NSWIn ForceRegulation
Plantations and Reafforestation (Code) Regulation 2001
61Cessation of operations on log dump or landing
Start here
Get a plain-English read of 61
Turn the raw legal text into a practical explanation grounded in Plantations and Reafforestation (Code) Regulation 2001.
61 Cessation of operations on log dump or landing
61 Cessation of operations on log dump or landing
If operations on a log dump or log landing are not carried out for more than two weeks at a time, measures to minimise and control soil erosion must be implemented as soon as is reasonably practicable.