Shire of Wyalkatchem Bush Fire Brigades Local Law 2022
Div 3Vehicle crossings
Start here
Get a plain-English read of Div 3
Turn the raw legal text into a practical explanation grounded in Shire of Wyalkatchem Bush Fire Brigades Local Law 2022.
Division 3—Vehicle crossings 8.8 Temporary crossings (1) Where it is likely that works on a lot will involve vehicles leaving a street and entering the lot, the person responsible for the works must obtain a permit for the construction of a temporary crossing to protect the existing carriageway, kerb, drains, footpath, existing materials and street trees, where— (a) a crossing does not exist; or (b) a crossing does exist, but the nature of the vehicles and their loads is such that they are likely to cause damage to the crossing. (2) The person responsible for the works in subclause (1) is to be taken to be— (a) the builder named on the building permit issued under the Building Act 2011, if one has been issued in relation to the works; or (b) the owner of the lot, if no building permit has been issued under the Building Act 2011 in relation to the works.