QLDIn ForceRegulation
Planning Regulation 2017
sch.6-sec.20COperational work relating to pumped hydro energy storage
Start here
Get a plain-English read of sch.6-sec.20C
Turn the raw legal text into a practical explanation grounded in Planning Regulation 2017.
sch.6-sec.20C Operational work relating to pumped hydro energy storage
Operational work that is constructing or raising waterway barrier works on premises if— the premises are used for pumped hydro energy storage; and the waterway barrier works form, or will form, part of other infrastructure on the premises. sch 6 s 20C ins 2025 SL No. 149 s 19
- (a) the premises are used for pumped hydro energy storage; and
- (b) the waterway barrier works form, or will form, part of other infrastructure on the premises.