TASIn ForceAct
Strategic Infrastructure Corridors (Strategic and Recreational Use) Act 2016
24Minister may cancel permission issued by corridor manager
Start here
Get a plain-English read of 24
Turn the raw legal text into a practical explanation grounded in Strategic Infrastructure Corridors (Strategic and Recreational Use) Act 2016.
### 24 Minister may cancel permission issued by corridor manager
> The Minister may cancel a corridor authorisation granted under this Act by a corridor manager in relation to a corridor if –
>
> > > (a) the Minister is of the opinion that –
> > >
> > > > > (i) the area of land, within the corridor, to which the authorisation relates is required for a reserved purpose; or
> > > >
> > > > > (ii) the continuance of the authorisation may prevent the attainment of the corridor safety and use objectives; or
> > > >
> > > > > (iii) the holder of the authorisation has contravened a term or condition of the authorisation or has prevented the attainment of the corridor safety and use objectives; or
> >
> > > (b) the holder of the authorisation is using the land for any purpose other than the purpose for which the authorisation was granted.