquisition (Just Terms Compensation) Act) and states which SEPPs do not apply (cl 1.9). It requires consultation with Commonwealth bodies for airport obstacle surfaces (cl 6.3) and Heritage Council notification in certain archaeological matters (cl 5.10(7)).
Transitional and suspension mechanics
Savings provisions in cl 1.8A direct how in-flight DAs are determined relative to subsequent amendments. Clause 1.9A temporarily suspends private covenants and agreements to the extent necessary to enable development under this Plan, with specified exceptions and without affecting public authorities’ registered instruments (cl 1.9A).
Collectively, these concepts create a map-led regulatory framework that combines numerical constraints, targeted local policy priorities, and procedural levers (information, consultation, conditions and covenants) for shaping outcomes in Green Square.
Who it affects
Primary regulated parties
Landowners and developers whose land lies within the mapped Green Square Town Centre are the primary subjects of the instrument. The zoning, mapped height and FSR limits (cl 2.2; cl 4.3; cl 4.4) determine what uses and development intensities are allowed, and where development consent must be obtained (cl 2.3; cl 2.6; cl 2.7).
Applicants for development approval
Applicants must navigate exemptions and complying development rules (cl 3.1; cl 3.2; Schedules 2 and 3), produce technical documents referenced in the Plan (for example acid sulfate soils management plans under cl 6.1(3), heritage management documents under cl 5.10(5), flood assessments in accordance with cl 5.15) and may need to demonstrate planning grounds under the exceptions-to-development-standards mechanism (cl 4.6(3)).
Council and statutory bodies
The consent authority is the Council, subject to the Act and the Central Sydney Planning Committee arrangements (cl 1.6). The Council exercises discretions under many clauses: assessment of zone objectives (cl 2.3(2)), approval of heritage reports and conservation plans (cl 5.10(5)-(6)), imposition of affordable housing contribution conditions (cl 6.5(2)-(3)), and imposition of conditions preventing “double-dipping” via registered covenants (cl 4.5(9)-(10)). The Council also has roles in classifying public land (cl 5.2) and approving maps (cl 1.7).
Other public authorities and agencies
Relevant Commonwealth bodies and State authorities appear where their statutory functions are implicated: the body responsible for airport approvals must be consulted if development penetrates Limitation or Operations Surfaces (cl 6.3); Fire and Rescue NSW is relevant to fire alarm conversion rules (cl 5.8); the Heritage Council must be notified in relation to certain archaeological site consents (cl 5.10(7)-(9)); Transport for NSW is named as the acquiring authority for certain mapped roads (cl 5.1(2) table). Public authorities retain their rights under registered instruments notwithstanding the suspension of private covenants (cl 1.9A(3)).
Commercial operators and local businesses
Operators of licensed premises are affected by cl 5.14, which prevents consent refusals on the basis of the style of music, live or amplified performance, dancing, dance floors and a list of decorative/operational items, while still allowing refusal where noise cannot be managed to an acceptable level (cl 5.14(1)-(2)). Ground-floor shop owners and businesses on mapped active street frontages face conditions under cl 6.6 to provide business or retail uses at street level.
Residents and community users
Residents and community groups are affected by the public domain and amenity objectives embedded in the Plan (cl 1.2), by car parking caps (cl 6.8) that influence parking supply and travel behaviour, and by the Plan’s flood planning and bushland protections (cl 5.15; cl 5.16). The suspension of covenants (cl 1.9A) may change the development potential of neighbouring properties in ways that affect amenity and value.
Those who pay
Developers will bear direct costs: fees for DA processing, costs to prepare required technical reports (acid sulfate soils plans, heritage management documents, flood and acoustic assessments), costs associated with any affordable housing levy contribution imposed under cl 6.5, costs of design competitions where required by cl 6.9(5), and the compliance costs of meeting design excellence, sustainability and parking standards (cl 6.9; cl 6.13; cl 6.8). The Council bears administrative costs enforcing and assessing compliance, maintaining the maps and recording covenant restrictions.
Who decides
The Council is the consent authority (cl 1.6), with the Central Sydney Planning Committee acting for major developments under the City of Sydney Act noted in cl 1.6. Certain external bodies influence decisions by mandatory consultation or concurrence: Commonwealth airport authority (cl 6.3), Heritage Council (cl 5.10(7)), and public authorities holding registered instruments (cl 1.9A(3)).
Behaviour changes
The Plan steers behaviour by (i) limiting built form through mapped FSR and heights (cl 4.3; cl 4.4), (ii) restricting car parking supply by maxima and conditions intended to discourage peak private vehicle travel (cl 6.7; cl 6.8), (iii) encouraging retail and cultural activity at ground level through active frontage requirements and aims (cl 6.6; cl 1.2), (iv) incentivising design excellence with a limited FSR uplift (cl 6.9(7)), and (v) imposing on developers the choice between providing affordable dwellings by dedication or paying a monetary contribution (cl 6.5(2)-(3)).
Key duties and rights
Duties imposed on applicants and landowners
Obtain development consent where required: subdivision (cl 2.6), demolition (cl 2.7), the temporary use regime beyond 52 days (cl 2.8), conversion of fire alarms (cl 5.8(2)), works impacting heritage items or within conservation areas unless authorised under limited notification (cl 5.10(2)-(3)), works on mapped acid sulfate soils without an exempt preliminary assessment (cl 6.1(2)-(4)), and any development in a flood planning area unless the consent authority is satisfied as to compatibility with flood function and evacuation (cl 5.15(2)).
Provide specified technical documentation: acid sulfate soils management plans where required (cl 6.1(3)), heritage management documents or heritage conservation management plans where the consent authority requires them (cl 5.10(5)-(6)), complying development documentation as prescribed by the Act and Regulation (cl 3.2(4)), and the planning grounds document required by the Environmental Planning and Assessment Regulation when an application seeks to contravene a development standard under cl 4.6 (cl 4.6(3) note).
Meet mapped numerical limits or properly seek approvals to vary them: comply with Height and Floor Space Ratio maps (cl 4.3; cl 4.4) except where cl 4.3A allows a 3 metre rooftop exception for specified utility-related elements that do not provide floor space (cl 4.3A), or where the exceptions-to-development-standards process is invoked (cl 4.6).
Comply with car parking maxima and visitor parking requirements, including rounding rules (cl 6.8(2)-(6)).
For development over thresholds in cl 6.5(1), accept an affordable housing contribution condition (cl 6.5(2)), either by providing dwellings as land dedication or by a monetary payment in accordance with the Council’s affordable housing program (cl 6.5(3)-(4)).
On active street frontages, ensure ground floor premises facing the street are used as business or retail premises, subject to limited exceptions (cl 6.6(3)-(5)).
Ensure essential services will be available or that arrangements have been made for water, electricity, sewerage, stormwater and road access before consent is granted (cl 6.10).
Rights and entitlements of applicants and owners
Right to seek exempt or complying development where the work satisfies Schedule 2 or Part 1 of Schedule 3 and the Building Code of Australia, with the caveat that environmentally sensitive areas are excluded (cl 3.1-3.3; Schedules 2-3).
Right to apply for development consent and to have the consent authority assess applications against the zone objectives (cl 2.3), to be granted consent subject to conditions, and to appeal decisions according to the procedures in the Act (the Plan references the Act’s DA framework throughout; see cl 1.6 and notes).
Right to invoke the exceptions-to-development-standards procedure (cl 4.6) by submitting the required planning grounds and having the consent authority keep a record of its assessment (cl 4.6(3)-(4)). The Regulation requires a supporting document to accompany such applications (cl 4.6 note).
Where a development wins a competitive design process and demonstrates design excellence, the applicant may be eligible for up to a 10 percent FSR increase (cl 6.9(7)).
Right to satisfy any affordable housing obligation by dedication of dwellings with subsequent monetary payment for any remainder, or to elect to pay monetary contribution only (cl 6.5(3)).
Discretions and duties of the consent authority
The consent authority must assess applications having regard to zone objectives (cl 2.3(2)) and may require heritage assessments, conservation management plans and flood and bushland assessments as appropriate (cl 5.10(4)-(6); cl 5.15; cl 5.16).
The consent authority must not grant consent where legislated prohibitions apply, but has discretion to refuse or impose conditions where matters such as noise from music cannot be managed to acceptable levels (cl 5.14(2)).
The consent authority has power to require covenants to prevent creation of floor area causing double-dipping and to reduce allowable FSR on other lots to reflect covenant effects (cl 4.5(9)-(10)).
The consent authority may grant consent for otherwise prohibited development for conservation incentives where conservation is facilitated and works are secured by condition (cl 5.10(10)).
Rights of public authorities and third parties
The Plan states that the suspension of covenants does not affect rights or interests of any public authority under any registered instrument (cl 1.9A(3)), preserving statutory protections.
The Plan requires consultation or notification to certain bodies as a pre-condition to consent in particular circumstances, for example notification to the Heritage Council for archaeological site consents (cl 5.10(7)) and consultation with the Commonwealth body responsible for airport surfaces when the Limitation or Operations Surface is penetrated (cl 6.3(2)).
Recordkeeping and transparency requirements
The consent authority must keep a record of its assessment when an application seeks to contravene a development standard under cl 4.6(4). The Plan also directs that maps and associated data are to be made available publicly in accordance with Ministerial arrangements (cl 1.7(3)-(4)).
Taken together, the Plan creates duties to obtain consents and technical reports, grants rights to apply for flexible outcomes under defined processes, and gives the consent authority a series of assessment discretions that tie to specific local objectives such as heritage conservation, public domain activation and flood safety.
Penalties and enforcement
The Plan itself sets out regulatory triggers, consent requirements and exclusions, but it does not list specific pecuniary penalties or criminal sanctions within its text. Enforcement mechanisms and sanctions for non‑compliance are principally the apparatus of the Environmental Planning and Assessment Act 1979 and associated Regulations, which the Plan repeatedly references for process and certification (see notes in cl 3.2 and references at cl 1.6). In practical terms the Plan creates enforceable obligations by doing the following:
Requirement to obtain consent or complying development certificates: The Plan specifies that certain activities may be carried out only with development consent (for example subdivision cl 2.6, demolition cl 2.7, many heritage works cl 5.10(2), conversion of fire alarms unless complying development cl 5.8). If works are carried out without the required consent, those works will be unauthorised development under the Act and open to the enforcement remedies in the Act and Regulation, including orders for remediation, fines and injunctions administered under the Act. The Plan assumes the Act’s enforcement regime applies, but does not restate the Act’s sanctions.
Conditions and covenants: The consent authority may impose conditions on consent, including recording covenants that affect future floor space creation (cl 4.5(9)-(10)). Breach of these conditions or registered covenants engages remedies in property law and the Act’s compliance provisions; the Plan itself sets the framework for imposing those conditions.
Records and procedural obligations: The Plan requires the consent authority to keep records of assessments under cl 4.6(4). Failure to follow required procedures may vitiate a decision and expose the consent authority to challenge, and may also affect the enforceability of conditions.
Notifications and concurrence: The Plan creates mandatory consultation steps that act as gatekeepers: for airspace penetrations the consent authority must consult the relevant Commonwealth body (cl 6.3(2)); for archaeological sites, the Heritage Council must be notified and its response considered (cl 5.10(7)). Failure to consult where required will affect the lawfulness of a consent.
Exempt and complying development compliance checks: Exempt works under Schedule 2 must still meet Building Code of Australia requirements and not be on heritage-listed items (cl 3.1(3)(a)-(d)). Complying development requires certificates under the Act (cl 3.2 and note). Non‑compliance risks enforcement by the issuing authority and the consent authority.
Acquisition provisions and owner-initiated acquisition: The Plan identifies relevant acquisition authorities for certain land reservation types for owner-initiated acquisition under the Land Acquisition (Just Terms Compensation) Act (cl 5.1). The Land Acquisition Act’s enforcement and compensation regimes govern acquisition disputes.
Practical enforcement implications for practitioners
Because the Plan is tightly cross-referenced to the Act and Regulations, enforcement and penalty mechanisms will be those provided by those instruments. Practitioners should therefore review the Act and the Regulations for specifics about fines, restoration orders and timelines where unauthorised development is suspected.
Administrative risk: failure to comply with the Plan’s mapped limits, notification or consultation obligations, or to provide required assessments (heritage, acid sulfate soils, flood) can lead to refusal of consent, conditions that require remediation or, where work has been done already, compliance action under the Act.
In short, the Plan establishes what is required; legal sanctions and remedial powers arise from the broader statutory scheme rather than from penalties embedded in the Plan’s text.
How it interacts with other laws
The Plan is not a stand‑alone code. It is an environmental planning instrument made under the Environmental Planning and Assessment Act and is expressly subject to, and cross-referenced with, a range of State and Commonwealth laws and policies. The Plan repeatedly states which external instruments prevail or are applicable, and imports external technical guidance documents by reference.
Relationship with State Environmental Planning Policies and the Act
The Plan is subordinate to any State environmental planning policy that prevails under section 3.28 of the Act (cl 1.9(1)). The Plan expressly lists SEPPs or provisions that do not apply to the land (cl 1.9(2)). The Act determines the structure of consent processes and the definition of complying development (note at cl 3.2 referring to s 4.2 of the Act).
Heritage and Aboriginal heritage
Heritage matters are dealt with in tandem with the Heritage Act 1977. The Plan requires consent for altering heritage items or items in heritage conservation areas and to consider the Heritage Council on archaeological matters or demolition of nominated State heritage items (cl 5.10(2), (7), (9)). Aboriginal heritage and places are to be considered and local Aboriginal communities notified where relevant (cl 5.10(8)).
Local Government Act interactions
The Plan enables the Council to classify or reclassify public land under the Local Government Act 1993 and refers to the Local Government Act’s regime for community land plan of management requirements, for example with temporary use of council land and recreational uses of public bushland (sch 2 note, sch 2‑oc.4; cl 5.2; cl 5.16(5)).
Land acquisition and Crown interests
Clause 5.1 identifies the relevant acquisition authority for particular reserved land for owner-initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 and notes the Land Acquisition Act’s provisions where the landholder suffers hardship (cl 5.1(1)-(3)). Clause 1.9A(2) excludes certain instruments within the meaning of the Crown Land Management Act 2016 from the suspension power.
Building Code, BASIX and other technical regimes
Exempt and complying development must meet Building Code of Australia requirements and where BASIX commitments exist, cl 4.6(8)(b) prevents contravention of BASIX commitments through the exceptions-to-development-standards process. The Plan’s complying development references also engage the EP&A Regulation’s conditions and processes (cl 3.2 and note).
Flood, bushfire and environmental technical instruments
Flood planning requires consideration of the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual, including projected climate change impacts (cl 5.15(4)-(5)). Bush fire hazard reduction is permitted without consent under the Rural Fires Act 1997 (cl 5.11). Environmentally sensitive area exclusions for exempt and complying development link to Coastal Management Act, Fisheries Management Act and Ramsar and World Heritage designations (cl 3.3).
Airport and Commonwealth controls
Airspace controls require consultation with the relevant Commonwealth body for Sydney (Kingsford-Smith) Airport where the Limitation or Operations Surface may be penetrated (cl 6.3(2)-(4)). Aircraft noise affected development is governed by Australian Standard AS 2021,2000 as adopted into cl 6.4(3).
Other specific statutory references and instruments
The Plan cross-references a number of other statutes as context for exclusions, processes and definitions: the Local Land Services Act 2013 (cl 5.16(6)), Pipelines Act 1967 (cl 5.16(4)(a)), Crown Land Management Act 2016 (cl 1.9A(2)(b)), Graffiti Control Act 2008 (sch 2 note under street art), and State environmental planning policies such as SEPP (Housing) 2021 and SEPP (Transport and Infrastructure) 2021 noted in the Land Use Table preface.
Net effect
The Plan operates by mapping local outcomes and by slotting into the broader NSW planning, heritage, environmental, building and infrastructure legal frameworks. Practitioners must therefore treat the LEP as one layer among many, and align DA strategy and documentation with the requirements and standards embedded in the other Acts, SEPPs and technical guidelines to which this Plan refers.
Amendment history
The Plan includes multiple amendment annotations in its text. Those annotations are part of the instrument’s official record of legislative change and identify insertions (Ins), amendments (Am) and repeals (Rep) with statutory citation keys. Below is a clause-by-clause summary of the amendment markers that appear in the text provided. Each marker is reported exactly as given in the Plan.
Clause 1.2 (Aims of Plan): Am 2019 (621), Sch 4.3[1]; 2020 (724), Sch 2[1]. This indicates amendments to the stated aims occurred in 2019 and 2020 as recorded.
Clause 1.7 (Maps): Am 2019 (621), Sch 4.3[2].
Clause 1.8A (Savings provisions relating to development applications): Am 2018 (488), Sch 1.5[1]; 2019 (621), Sch 5[1]; 2019 (661), Sch 1.4[1]; 2021 (412), Sch 3[1]; 2023 (524), Sch 1.1[2]; 2023 (609), Sch 2.1. This clause has been amended multiple times reflecting how saved application treatment has changed with later State policies and amendments.
Clause 1.9 (Application of SEPPs): Am 2019 (621), Sch 4.3[3].
Clause 1.9A (Suspension of covenants, agreements and instruments): Am 2019 (621), Sch 5[2]-[4].
Clause 2.1 (Land use zones): Am 2022 (677), Sch 1[1]; 2022 (828), Sch 1.21[1] (am 2023 (82), Sch 1.2[8]). This shows zoning amendments in 2022 and an amendment noted as affecting 2023.
Clause 2.3 (Zone objectives and Land Use Table): Am 2019 (621), Sch 4.3[4].
Land Use Table marginal note: Am 2017 (726), Sch 2.8[1]; 2022 (72), Sch 1.59[1]; 2022 (677), Sch 1[2]; 2022 (629), Sch 3.22[1]; 2022 (828), Sch 1.21[2] (am 2023 (82), Sch 1.2[9]); 2024 (42), Sch 1.44[1]. The Land Use Table has been the subject of multiple amendments across years.
Clause 3.1 (Exempt development): Am 2019 (621), Sch 4.3[5].
Clause 3.2 (Complying development): Am 2019 (621), Sch 4.3[6].
Clause 3.3 (Environmentally sensitive areas excluded): Am 2018 (106), Sch 2.22[1]; 2019 (621), Sch 4.3[8].
Clause 4.6 (Exceptions to development standards): Am 2019 (621), Sch 4.3[7]; 2023 (524), Sch 1.1[1]. Note that subclauses have been repealed and amended in parts.
Clause 5.1 (Relevant acquisition authority): Am 2019 (621), Sch 4.3[9] [10]; 2020 No 30, Sch 4.104[1]; 2024 (42), Sch 1.44[2].
Clause 5.2 (Classification and reclassification of public land): Am 2019 (621), Sch 4.3[11] [12].
Clause 5.5: Rep 2018 (106), Sch 2.22[2].
Clause 5.8 (Conversion of fire alarms): Am 2017 (493), Sch 1.2[2] in cl 6.8 and for 5.8 was retained; and later clause citation shows compliance notes elsewhere. Clause 5.8 remains in the Plan with content.
Clauses 5.9 and 5.9AA: Rep 2020 (501), Sch 2.9.
Clause 5.10 (Heritage conservation): contains notes and is present without a dated amendment marker in the provided extract.
Clause 5.14 (Playing and performing music): Ins 2020 (724), Sch 3. This provision was inserted in 2020.
Clause 5.15 (Flood planning): Ins 2021 (412), Sch 3[2]. Am 2023 (609), Sch 2.26[1] [2]. Indicates insertion in 2021 and amendment in 2023.
Clause 5.16 (Public bushland): Ins 2022 (629), Sch 2[3].
Clause 5.17 (Canal estate development prohibited): Ins 2022 (629), Sch 2[4].
Clause 6.1 (Acid sulfate soils): contains no amendment marker in the provided extract, but clause 6.2 is repealed: cl 6.2 Rep 2021 (225), Sch 1.
Clause 6.3 (Airspace operations): appears without a dated amendment marker in the extract.
Clause 6.5 (Affordable housing): Am 2021 (208), Sch 2[1]-[4]; 2023 (627), Sch 1.3[1] [2]. Shows amendments in 2021 and 2023.
Clause 6.6 (Active street frontages): Am 2022 (828), Sch 1.21[3].
Clause 6.7 (Car parks): appears without amendment marker, but cl 6.8 (Car parking ancillary to other development) was Am 2017 (493), Sch 1.2[2].
Clause 6.9 (Design excellence): Am 2023 (523), Sch 1.15[1] [2].
Clause 6.12 (Serviced apartments): Ins 2019 (661), Sch 1.4[2]. Am 2023 (664), Sch 3.18.
Clause 6.13 (Sustainability requirements for certain large commercial development): Ins 2023 (421), Sch 4.
Schedule 2 (Exempt development): Am 2017 (751), Sch 1.4; 2020 No 30, Sch 4.104[2].
Schedule 3 (Complying development): Am 2017 (269), Sch 5.
Schedule 4 and Schedule 5 entries are noted as blank when the Plan was made; Schedule 4’s related consent/approval processes are noted in cl 5.2 and contain amendment markers referenced above.
This list reproduces the amendment indicators shown within the Plan text. Each parenthetical citation (for example 2019 (621), Sch 4.3[1]) identifies the amending instrument and schedule in the Plan’s consolidated text record. To track the exact content changes, one must consult the statutory instruments cited (for example the 2019 amending instrument numbered 621 and the specified schedule and item). The Plan’s inline amendment record is the starting point for retrieving the amending instruments and their text.
Litigation history
The text of the Plan provided contains no references to case law or particular judicial decisions. The instrument itself does not record litigation history, interlocutory rulings, or reported authorities addressing its interpretation. Where legal disputes arise about Plan provisions,interpretation of mapped heights and floor space ratios, the sufficiency of heritage or flood assessments, the validity of covenants preventing double-dipping, or the exercise of discretion in applying cl 4.6,those disputes would be determined under the Environmental Planning and Assessment Act 1979 and associated administrative and judicial review processes. The Plan does not name any cases nor include judicial interpretations. Practitioners should therefore search the NSW case law databases for decisions addressing LEPs and the particular issues that may arise under this Plan (for example heritage, FSR calculation, exceptions-to-development-standards challenges) if specific precedent guidance is required.
Gotchas
The Plan contains a number of provisions that present traps for the unwary practitioner or developer. These are features where failure to recognise a detail can materially affect development outcomes, timing and costs.
Savings rules for in‑flight DAs
Clause 1.8A contains detailed savings clauses. A development application made before this Plan’s commencement must be determined as if the Plan had not commenced (cl 1.8A(1)), but subsequent amendments have their own savings exceptions (cl 1.8A(2)-(7)). Multiple amending instruments are listed in cl 1.8A, so determining which rules govern a particular DA requires checking the date of the DA against the commencement dates of the Plan and its amending instruments. Mistaken reliance on an amendment that is not applicable to a lodged DA can lead to rejection or the need to re-lodge.
Suspension of private covenants, but with carve-outs
Clause 1.9A allows the Plan to enable development despite private covenants, agreements or similar instruments “to the extent necessary” (cl 1.9A(1)). However, it excludes covenants imposed by the Council, certain Crown and conservation agreements, biobanking agreements and planning agreements (cl 1.9A(2)(a)-(g)), and it preserves public authority registered instruments (cl 1.9A(3)). Practitioners must therefore check whether a covenant is one of the excluded categories. The Plan’s suspension power is not absolute.
Height exceptions narrow and non‑habitable
Clause 4.3A permits development consent to exceed mapped height by up to 3 metres only where the additional height is associated with specified infrastructure (electricity generating works, public utility undertaking, resource recovery facility, waste or resource transfer station), will cause minimal overshadowing and “does not include floor space area and is not reasonably capable of modification to include floor space area” (cl 4.3A(a)-(c)). The non-floor-space requirement is strict. Increased rooftop mechanical or plant that could be easily converted into additional habitable or leasable floor area may fail this test.
Floor space calculation and anti‑double dipping covenants
Clause 4.5 restricts what land may be included in site area and allows covenants to prevent creation of floor area on a lot because it was included in a consolidated site area calculation (cl 4.5(4), (6), (9)). Clause 4.5(10) then reduces the maximum FSR on other land where such a covenant applies. The interplay of strata, consolidated sites and recorded covenants can materially change permitted floor area; practitioners should review title boundaries, registered covenants, strata plans and any past consents to avoid unexpected FSR limits.
Exceptions to development standards require written grounds and recordkeeping
The exceptions-to-standards route in cl 4.6 requires the applicant to demonstrate that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6(3)). The Regulation requires an accompanying document (cl 4.6 note). The consent authority must keep a record of its assessment (cl 4.6(4)). Poorly prepared exceptions documents, or failure to provide the prescribed material, risks refusal and creates an administrative record that may be scrutinised on review.
Active street frontage and ground‑floor use constraints
Clause 6.6 requires that ground-floor premises facing the street be business or retail premises to qualify as an active street frontage (cl 6.6(3)-(5)). Exceptions (entrances, vehicle and fire access) are narrow. Mixed-use applicants who expect ground floor residential lobbies or other uses must plan accordingly or risk refusal.
Affordable housing levy mechanics and equivalence rate
Clause 6.5 allows the Council to impose affordable housing contributions of up to 3 percent of floor area for residential and 1 percent for non-residential floor area over the thresholds (cl 6.5(2)). The developer may discharge the obligation by dedicating dwellings of not less than 35sqm each plus a monetary remainder, or by a monetary contribution (cl 6.5(3)). The conversion rate from floor area to monetary value is set by the City of Sydney Affordable Housing Program adopted 26 June 2023 (cl 6.5(4)). This ties an LEP obligation to a municipal policy for valuation, so practitioners must check the current Program and its valuation methodology when modelling costs.
Music protections are limited by acceptable noise management
Clause 5.14 prevents consent refusal for licensed premises on specific grounds related to music, dancing and stage orientation (cl 5.14(1)), but cl 5.14(2) allows refusal where the noise cannot be managed and minimised to an acceptable level. This creates a potential evidentiary requirement to show acoustic mitigation strategy and monitoring plans at DA stage.
Flood planning references external guidance with changing editions
Clause 5.15 requires consideration of the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.15(4)-(5)). These are external documents that can be updated, and the Plan ties assessment standards to the edition cited. Practitioners must ensure their flood assessments use the current editions cited or otherwise clarify which version applies to the DA.
Heritage consent exceptions via Council advice
Clause 5.10(3)(a) states that consent is not required for heritage works if the applicant notifies the consent authority and the consent authority confirms in writing that the works are minor and would not adversely affect heritage significance. This process relies on the consent authority’s pre-DA written advice. Developers without that written confirmation risk enforcement action if they proceed relying on an informal assurance.
Exempt development caveats
Schedule 2 exempt categories contain multiple specific limits: street art must not constitute signage and must not be on heritage items (sch 2 sec oc.2); temporary signs have strict size and display period limits and must be for community events (sch 2 sec oc.3); footpath use by food and drink premises excludes pubs and imposes seating and time limits (sch 2 sec oc.5). Assuming a use is exempt without checking these particular conditions is a common pitfall.
Design excellence and competition costs
Clause 6.9 requires a competitive design process for certain tall or high-cost projects and links the reward to a FSR uplift when the design wins (cl 6.9(5)-(7)). Such competitions can be expensive and time consuming. Where a developer wishes to pursue the uplift, they must be prepared to fund and run a competition to the City of Sydney Competitive Design Policy standards or justify why a competition is unnecessary (cl 6.9(6)).
Canal estate prohibition
Clause 5.17 expressly prohibits canal estate development on land to which the Plan applies. Any proposal resembling a canal estate must be screened out at the outset (cl 5.17(1)-(2)).
These “gotchas” are concrete operational details embedded in the Plan. They affect DA strategy, budgeting and timing, and they materially change how a project should be scoped and documented.
How to comply
A concise, practical compliance checklist for practitioners preparing development proposals under this LEP. Each step references the clause(s) that create the obligation or standard.
Identify the land and applicable maps
Confirm whether the parcel is within the Plan’s land application area, and verify if it is shown as “Deferred matter” (cl 1.3(1)-(1A)). Obtain the Land Zoning Map, Height of Buildings Map, Floor Space Ratio Map, Active Street Frontages Map, Acid Sulfate Soils Map and any other maps the Plan references (cl 1.7; cl 2.2; cl 4.3; cl 4.4; cl 6.6; cl 6.1).
Establish the zone and permitted uses
Read the Land Use Table for the parcel’s zone to determine whether the proposed use is permitted without consent, permitted with consent or prohibited (cl 2.3; Land Use Table). The consent authority must have regard to the zone objectives when assessing an application (cl 2.3(2)).
Check whether the proposal is exempt or complying development
Determine if the proposal is listed in Schedule 2 exempt development or Part 1 of Schedule 3 complying development and satisfies the specific standards and Building Code of Australia requirements (cl 3.1-3.2; Schedules 2-3). Remember that environmentally sensitive areas are excluded from exempt and complying development (cl 3.3).
Verify mapped numerical controls and measurement rules
Check the mapped height and FSR for the land and calculate gross floor area and site area under cl 4.5. Exclude areas specifically listed in cl 4.5(4)-(7) and consider whether covenants or prior consents affect allowable FSR (cl 4.5(9)-(10)).
If seeking to vary a development standard
Prepare the planning grounds document required by the EP&A Regulation to support an application under cl 4.6. Demonstrate that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds (cl 4.6(3); note). Be aware the consent authority will record its assessment (cl 4.6(4)).
Heritage and Aboriginal heritage
If the site contains a heritage item or lies within a heritage conservation area, determine if the proposed works require heritage consent (cl 5.10(2)). If required, be prepared to provide a heritage management document or a heritage conservation management plan as requested (cl 5.10(5)-(6)). For archaeological sites and nominated State heritage items follow the notification requirements to the Heritage Council and allow 28 days for response where required (cl 5.10(7), (9)).
Acid sulfate soils and environmental technical reports
For lands mapped with acid sulfate soils classes, prepare an acid sulfate soils management plan in accordance with the Acid Sulfate Soils Manual and obtain the consent authority’s confirmation where a preliminary assessment indicates a management plan is not required (cl 6.1(2)-(4)).
Flood risk and climate considerations
If the land is within a flood planning area, the DA must show compatibility with flood function and behaviour and incorporate measures to manage evacuation risk, taking into account projected climate change impacts as required by cl 5.15(2)-(3). Reference the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual as specified (cl 5.15(4)-(5)).
Design excellence and competitions
If the proposal triggers cl 6.9(5) (building above RL75 or estimated cost > $100m) and you wish to pursue a FSR uplift, run or participate in a competitive design process consistent with the City of Sydney Competitive Design Policy. Document the process and secure Council’s satisfaction about design excellence to be eligible for a 10 percent uplift (cl 6.9(5)-(7)).
Affordable housing levy planning
For qualifying development under cl 6.5(1) (over specified gross floor area thresholds), model the affordable housing contribution (3 percent residential, 1 percent non‑residential) and plan whether to satisfy it by dedicating dwellings (minimum 35 sqm each as per cl 6.5(3)) with monetary remainder, or by monetary contribution alone. Check the City of Sydney Affordable Housing Program for the conversion rate (cl 6.5(2)-(4)).
Active street frontage and ground floor activation
If the site is on an Active Street Frontage map, ensure the design provides business or retail uses on all ground floor premises facing the street, with limited exclusions for lobbies and service access (cl 6.6(2)-(5)).
Car parking strategy
Calculate car parking provision in accordance with cl 6.8(4)-(6). Ensure the car park design and proposed operation will not encourage peak private vehicle travel and includes restrictions on opening hours and duration where required (cl 6.7; cl 6.8(1)-(3)).
Noise and licensed premises
For licensed premises, prepare acoustic and noise management plans that demonstrate the noise from music can be managed to an acceptable level, since cl 5.14 protects certain aspects of music but permits refusal where noise cannot be adequately managed (cl 5.14(1)-(2)).
Fire alarm conversion works
If converting fire alarm monitoring arrangements, note cl 5.8 requires consent for conversion in most cases, but the conversion may be complying development if limited to internal alterations or small external antennas and subject to work-hour conditions (cl 5.8(2)-(4)). Consult Fire and Rescue NSW agreements where private service providers are involved (cl 5.8(5)).
Pre-lodgement and consultation
Use pre-lodgement meetings with Council to clarify obligations and secure any necessary written advice that can narrow the scope of assessments required, for example the written confirmation under cl 5.10(3)(a) that heritage works are minor and do not require consent.
Check for covenant suspension and excluded instruments
If private covenants exist, determine whether cl 1.9A applies to suspend them, and whether the covenant falls into an excluded category (Council-imposed covenants, Crown-related instruments, conservation agreements, planning agreements) so that the covenant remains enforceable (cl 1.9A(1)-(3)).
Document management and recordkeeping
Ensure that the application includes all documents referenced in this LEP and in the EP&A Regulation, including planning grounds for exceptions, heritage and AS 2021,2000 compliance for aircraft noise where relevant (cl 6.4(3)), and reports referenced by the relevant SEPPs. Be prepared for the consent authority to keep assessment records under cl 4.6(4).
Title and covenant searches, and review of prior consents
Before finalising design and financial modelling, obtain up-to-date title searches, searches for registered covenants, and review existing consents to identify any covenants that may trigger cl 4.5(9)-(10) anti-double dipping consequences or fall within suspension exceptions at cl 1.9A.
Liaison with other authorities
Where the Plan requires external consultation (for example with Commonwealth airport authorities under cl 6.3), allow time in the program for those consultations and any potential conditions or refusals they may advise.
Check amendment history and applicable version
Because the Plan has been amended numerous times (see Amendment history), confirm which version of the Plan applies at the time of lodgement and whether any savings provisions (cl 1.8A) alter the applicable rules for an in-flight application.
Following these steps and explicitly tying each element of the DA and the project brief to the relevant clause in the LEP will reduce approval risk, support the consent authority’s assessment, and clarify cost and timing implications for clients. Where complexity is present,heritage, flood exposure, acid sulfate soils, airport surfaces, or major design competitions,allow specialist technical reports and additional time for consultation and for responding to Council conditions.
(iv) establish a significant new people-oriented public town square and other vibrant public plazas and public spaces,
(c) to deliver environmental planning outcomes and benefits to the public and owners of land in the Green Square Town Centre that are significantly superior to those likely to result from development of the land in accordance with the local environmental planning instruments that formerly applied to that land,
(d) to accommodate and integrate the management of stormwater (including floodwater) into the function and design of buildings and the public domain in the Green Square Town Centre,
(e) to encourage the provision of a high-quality, safe and functional public domain that provides enhanced amenity and quality of life for the local community,
(f) to ensure that the public domain of the Green Square Town Centre is fronted by high-quality buildings having a scale and alignment that both define and contribute positively to the amenity of the public spaces (including parks, plazas and streets) that they adjoin,
(g) to maximise the use of public transport, walking and cycling by integrating land uses, access to public transport and services and the provision of on-site parking,
(h) to ensure that development is designed to promote the vitality of the public domain by providing active frontages to the streets and other identified public spaces, including the location of active retail, food, drink and entertainment premises, and community and cultural facilities at ground level (particularly at the edge of public plazas),
(i) to allow equitable access to, within and across the Green Square Town Centre for pedestrians, cyclists, public transport and other vehicles.
(1A) Despite subclause (1), this Plan does not apply to the land identified as “Deferred matter” on the Land Application Map.
1 Definitions
1 Definitions
1.4 Definitions
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
Note—
The City of Sydney Act 1988 constitutes the Central Sydney Planning Committee which has and may exercise the functions of the Council under Parts 4, 5 and 6 of that Act in relation to the carrying out of major development, to the exclusion of the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note—
The maps adopted by this Plan are to be made available on the official NSW legislation website in connection with this Plan. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Infrastructure.
cl 1.7: Am 2019 (621), Sch 4.3[2].
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
Note—
However, City of Sydney Planning Scheme Ordinance (1971), South Sydney Local Environmental Plan 1998 and South Sydney Local Environmental Plan No 114 (Southern Industrial and Rosebery/Zetland Planning Districts) continue to apply to the land identified as “Deferred matter” on the Land Application Map under clause 1.3(1A).
1 Savings provisions relating to development applications
1 Savings provisions relating to development applications
1.8A Savings provisions relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note—
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) The amendments made to this Plan by State Environmental Planning Policy Amendment (Artisan Food and Drink Industries) 2018 and State Environmental Planning Policy Amendment (Land Use Terms) 2018 do not apply to a development application made but not determined before the commencement of those amendments.
(3) The amendments made to this plan by Sydney Local Environmental Plan Amendment (Serviced Apartments) 2019 do not apply to a development application made but not finally determined before the commencement of those amendments.
(4) The amendments made to this plan by State Environmental Planning Policy Amendment (Flood Planning) 2021 do not apply to a development application made but not finally determined before 14 July 2021.
(5) The amendments made to this plan by Sydney Local Environmental Plan Amendment (Flood Planning) 2021 extend to a development application made on or after 14 July 2021.
(6) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Exceptions to Development Standards) 2023 must be determined as if that policy had not commenced.
(7) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
State Environmental Planning Policy No 1—Development Standards
State Environmental Planning Policy No 4—Development Without Consent and Miscellaneous Exempt and Complying Development (clause 6 and Parts 3 and 4)
State Environmental Planning Policy No 60—Exempt and Complying Development
cl 1.9: Am 2019 (621), Sch 4.3[3].
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes—
cl 2.3: Am 2019 (621), Sch 4.3[4].
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdi
This is an opening excerpt, not the complete document.