Rail Safety National Regulations (WA)
Sch 1ANotifiable occurrences
Start here
Get a plain-English read of Sch 1A
Turn the raw legal text into a practical explanation grounded in Rail Safety National Regulations (WA).
Schedule 1A — Notifiable occurrences
Part 1 — Category A notifiable occurrences
-
Collisions and near hits 73
-
Derailment 73
-
Wrong side failure 74
-
Proceed authority exceeded 74
-
Rolling stock runaway 74
-
Fire, explosion or dangerous goods spill 75
-
Breach of network rules or procedures 75
-
Load irregularity 75
-
Rolling stock irregularity (including monitoring systems) 76
-
Track irregularity 76
-
Civil infrastructure irregularity 76
-
Electrical traction irregularity 76
-
Incidents at person and train interfaces 76
-
Other incidents or accidents involving serious injury or fatality 77
-
Other incidents or accidents directly threatening rail safety 77
Part 2 — Category B notifiable occurrences
-
Collisions and near hits 78
-
Derailment 78
-
Proceed authority exceeded 78
-
Rolling stock runaway 79
-
Fire, explosion or spill of dangerous goods 79
-
Breach of network rules or procedures 79
-
Rolling stock irregularity (including monitoring systems) 80
-
Track irregularity 80
-
Other incidents or accidents involving serious injury or fatality 80
Part 3 — Category C notifiable occurrences
-
Collisions and near hits 81
-
Proceed authority exceeded 81
-
Rolling stock runaway 81
-
Breach of network rules or procedures 81
-
Load irregularity 82
-
Rolling stock irregularity (including monitoring systems) 82
-
Level crossing irregularity 82
-
Track irregularity 83
-
Civil infrastructure irregularity 83
-
Electrical traction irregularity 83