Tasmania-based training requirement, reg 9(1) and reg 9(2)(b)(ii). Candidates must undertake at least 12 months of the minimum two years professional training in Tasmania, and at least six months of cadastral boundary training must be in Tasmania. This creates a geographic constraint that affects interstate or overseas graduates and employers. Candidates who undertake most of their training interstate or overseas must secure Tasmanian placements for these minimum periods or obtain an exemption from the prescribed institute under reg 9(6). The need to be physically present for specific periods has opportunity cost implications and may constrain mobility of trainees.
Definition of “not diligent” and removal/suspension of candidacy, reg 6(3). The institute may remove or suspend a candidate it considers not diligent, but the regulation defines neither the standard of diligence nor procedural steps prior to removal. Candidates should proactively comply with notification, reporting and training paperwork to minimise risk. Employers and supervisors should keep contemporaneous records given the institute’s power to remove names or suspend registration for undefined “not diligence”.
Exemption discretion concentrated in the prescribed institute, regs 9(6), 10(6), 12(5). The institute can exempt candidates from training or examination requirements in cases of sufficient experience or approved postgraduate study. This discretion, while useful, is not fully specified in criteria or appeal rights within the regulations. Candidates who believe they meet exemption grounds should request written reasons and record communications because the exercise of the institute’s discretion will determine timelines and cost.
Pre-examination submissions cannot be used as project submissions, reg 10(2)(b). Rural and urban surveys submitted under reg 10 as pre-examination requisites are explicitly taken not to be project surveys for the purposes of regulation 11(1)(a) and (b) and may not be used as such. Candidates must plan to produce separate substantive project examinations distinct from their pre-examination surveys. Failure to recognise this could result in wasted effort or delay.
Technical content requirements for urban projects, Schedule 1 Part 2. Urban project examinations require measurement of at least two lines of at least 70 metres, measurement with one technology and checking with another, and reporting traceability to the National Standard of Length. Meeting these technical metrology requirements may require access to equipment, calibration records and metrology expertise beyond standard practice. Candidates should ensure equipment calibration and documentation are in order before submission.
Currency of exam passes, reg 11(2). Examination passes are only valid for three years. If a candidate passes one or two examinations early and delays passing the remaining exam, the earlier passes may lapse and require retaking. Candidates should plan examination timelines to avoid loss of earlier passes.
Original field records requirement, reg 12(2). Project submissions must include all original field records and calculations. Candidates and supervisors must preserve originals and not submit only copies. Loss or incomplete original records risks rejection or audit notifications from the Surveyor-General.
Surveyor-General audit and requisition powers, reg 12(3)-(4). Projects may be submitted to the Surveyor-General for examination, requisition and audit. Audit findings are returned to the institute and could trigger rework, further training, or impact registration applications. Candidates and supervisors should expect possible follow-up and maintain traceable records.
Supervisor certification formality, regs 9(3)-(5) and reg 10(2)(c). Supervisors must use forms determined by the institute to certify training and candidate responsibility for surveys. Failure to use the institute form or to lodge certificates properly could render training non-compliant.
Fees set in fee units, reg 24. The regulations fix the registration and late re-registration fees in fee units. Practitioners must identify the current monetary value of a fee unit under the relevant fee unit legislation or financial directions, because the regulation does not state the monetary amount per fee unit.
Institute’s cost-recovery restriction, reg 5(4). The institute must not charge fees that recoup more than the cost of the service actually provided. While protective for candidates, this requires the institute to justify fee levels and maintain cost accounting if challenged. Conversely, the institute’s power to set fees remains substantial and could result in administrative burdens for candidates if fees are poorly calibrated.
Ambiguities and undefined standards. Several standards are left to opinion or the discretion of bodies: “sufficient professional experience” for exemption, “suitable” projects for approval, “unsatisfactory standard” for refusal of examination application, and “not diligent” for removal from the register are examples where the regulations do not define objective tests. This creates litigation and review risk over time and increases the importance of written decisions and reasons.
Procedural timing and deadlines. The Surveyor-General’s notice and hearing obligations for refusal lack fixed timeframes for the hearing date, and reg 22 requires Ministerial review to be sought within three months of notification of the decision. Candidates should act promptly when notified to preserve review rights.
Ministerial review is an administrative remedy, reg 22. The review is to the Minister and the regulations require that review be sought within three months and that grounds be stated. There is no guarantee that Ministerial review will substitute the decision, and applicants should consider parallel administrative law options if procedural fairness issues arise.
Interplay with other Acts. Urban and rural project requirements expressly reference the Land Titles Act 1980 and Local Government (Building and Miscellaneous Provisions) Act 1993, regs 10(4)(b)-(c). Candidates must be conversant with those Acts and their plan forms and registration procedures. Failure to meet statutory plan requirements may affect whether a project is accepted for examination.
In sum, the practical risks are concentrated on discrete procedures, documentation and technical standards, and on substantive discretion exercised by the institute and Surveyor-General. Candidates and their supervisors should manage records, confirm form requirements with the institute, anticipate audits, and plan examinations to avoid expiry of passes.