sec.56Failure of public sector entity to decide application
Start here
Get a plain-English read of sec.56
Turn the raw legal text into a practical explanation grounded in Plumbing and Drainage Regulation 2019.
sec.56 Failure of public sector entity to decide application
If the public sector entity does not decide the application within the required period, the entity is taken to have decided to refer the application to the local government. In this section— required period means the following period after receiving the application— 10 business days; if a longer period is agreed between the public sector entity and the applicant—the longer period. (sec.56-ssec.1) If the public sector entity does not decide the application within the required period, the entity is taken to have decided to refer the application to the local government. (sec.56-ssec.2) In this section— required period means the following period after receiving the application— 10 business days; if a longer period is agreed between the public sector entity and the applicant—the longer period.
- (a) 10 business days;
- (b) if a longer period is agreed between the public sector entity and the applicant—the longer period.