sch.6-sec.20 Operational work on off-road motorcycling facility land
Operational work that is filling or excavating, or for a dam or earth bank, if— the work is carried out on off-road motorcycling facility land; and the work relates to an off-road motorcycling facility; and work carried out for the construction of the facility work relating to the operation of the facility, including the construction or maintenance of fire breaks, recreational trails, roads, tracks, viewing mounds or water storage facilities the work does not— increase the risk of flooding on the premises or other premises; or result in contamination of, or interfere with water flows into, any surface water or groundwater; and the work involves measures, identified in an erosion and sediment control plan under section 5 (1) (g) (iii) , for minimising erosion and sediment run-off impacts on the premises caused by the work; and land on which filling or excavating is carried out is stabilised after the work is completed.
- (a) the work is carried out on off-road motorcycling facility land; and
- (b) the work relates to an off-road motorcycling facility; and Examples of work relating to an off-road motorcycling facility— • work carried out for the construction of the facility • work relating to the operation of the facility, including the construction or maintenance of fire breaks, recreational trails, roads, tracks, viewing mounds or water storage facilities
- • work carried out for the construction of the facility
- • work relating to the operation of the facility, including the construction or maintenance of fire breaks, recreational trails, roads, tracks, viewing mounds or water storage facilities
- (c) the work does not— (i) increase the risk of flooding on the premises or other premises; or (ii) result in contamination of, or interfere with water flows into, any surface water or groundwater; and
- (i) increase the risk of flooding on the premises or other premises; or
- (ii) result in contamination of, or interfere with water flows into, any surface water or groundwater; and
- (d) the work involves measures, identified in an erosion and sediment control plan under section 5 (1) (g) (iii) , for minimising erosion and sediment run-off impacts on the premises caused by the work; and
- (e) land on which filling or excavating is carried out is stabilised after the work is completed.
- • work carried out for the construction of the facility
- • work relating to the operation of the facility, including the construction or maintenance of fire breaks, recreational trails, roads, tracks, viewing mounds or water storage facilities
- (i) increase the risk of flooding on the premises or other premises; or