Radiocommunications (Spectrum Licence Allocation – 850/900 MHz Band) Determination 2021
33Provisional start demand validity rules for application
Start here
Get a plain-English read of 33
Turn the raw legal text into a practical explanation grounded in Radiocommunications (Spectrum Licence Allocation – 850/900 MHz Band) Determination 2021.
33 Provisional start demand validity rules for application
For the purposes of the following:
(a) subparagraph 31(7)(a)(i);
(b) paragraph 38(7)(a);
(c) paragraph 46(2)(a);
(d) subparagraph 48(4)(a)(i);
a provisional start demand of an applicant, for lots of a product, is valid if both the following apply in relation to the provisional start demand:
(e) the total size of the sum of:
(i) the provisional start demand of the applicant for the lots of the product (the relevant product); and
(ii) if the relevant product is a major population product – the sum of the provisional start demands of the applicant for lots of each other major population product; and
(iii) if the relevant product is a regional product – the sum of the provisional start demands of the applicant for lots of each other regional lot; and
(iv) if the relevant product is a major population product and the applicant is a set-aside participant – 1 set-aside lot of the 900 upper major population product; and
(v) if the relevant product is a regional product and the applicant is a set-aside participant – 1 set-aside lot of the 900 upper regional product;
does not exceed the applicant’s allocation limits (when expressed in MHz); and
(f) the number of lots for the applicant’s provisional start demand for the product is not greater than the number of lots for the supply of the product.
Note 2: For the 900 upper products, supply depends upon whether one or more set-aside applicants have elected to take up set-aside lots.