Radiocommunications (Unacceptable Levels of Interference – 850/900 MHz Band) Determination 2021
Schedule 1 Location of a transmitterSchedule 1 Location of a transmitter
Start here
Get a plain-English read of Schedule 1 Location of a transmitter
Turn the raw legal text into a practical explanation grounded in Radiocommunications (Unacceptable Levels of Interference – 850/900 MHz Band) Determination 2021.
Schedule 1 Location of a transmitter
(subsections 5(1), 8(3), 9(3) and section 11) 1. The location of a radiocommunications transmitter (lt, Lt) is the location (by latitude and longitude with reference to GDA94) of the phase centre of the radiocommunications transmitter’s antenna. 2. The location of a group of radiocommunications transmitters (lt, Lt) is the location (by latitude and longitude with reference to the GDA94) of the centre point between the phase centre of each radiocommunications transmitter antenna within the group. 3. In determining the location of a radiocommunications transmitter, or a group of radiocommunications transmitters, the measurement error should be less than 10 metres.
Note 1: The ACMA issues site identifiers for established radiocommunications locations available in the Register.
Note 2: The ACMA provides advice to assist licensees in determining the location and measurement error of a transmitter site in the document Business Operating Procedure (BOP) – Radiocommunications site data requirements, available, free of charge, on the ACMA’s website at www.acma.gov.au.