Planning Regulation 2017
sch.10-sec.3BProhibited development—particular development in Caboolture West growth area
Start here
Get a plain-English read of sch.10-sec.3B
Turn the raw legal text into a practical explanation grounded in Planning Regulation 2017.
sch.10-sec.3B Prohibited development—particular development in Caboolture West growth area
Development on a State school site in the Caboolture West growth area is prohibited development. However, subsection (1) does not apply to the extent the development— is for a State school under the Education (General Provisions) Act 2006 ; or is operational work that is— filling or excavating, including, for example, bulk earthworks; or extracting gravel, rock, sand or soil; or the clearing of vegetation; or for a stormwater drain; or for road transport infrastructure; or for street lighting, a transmission grid or a supply network; or landscaping; or is operational work required under a water approval under the SEQ Water Act ; or is for reconfiguring a lot that includes all or part of a State school site and the reconfiguration does not result in land within the State school site being reconfigured in a way mentioned in schedule 2 of the Act , definition reconfiguring a lot , paragraph (a) , (d) or (e) ; or is Waraba PDA-related development. In this section— Waraba PDA-related development — means development in the Waraba priority development area or PDA-associated development for the Waraba priority development area; but does not include development the subject of an application properly made before the Waraba priority development area was declared. sch 10 s 3B ins 2023 SL No. 13 s 5 amd 2024 SL No. 138 s 7 (sch.10-sec.3B-ssec.1) Development on a State school site in the Caboolture West growth area is prohibited development. (sch.10-sec.3B-ssec.2) However, subsection (1) does not apply to the extent the development— is for a State school under the Education (General Provisions) Act 2006 ; or is operational work that is— filling or excavating, including, for example, bulk earthworks; or extracting gravel, rock, sand or soil; or the clearing of vegetation; or for a stormwater drain; or for road transport infrastructure; or for street lighting, a transmission grid or a supply network; or landscaping; or is operational work required under a water approval under the SEQ Water Act ; or is for reconfiguring a lot that includes all or part of a State school site and the reconfiguration does not result in land within the State school site being reconfigured in a way mentioned in schedule 2 of the Act , definition reconfiguring a lot , paragraph (a) , (d) or (e) ; or is Waraba PDA-related development. (sch.10-sec.3B-ssec.3) In this section— Waraba PDA-related development — means development in the Waraba priority development area or PDA-associated development for the Waraba priority development area; but does not include development the subject of an application properly made before the Waraba priority development area was declared.
- (a) is for a State school under the Education (General Provisions) Act 2006 ; or
- (b) is operational work that is— (i) filling or excavating, including, for example, bulk earthworks; or (ii) extracting gravel, rock, sand or soil; or (iii) the clearing of vegetation; or (iv) for a stormwater drain; or (v) for road transport infrastructure; or (vi) for street lighting, a transmission grid or a supply network; or (vii) landscaping; or