APPENDIX A APPENDIX A: CHECKLIST FOR SUPPORT VESSEL/
INSTALLATION OPERATIONS
Al SHIP
Weather conditions are suitable
Installation stopped in water or installation manager's agreement for operations under way obtained
All required propulsion, control, and back-up systems operational Master and crew are sufficiently rested
Deck crew are briefed and correctly dressed
Vessel's program has been advised/agreed Communications with the installation are working Internal communications on vessel are working Bulk transfer procedures have been agreed
Full details of cargo discussed/agreed
Notification has been given and received of any expected helicopter movements Required equipment ready for use
A2 . INSTALLATION
The required working zone alongside is clear of other vessels
Way taken off vessel for cargo operations or master's agreement for operations underway received.
Non critical overside discharges in the working zone have been stopped Standby vessel has been briefed on the operation
Installation personnel are sufficiently rested
Deck crew and crane driver are briefed Weather limitations have been considered Vessel's programme has been advised/agreed Crane limitations have been advised to Master
Permission given to offload or load during diving operations
Bulk transfer procedures have been agreed
Details of any expected delays/interruptions advised to the Master Full details of cargo discussed/agreed
Underwater/waterline obstructions which could cause a hazard to the vessel notified
Installation ready to commence operations
OIS/OIM/PIC (person in charge) identified by name to vessel master