Protection of the Environment Operations (Hunter River Salinity Trading Scheme) Regulation 2002
49DEffect of contravention of assignment rules on volume discharge limit
Start here
Get a plain-English read of 49D
Turn the raw legal text into a practical explanation grounded in Protection of the Environment Operations (Hunter River Salinity Trading Scheme) Regulation 2002.
49D Effect of contravention of assignment rules on volume discharge limit
49D Effect of contravention of assignment rules on volume discharge limit
(1) If a credit is assigned, in respect of a block, to an authorised discharge point in contravention of this Part, the credit is to be excluded from the calculation of the volume discharge limit for the authorised discharge point in respect of that block.
(2) Subclause (1) applies even if the assignment of the credit is entered in the Credit Register.
Note—
A contravention of the provisions of this Regulation may also result in an enforcement or forfeiture order being made against a person under Part 8.
pt 4A (cll 49A–49D): Ins 2016 (775), Sch 1 [41].