Part 7 Proponent Charges
25. T24
Before applying to TasWater for a certificate of certifiable work in respect of water and sewerage works, the Proponent must provide TasWater with –
(a) details of the total sewerage flow at each point of connection; and
(b) details of the probable simultaneous water demand for the existing, and proposed, works; and
(c) the required fire flow rate in l/s and the required residual pressure in kPa at the point of connection (including losses through the actual connection, the associated pipework and the elevation changes); and
(d) calculation of equivalent tenements for the Project; and
(e) the relevant calculations for the proposal as well as the relevant calculations for determining credits to be applied to charges for the Project under condition T25.
26. T25
Before applying to TasWater for a certificate of certifiable work in respect of water and sewerage works, the applicant must pay charges, known as developer charges, in accordance with TasWater’s policy in respect of developer charges.
27. T26
If the Project is undertaken in stages in accordance with this order, TasWater may require the charges for the Project, under condition T25, to be paid –
(a) in respect of each stage for which the Proponent applies to TasWater for a certificate of certifiable work in respect of water and sewerage works; and
(b) commensurate with –
(i) the number of equivalent tenements in that stage of work; or
(ii) an equivalent methodology for determining the charges, as approved by the Regulator, within the meaning of the Economic Regulator Act 2009 .