Sutherland Shire Local Environmental Plan 2006
23Environmental risk—acid sulfate soils
Start here
Get a plain-English read of 23
Turn the raw legal text into a practical explanation grounded in Sutherland Shire Local Environmental Plan 2006.
23 Environmental risk—acid sulfate soils
23 Environmental risk—acid sulfate soils
(1) The objectives of this clause are as follows—
(a) to manage any disturbance to acid sulfate soils so as to minimise impacts on natural waterbodies, wetlands, native vegetation, agriculture, fishing, aquaculture and urban and infrastructure activities,
(b) to require development consent for works that would disturb soils or groundwater levels on land identified as having, or potentially having, acid sulfate soils,
(c) to require special assessment of certain development on land identified as being subject to risks associated with the disturbance of acid sulfate soils.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land of the class specified for those works, except as provided by this clause.
| Class of land as shown on Acid Sulfate Soils Map | Works | | 1 | Any works. | | 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. | | 3 | Works beyond 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered beyond 1 metre below the natural ground surface. | | 4 | Works beyond 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered beyond 2 metres below the natural ground surface. | | 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that are likely to lower the watertable below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Consent must not to be granted under this clause unless—
(a) an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Guidelines and has been provided to the consent authority, and
(b) (Repealed)
(c) the consent authority has considered the likelihood of the proposed works resulting in the discharge of acid water, and
(d) the consent authority is satisfied that any disturbance of acid sulfate soils resulting from the proposed works will be managed so as to minimise impacts on natural waterbodies, wetlands, native vegetation, agriculture, fishing, aquaculture and urban and infrastructure activities.
(4) Consent is not required under this clause for the carrying out of works if—