Railway (Northern and Southern Urban Extensions) Act 1999
1Railway (Northern and Southern Urban Extensions) Act 1999
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in Railway (Northern and Southern Urban Extensions) Act 1999.
CrestWestern Australia
Railway (Northern and Southern Urban Extensions) Act 1999
Western Australia
Railway (Northern and Southern Urban Extensions) Act 1999
Contents
-
Short title 1
-
Commencement 2
-
Authority to construct railway (Currambine‑Butler) and for railway to deviate 2
-
Authority to construct railway (Jandakot‑Rockingham‑Mandurah) and for railway to deviate 2
Schedule 1 — Line of Currambine‑Butler Railway
Schedule 2 — Line of Jandakot‑Rockingham‑Mandurah Railway
Notes
Compilation table 5
Western Australia
Railway (Northern and Southern Urban Extensions) Act 1999
An Act to authorize the construction of a railway from Currambine to Butler to extend the Perth‑Joondalup Railway and a railway from Jandakot to Rockingham and from Rockingham to Mandurah.
The Parliament of Western Australia enacts as follows:
1. Short title
This Act may be cited as the Railway (Northern and Southern Urban Extensions) Act 1999.
2. Commencement
This Act comes into operation on the day on which it receives the Royal Assent.
3. Authority to construct railway (Currambine‑Butler) and for railway to deviate
(1) A railway, and all necessary, proper and usual works and facilities in connection with the railway, may be constructed and maintained along the line described in Schedule 1.
(2) Despite the deviation specified in section 96(1) of the Public Works Act 1902, the railway may deviate to a distance of 2 kilometres on either side of the line described in Schedule 1.
4. Authority to construct railway (Jandakot‑Rockingham‑Mandurah) and for railway to deviate
(1) A railway, and all necessary, proper and usual works and facilities in connection with the railway, may be constructed and maintained along the line described in Schedule 2.
(2) Despite the deviation specified in section 96(1) of the Public Works Act 1902, the railway may deviate to a distance of 4 kilometres on either side of the line described in Schedule 2.
Schedule 1 — Line of Currambine‑Butler Railway
[s.3]
The line of the railway commences at a point about 27.3 kilometres along the Perth to Joondalup railway line, as described in the Schedule to the Perth‑Joondalup Railway Act 1989, that is just south of Burns Beach Road, Currambine, and proceeds in a generally north‑westerly direction through a combined railway‑controlled access highway reserve for a distance of about 9 kilometres to a point, near Australian Map Grid coordinates 378350 East and 6498000 North, that is just north of Lukin Drive, Butler.