TASIn ForceAct
Strategic Infrastructure Corridors (Strategic and Recreational Use) Act 2016
7Amendment of corridor notice or CPR plan
Start here
Get a plain-English read of 7
Turn the raw legal text into a practical explanation grounded in Strategic Infrastructure Corridors (Strategic and Recreational Use) Act 2016.
### 7 Amendment of corridor notice or CPR plan
> > (1) The Minister, by notice, may –
> >
> > > > (a) amend a corridor notice by changing the name of the corridor; or
> > >
> > > > (b) amend a corridor notice so as to alter the area of land within a corridor.
>
> > (2) A notice under [subsection (1)](#GS7@Gs1@EN) is to specify a day, after the date of the notice, on which the notice is to come into effect.
>
> > (3) The Minister may, in a notice under [subsection (1)(b)](#GS7@Gs1@Hpb@EN) , amend a corridor notice so as to alter the area of land within a corridor by substituting, for the reference, in accordance with [section 6(6)(b)](#GS6@Gs6@Hpb@EN) , to the CPR plan (the ***original plan***) in the corridor notice, a reference to another CPR plan (the ***substituted plan***).
>
> > (4) For the purposes of [subsection (3)](#GS7@Gs3@EN) , a reference to a substituted plan may consist of a reference to –
> >
> > > > (a) another CPR plan with a different CPR number from the CPR number of the original plan; or
> > >
> > > > (b) a CPR plan with the same CPR number as the CPR number of the original plan but with a revision number, or with a different revision number from the revision number of the original plan.
>
> > (5) If the area of land within a corridor is altered, by a notice under [subsection (1)](#GS7@Gs1@EN) , by –
> >
> > > > (a) excluding land from the area of land within the corridor – the land so excluded ceases to be land within a corridor on and from the day on which the notice takes effect; or
> > >
> > > > (b) including land in the area of land within a corridor – the land so included becomes land within the corridor on and from the day on which the notice takes effect.
>
> > (6) If the area of land within a corridor declared by a corridor notice is altered by virtue of a notice under [subsection (1)](#GS7@Gs1@EN) –
> >
> > > > (a) the alteration does not alter the effect of the operation of any provision in [Division 2](#HP2@HD2@EN) or [Part 6](#HP6@EN) that has taken effect, before the alteration, on the land that, before the alteration, was part of a corridor; but
> > >
> > > > (b) [Part 6](#HP6@EN) ceases to apply in relation to any application, referred to in [Part 6](#HP6@EN) , that is on foot at the time the corridor notice is altered in relation to land that has, by virtue of the notice under [subsection (1)](#GS8@Gs1@EN) , ceased to be land within a corridor.