Radiocommunications (Spectrum Licence Allocation—3.4/3.7 GHz Bands) Determination 2023
79Recalculation of eligibility points
Start here
Get a plain-English read of 79
Turn the raw legal text into a practical explanation grounded in Radiocommunications (Spectrum Licence Allocation—3.4/3.7 GHz Bands) Determination 2023.
79 Recalculation of eligibility points
(1) This section applies in relation to a bidder who is the primary winner or secondary winner for a lot of a product in the 3.7 GHz auction.
(2) After the end of the 3.7 GHz auction, the ACMA must calculate the bidder’s eligibility points as at the time immediately before the start of the 3.4 GHz auction (see item 4 of the table in section 104).
(3) At least 3 working days before the start of the pre‑bidding round of the primary stage of the 3.4 GHz auction, the ACMA must notify the bidder of the number of eligibility points calculated.