Shire of Northam Cat Local Law 2019
3830GOVERNMENT GAZETTE, WA 29 October 2019
Start here
Get a plain-English read of 3830
Turn the raw legal text into a practical explanation grounded in Shire of Northam Cat Local Law 2019.
3830 GOVERNMENT GAZETTE, WA 29 October 2019 (d) a minimum height of 1.8 metres up to 2.1 metres (including screening), except within the street setback area which is subject to requirements outlined in clause 3.1; and (e) certified by a Structural Engineer as being appropriate for the particular site and wind terrain category. SECOND SCHEDULE PERMIT FOR AN ELECTRIFIED FENCE [clause 5.3] This is to certify that..................................................................................................................................... of .................................................................................................................................................................... is the permit holder, subject to the conditions set out below, to have and use an electrified fence on ....................................................................................................................................................................... ....................................................................................................................................................................... (address) from ........................................................... 20............... and until this permit is transferred or cancelled. Dated this ….....….. day of ………..……....…….. 20........... Conditions of Permit The holder of the permit must— (a) display the permit in a prominent position on the land or premises on which the electrified fence has been constructed; (b) upon the request of the local government or an Authorised Person produce to him or her this permit; (c) within 14 days of a change in the ownership or occupation of the land or premises in respect of which the permit has been granted, notify the local government in writing of the details of that change or those changes; (d) obtain the written consent of the local government prior to the commencement of any alteration, addition or other work relating to or affecting the electrified fence; (e) comply with AS/NZS 3016:2002; and (f) following construction of the fence, lodge with Western Power a certificate of installation from a qualified electrician and comply with any requirements of Western Power regarding the construction of the fence. Transfer by endorsement This permit is transferred to ........................................................................................................................ ....................................................................................................................................................................... of .................................................................................................................................................................... ....................................................................................................................................................................... from and including the date of this endorsement. Dated this ….....….. day of ……..………....…….. 20........... THIRD SCHEDULE PERMIT FOR A RAZOR WIRE FENCE [clause 5.3] This is to certify that..................................................................................................................................... of .................................................................................................................................................................... is the permit holder, subject to the conditions set out below, to have a fence constructed wholly or partially of razor wire on .............................................................................................................................. ....................................... ……………………………………………………………………………………………... (address) from ............................................................ 20............... and until this permit is transferred or cancelled. Dated this ….....….. day of ……………......…….. 20...........