Mechanically, the Pittwater Local Environmental Plan 2014 sets zoning, maps, permitted/prohibited uses, consent rules and development standards (height, floor‑space, lot sizes, overlays) that control what can be built or used on land in Pittwater. It affects landowners and developers (who bear assessment, mitigation and contribution costs), the Council (the consent authority that decides and imposes conditions: cl 1.6, 2.3) and State agencies (through SEPP and Act cross‑references: cl 1.9).
This instrument is a local environmental plan (the Plan) that sets land use zones, permitted uses, development standards and local provisions for the Pittwater area. It organises land by maps (Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Urban Release Area Map, Coastal Risk Planning Map, Biodiversity Map and others) and prescribes what may be carried out with or without development consent, what is prohibited, and the planning controls and local procedures that apply to proposals (see cl 1.7; cl 2.1-2.3; cl 2.2; cl 4.1; cl 4.3; cl 4.4).
Mechanically, the Plan does the following:
Zoning and permitted uses: defines multiple zones (residential, rural, employment, mixed use, conservation, waterway, recreation and special purpose zones) and a Land Use Table that specifies for each zone the objectives, development that may be carried out without consent, development that may be carried out only with consent and prohibited development (cl 2.1; cl 2.3; Land Use Table).
Consent framework and decision-maker: names the Council as the consent authority (cl 1.6) and sets the matters and thresholds the consent authority must consider when deciding applications (for example heritage, flood risk, biodiversity and geotechnical risks , cl 5.10; cl 5.21; cl 7.6; cl 7.7).
Development standards: fixes principal development standards such as minimum lot sizes and subdivision rules (cl 4.1; cl 4.1AA; cl 4.1B), height limits (cl 4.3), floor space ratio (cl 4.4), and density caps for particular residential forms (cl 4.5A). It also contains an exceptions rule permitting the consent authority to approve variations where environmental planning grounds exist (cl 4.6).
Exempt and complying development: identifies exempt and complying development in Schedules 2 and 3, and excludes environmentally sensitive areas from those pathways (cl 3.1-3.3; Schedule 2; Schedule 3).
Current sections
Direct links to the current provisions in Pittwater Local Environmental Plan 2014.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2017 (493), Sch 1.1 [1] [2]; 2018 (488), Sch 1.1 [1]; 2019 (621), Sch 3; 2022 (830), Sch 1.20[4]–[6]; 2023 (539), Sch 1.1.
Zone RU2 Rural Landscape
Zone R2 Low Density Residential
Zone R3 Medium Density Residential
Zone R5 Large Lot Residential
Zone E1 Local Centre
Zone E3 Productivity Support
Zone E4 General Industrial
Zone MU1 Mixed Use
Zone SP1 Special Activities
Zone SP2 Infrastructure
Zone SP3 Tourist
Zone SP4 Enterprise
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone C2 Environmental Conservation
Zone C3 Environmental Management
Zone C4 Environmental Living
Zone W1 Natural Waterways
Zone W2 Recreational Waterways
Zone W4 Working Waterfront
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agriculture; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Building identification signs; Business identification signs; Centre-based child care facilities; Community facilities; Dual occupancies (attached); Dwelling houses; Environmental facilities; Environmental protection works; Farm buildings; Farm stay accommodation; Forestry; Function centres; Home-based child care; Home industries; Industrial retail outlets; Industrial training facilities; Information and education facilities; Landscaping material supplies; Places of public worship; Plant nurseries; Recreation areas; Respite day care centres; Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Veterinary hospitals
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone SP2 Infrastructure and marked “Local road” | Council |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone C2 Environmental Conservation and marked “Local open space” | Council |
| Zone C2 Environmental Conservation and marked “Regional open space” | The corporation constituted under section 8 of the Act |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
cl 5.1: Am 2022 (830), Sch 1.20[10].
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Warriewood Valley Release Area
6 Warriewood Valley Release Area
6.1 Warriewood Valley Release Area
(1) The objectives of this clause are as follows—
(a) to permit development in the Warriewood Valley Release Area in accordance with the Warriewood Valley Strategic Review Report and the Warriewood Valley Strategic Review Addendum Report,
(b) to ensure that development in that area does not adversely impact on waterways and creek line corridors, protects existing native riparian vegetation and rehabilitates the creek line corridors.
(c) (Repealed)
(2) This clause applies to the land in the Warriewood Valley Release Area.
(3) Development consent must not be granted for development on land in a buffer area or sector or at an address mentioned in Column 1 of the table to this clause unless the consent authority is satisfied that the total number of dwellings shown opposite that buffer area, sector or address in Column 2 of that table will be erected.
| Column 1 | Column 2 |
| Buffer area, sector or address | Number of dwellings to be erected |
| Sector 1 | Not more than 209 dwellings or less than 195 dwellings |
| Sector 101 | Not more than 4 dwellings |
| Sector 2 | Not more than 54 dwellings or less than 49 dwellings |
| Sector 301 | Not more than 53 dwellings or less than 42 dwellings |
| Sector 302 | Not more than 84 dwellings or less than 66 dwellings |
| Sector 303 | Not more than 29 dwellings or less than 23 dwellings |
| Sector 5 | Not more than 94 dwellings or less than 75 dwellings |
| Sector 8 | Not more than 140 dwellings |
| Sector 801 | Not more than 38 dwellings or less than 19 dwellings |
| Sector 901A | Not more than 190 dwellings or less than 154 dwellings |
| Sector 901B | Not more than 36 dwellings or less than 12 dwellings |
| Sectors 901C, 901G and 9 Fern Creek Road | Not more than 33 dwellings or less than 26 dwellings |
| Sectors 901D and 901E | Not more than 16 dwellings |
| Sector 901F | Not more than 14 dwellings |
| Sector 901H | Not more than 3 dwellings |
| Sector 10 | Not more than 134 dwellings |
| Sector 10B | Not more than 45 dwellings or less than 28 dwellings |
| Sector 10C | Not more than 17 dwellings |
| Sector 11 | Not more than 163 dwellings or less than 147 dwellings |
| Sector 12 | Not more than 180 dwellings or less than 163 dwellings |
| Sector 12A | Not more than 19 dwellings |
| Sector 20 | Not more than 64 dwellings |
| Sector 202 | Not more than 1 dwelling |
| Sector 203 | Not more than 4 dwellings |
| Buffer area 1a | Not more than 17 dwellings or less than 15 dwellings |
| Buffer area 1b | Not more than 24 dwellings or less than 17 dwellings |
| Buffer area 1c | Not more than 18 dwellings or less than 13 dwellings |
| Buffer area 1d | Not more than 1 dwelling |
| Buffer area 1e | Not more than 15 dwellings or less than 11 dwellings |
| Buffer area 1f | Not more than 21 dwellings or less than 14 dwellings |
| Buffer area 1g | Not more than 23 dwellings or less than 17 dwellings |
| Buffer area 1h | Not more than 1 dwelling |
| Buffer area 1i | Not more than 39 dwellings or less than 27 dwellings |
| Buffer area 1j | Not more than 40 dwellings or less than 26 dwellings |
| Buffer area 1k | Not more than 21 dwellings or less than 14 dwellings |
| Buffer area 1l | Not more than 67 dwellings or less than 43 dwellings |
| Buffer area 1m | Not more than 22 dwellings |
| Buffer area 2 | Not more than 147 dwellings |
| Buffer area 2a | Not more than 29 dwellings or less than 20 dwellings |
| Buffer area 3a | Not more than 186 dwellings |
| Buffer area 3b | Not more than 9 dwellings or less than 7 dwellings |
(4) Development consent must not be granted for development on land to which this clause applies unless the consent authority is satisfied that the proposed development will not have any significant adverse impact on any of the following—
(a) opportunities for rehabilitation of aquatic and riparian vegetation, habitats and ecosystems within creek line corridors,
(b) the water quality and flows within creek line corridors,
(c) the stability of the bed, shore, and banks of any watercourse within creek line corridors.
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
(a) 24 Barrenjoey Road, Mona Vale, being Lot 11, DP 619503,
(b) 38 Barrenjoey Road, Mona Vale, being Lot 7, DP 29305,
(c) 1509 Pittwater Road, North Narrabeen, being Lot 567, DP 813147.
(2) Development for the purpose of a service station is permitted with development consent on each lot.
9
Use of certain land at 9 The Esplanade, Mona Vale
9 Use of certain land at 9 The Esplanade, Mona Vale
9 Use of certain land at 9 The Esplanade, Mona Vale
(1) This clause applies to land at 9 The Esplanade, Mona Vale, being Lot 10, DP 730056 and identified as “Area 8” on the Additional Permitted Uses Map.
(2) Development for the purpose of a marina is permitted with development consent.
10
Use of certain land at 2 Mona Street, Mona Vale
10 Use of certain land at 2 Mona Street, Mona Vale
10 Use of certain land at 2 Mona Street, Mona Vale
(1) This clause applies to land at 2 Mona Street, Mona Vale, and identified as “Area 10” on the Additional Permitted Uses Map.
(2) Development for purposes of community facilities, depots and emergency services facilities is permitted with development consent.
11
Use of certain land at 80–82 and 84 Mona Vale Road, Mona Vale and 22 Jubilee Avenue, Warriewood
11 Use of certain land at 80–82 and 84 Mona Vale Road, Mona Vale and 22 Jubilee Avenue, Warriewood
11 Use of certain land at 80–82 and 84 Mona Vale Road, Mona Vale and 22 Jubilee Avenue, Warriewood
(a) 80–82 Mona Vale Road, Mona Vale, being Lot 26, DP 654262,
(b) 84 Mona Vale Road, Mona Vale, being Lot 120, DP 135512,
(c) 22 Jubilee Avenue, Warriewood, being Lot 27, DP 5055.
(2) Development for the purpose of a registered club is permitted with development consent.
12
Use of certain land at Kitchener Park, Pittwater Road, Mona Vale
12 Use of certain land at Kitchener Park, Pittwater Road, Mona Vale
12 Use of certain land at Kitchener Park, Pittwater Road, Mona Vale
(1) This clause applies to land at Kitchener Park, Pittwater Road, Mona Vale, identified as “Area 12” on the Additional Permitted Uses Map.
(2) Development for purposes of shops is permitted with development consent if the shops are associated with a skate park facility and if the total gross floor area of all shops does not exceed 200 square metres.
(2) Development for purpose of a shop, being specifically for the sale, hire or storage of goods associated with the use of, or used in the construction, repair and maintenance of watercraft, used or capable of being used as a means of transportation on water is permitted with development consent.
14
Use of certain land at 122 and 124 Crescent Road, Newport
14 Use of certain land at 122 and 124 Crescent Road, Newport
14 Use of certain land at 122 and 124 Crescent Road, Newport
(1) This clause applies to land at 122 and 124 Crescent Road, Newport, being Lots 111 and 112, DP 556902 and identified as “Area 15” on the Additional Permitted Uses Map.
(2) Development for the purposes of a boat building and repair facility, a charter and tourism boating facility and a marina is permitted with development consent.
15
Use of certain land at 4 and 6 Crystal Street, and 7 Mitala Street, Newport
15 Use of certain land at 4 and 6 Crystal Street, and 7 Mitala Street, Newport
15 Use of certain land at 4 and 6 Crystal Street, and 7 Mitala Street, Newport
(2) Development for the purposes of attached dwellings, multi dwelling housing, residential flat buildings, semi-detached dwellings or seniors housing is permitted with development consent.
17
Use of certain land at 1017 Barrenjoey Road, Palm Beach
17 Use of certain land at 1017 Barrenjoey Road, Palm Beach
17 Use of certain land at 1017 Barrenjoey Road, Palm Beach
(2) Development for the purposes of boat building and repair facilities or business premises (but only those associated with use of the waterway), is permitted with development consent.
18
Use of certain land at 1151 Barrenjoey Road, Palm Beach
18 Use of certain land at 1151 Barrenjoey Road, Palm Beach
18 Use of certain land at 1151 Barrenjoey Road, Palm Beach
(1) This clause applies to land—
(a) at 1151 Barrenjoey Road, Palm Beach, being Lot 10A, DP 13374 and identified as “Area 18” on the Additional Permitted Uses Map, and
(b) that is subject to PO 1957/170.
(2) Development for the purpose of boat building and repair facilities is permitted with development consent.
19
Use of certain land at 1191 Barrenjoey Road, Palm Beach
19 Use of certain land at 1191 Barrenjoey Road, Palm Beach
19 Use of certain land at 1191 Barrenjoey Road, Palm Beach
(1) This clause applies to 1191 and 1193 Barrenjoey Road, Palm Beach, being Lot 298, DP 721572 and Lot 7005, DP 1117451 and identified as “Area 19” on the Additional Permitted Uses Map.
(2) Development for the purposes of business premises (but only those associated with use of the waterway), charter and tourism boating facilities, kiosks or restaurants or cafes is permitted with development consent.
20
Use of certain land at 23B Macpherson Street, Warriewood
20 Use of certain land at 23B Macpherson Street, Warriewood
20 Use of certain land at 23B Macpherson Street, Warriewood
(1) This clause applies to land at 23B Macpherson Street, Warriewood, being Lot 11, Section C, DP 5464 and identified as “Area 20” on the Additional Permitted Uses Map.
(2) Development for purposes of restaurants or cafes is permitted with development consent.
(3) Development for purposes of neighbourhood shops is permitted with development consent if the gross floor area of any development on the site does not exceed 2,222 m2 and if the gross floor area of any individual neighbourhood shop does not exceed 800 m2.
21
Use of certain land at 4 Vuko Place, Warriewood
21 Use of certain land at 4 Vuko Place, Warriewood
21 Use of certain land at 4 Vuko Place, Warriewood
(1) This clause applies to land at 4 Vuko Place, Warriewood, being Lot 2, DP 737137 and identified as “Area 21” on the Additional Permitted Uses Map.
(2) Development for the purpose of entertainment facilities is permitted with development consent.
22
Use of certain land in Zone RE1 Public Recreation
22 Use of certain land in Zone RE1 Public Recreation
22 Use of certain land in Zone RE1 Public Recreation
(2) Development for the purposes of boat sheds, jetties or water recreation structures is permitted with development consent.
24
Use of certain land in Zone SP2 Infrastructure intended to be acquired for public purposes
24 Use of certain land in Zone SP2 Infrastructure intended to be acquired for public purposes
24 Use of certain land in Zone SP2 Infrastructure intended to be acquired for public purposes
(1) This clause applies to land in Zone SP2 Infrastructure and marked “Classified road” and identified as “Area 24” on the Additional Permitted Uses Map.
(2) Development for the purposes of enabling access to a dwelling house is permitted with development consent, but only if the consent authority has considered the following—
(a) the effect of the proposed development on the costs of acquisition of the land,
(b) the imminence of the acquisition,
(c) the costs associated with the reinstatement of the land for the purposes for which it is to be acquired.
25
Development on land at 6 Mitchell Road, Palm Beach
25 Development on land at 6 Mitchell Road, Palm Beach
25 Development on land at 6 Mitchell Road, Palm Beach
(1) This clause applies to land—
(a) identified as “Area 25” on the Additional Permitted Uses Map, and
(b) in Zone RE1.
(2) Development for the purposes of dwelling houses is permitted with development consent if the consent authority is satisfied that the dwelling house will not exceed RL 74.5m.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2021 (175), Sch 2.8[1].
sch.2-sec
Minor alterations to existing lawful jetties, water recreation structures and wharf or boating facilities
sch.2-sec Minor alterations to existing lawful jetties, water recreation structures and wharf or boating facilities
Minor alterations to existing lawful jetties, water recreation structures and wharf or boating facilities
(1) The following works to existing lawful jetties, water recreation structures and wharf or boating facilities, if the works are not carried out on or in a heritage item or a draft heritage item, and if the works comply with the standards specified in this clause—
(a) the repair or replacement of the following—
(i) decking on a boardwalk, gangway, ramp, jetty, landing or landing steps, pontoon, stairs, steps, skids or wharf,
(ii) a handrail or ladder,
(iii) the rails of a slipway,
(iv) a winch,
(v) non-load bearing members,
(b) the installation of emergency items such as lifebuoys and any associated signage,
(c) painting or other similarly applied surface treatment that is intended to protect a structure from corrosion or weathering,
(d) demolition of a structure.
(2) The standards specified for that development are that the development—
(a) in the case of development for the repair or replacement of non-load bearing members—
(i) must use members of like dimension to the members being repaired or replaced, and
(ii) must not modify the footprint for the structure concerned, and
(iii) must use materials that are equivalent to or better than the quality of the materials being repaired or replaced, and
(b) in the case of demolition, must be carried out in accordance with AS 2601—2001, The demolition of structures, and
(c) must not reduce the amount of light penetration to any water below, and
(d) must not increase the footprint of any building or structure or change its classification under the Building Code of Australia, and
(e) must not involve disturbance of or injury to any waterway or any sea grass, and
(f) must not include a change to the fire resisting components of, or interfere with the entry to or exit from, or the fire safety measures contained within, any building, and
(g) must be consistent with the terms of any applicable development consent.
This Plan is Pittwater Local Environmental Plan 2014.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences 28 days after it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Pittwater in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to promote development in Pittwater that is economically, environmentally and socially sustainable,
(b) to ensure development is consistent with the desired character of Pittwater’s localities,
(c) to support a range of mixed-use centres that adequately provide for the needs of the Pittwater community,
(d) to retain and enhance land used for employment purposes that is needed to meet the economic and employment needs of the community both now and in the future,
(e) to improve access throughout Pittwater, facilitate the use of public transport and encourage walking and cycling,
(f) to encourage a range of housing in appropriate locations that provides for the needs of the community both now and in the future,
(g) to protect and enhance Pittwater’s natural environment and recreation areas,
(h) to conserve Pittwater’s European and Aboriginal heritage,
(i) to minimise risks to the community in areas subject to environmental hazards including climate change,
Local matters and specialist requirements: prescribes local controls , heritage consent requirements and procedures (cl 5.10 and Schedule 5), acid sulfate soils management (cl 7.1), earthworks (cl 7.2), coastal risk and flood planning (cl 7.5; cl 5.21; cl 5.22), biodiversity assessment (cl 7.6), foreshore controls (cl 7.8), public bushland protections (cl 5.23), and aquaculture controls (cl 5.19 and Schedule 6).
Site-specific provisions: contains schedule-based additional permitted uses and site-by-site controls (Schedule 1), urban release area rules (Warriewood Valley, cl 6.1-6.2), and permissibility and development sequencing conditions (cl 6.1(3)).
Interaction with other instruments and authorities: declares the Plan subject to state environmental planning policies that prevail (cl 1.9) and defines situations in which registered covenants cease to apply to enable development consistent with the Plan, subject to specified exceptions (cl 1.9A).
The Plan therefore allocates decision rights to the Council, sets substantive constraints and exceptions on private development activity, and creates a mix of map-driven standards and subject-specific procedural requirements. It also embeds multiple cross-references to other NSW legislation and guidance (for example the Act, the Flood Risk Management Manual and the Considering Flooding in Land Use Planning Guideline) to determine technical expectations and required studies (cl 1.1; cl 4.3(2G); cl 5.21(4)-(5)).
Main concepts
The Plan’s architecture is map-and-schedule driven. Maps determine zoning, lot-size minima, heights, coastal risk and other spatially-variable controls (cl 1.7; cl 2.2; cl 4.1; cl 4.3). Schedules specify exempt/compliant development, additional permitted uses for particular lots, heritage listings, and local technical standards (Schedules 1-6). Several recurrent concepts structure decision-making and compliance.
Zoning and the Land Use Table. Zoning divides the area into RU, R, E, MU, SP, RE, C and W zones and assigns permissible uses (cl 2.1; Land Use Table). The consent authority must have regard to zone objectives when deciding applications (cl 2.3(2)). The Land Use Table governs whether a use requires consent, is permitted without consent, or is prohibited (cl 2.3(1)).
Consent vs exempt/compliant pathways. The Plan distinguishes three procedural routes: development with consent, exempt development (Schedule 2) and complying development (Schedule 3). Exempt/compliant categories are limited by standards and excluded from environmentally sensitive areas (cl 3.1-3.3). Even where a use is “permitted without consent” it may still be subject to State-level Part 5 approvals or other licences,Schedule notes emphasise that other Acts may still require approvals (Notes to Schedule 2).
Development standards and flexibility. Numeric and spatial standards include minimum lot sizes (cl 4.1 and cl 4.1AA), building heights (cl 4.3), floor space ratios (cl 4.4) and density caps for specific residential forms (cl 4.5A). Clause 4.6 allows the consent authority to approve contraventions of development standards if the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds, and requires a written record of the assessment (cl 4.6(2)-(4)). Clause 4.6 however excludes some standards from flexibility, for example BASIX-related standards, complying development standards and certain subdivision minima in specified zones (cl 4.6(6) and (8)).
Risk-based, site-specific controls. The Plan embeds additional local triggers that require technical studies or restrictions: acid sulfate soils (cl 7.1 requires an acid sulfate soils management plan when works are proposed on mapped classes), geotechnical hazards (cl 7.7 requires consideration of construction and drainage methods), biodiversity (cl 7.6 requires assessment of ecological impacts), flood and coastal risk (cl 5.21 and cl 7.5 require compatibility with flood function, evacuation and sea level rise, and reference relevant guidelines), and heritage (cl 5.10 sets out notification, heritage management documents and a power to require a conservation management plan).
Spatial sequencing and capped development. The Warriewood Valley Release Area clause imposes dwelling caps for sectors and buffers and requires that consents in those sectors comply with dwelling totals and protect creek rehabilitation outcomes (cl 6.1(3)-(4)). Clause 6.2 requires site-specific development control plans before some development can proceed.
Rights and extinguishments. Clause 1.9A suspends private covenants and similar instruments to the extent necessary to enable development consistent with the Plan, except where the covenant is required by the Council or certain environmental agreements. The clause preserves public authority interests in registered instruments and was subject to Governor’s approval under s 3.16 of the Act (cl 1.9A(1)-(4)).
Cross-agency referrals and consultation. Heritage matters require notification to the Heritage Council and consultation with local Aboriginal communities where Aboriginal places are affected (cl 5.10(7)-(9)). Urban release and infrastructure matters reference transport, water, and acquisition authorities (cl 5.1; cl 5.1A; cl 5.12).
In short, the Plan couples a rules-based zoning grid with a series of risk- and site-specific procedural gates. It creates the menu of permitted approaches and the evidence base the consent authority must rely on when exercising discretion.
Who it affects
The Plan’s provisions affect a range of actors and interests. Primary affected parties are landowners, developers and occupiers within the Pittwater area, but the mechanics reach other public bodies, utilities and third parties.
Landowners and prospective developers. Owners and proponents must identify zoning, lot size, height and FSR constraints on their land and determine whether a proposal is permitted with consent, permitted without consent, exempt or complying (cl 2.2; cl 2.3; cl 3.1-3.3; cl 4.1; cl 4.3; cl 4.4). Subdivision, demolition and certain other works require development consent (cl 2.6; cl 2.7). Specific land parcels have additional permitted uses in Schedule 1, and some lots have site-specific constraints such as residual-lot consolidation requirements for identified Church Point parcels (cl 7.9).
Consent authority and Council functions. The Plan names the Council as consent authority for the purposes of the Plan (cl 1.6). Council makes discretionary judgments on matters specified by the Plan and must consider objectives and specified matters (cl 2.3(2); cl 5.10; cl 5.21; cl 7.6; cl 7.7). Council also administers local schemes such as the Affordable Housing Contributions Scheme and may accept land dedications or monetary contributions for affordable housing under cl 7.14. Where the Plan allows owner-initiated acquisition, the Plan identifies the relevant State authority (cl 5.1).
State agencies and regulatory bodies. Several State policies and Acts intersect with the Plan. State environmental planning policies may prevail over the Plan (cl 1.9). Specified State authorities are the relevant acquisition authorities for different mapped public reservations (cl 5.1). Other agencies are involved in specialist approvals or oversight, including Fire and Rescue NSW via cl 5.8 (conversion of fire alarm monitoring), the Heritage Council for archaeological matters (cl 5.10(7), (9)), and the Department of Primary Industries for aquaculture planning (cl 5.19).
Local Aboriginal communities and heritage stakeholders. The Plan requires notification and consultation with local Aboriginal communities for development affecting Aboriginal places of heritage significance (cl 5.10(8)). Heritage-listed property owners are directly affected by procedural and substantive controls (cl 5.10; Schedule 5 lists heritage items and conservation areas).
Neighbours and the general public. The Plan contains public-interest constraints: public bushland and foreshore continuity are protected and public access is emphasised (cl 5.23; cl 7.8). Temporary uses are capped at 42 days in 12 months unless specifically exempted, which constrains short-term events and commercial activities (cl 2.8). Exempt and complying development pathways are limited in environmentally sensitive areas to protect public environmental values (cl 3.3).
Utilities and infrastructure providers. Many provisions affect utilities and public works: earthworks, pipelines and electricity/telecommunications maintenance on public bushland can be exempted from consent subject to limits (cl 5.23(4)-(5)). The Plan preserves the Crown’s ability to use buildings and transport/infrastructure State policies remain applicable (cl 5.12). Acquisition processes and costs are allocated via cl 5.1.
Financially affected parties. Developers face potential monetary and dedications obligations for affordable housing (cl 7.14), obligations to fund heritage conservation conditions where consent is conditioned on conservation work (cl 5.10(10)), expenses for technical studies (flood, geotechnical, biodiversity, acid sulfate soils), and possible infrastructure contributions implicit in development control plan requirements (cl 6.2). Owners of land intended to be acquired face restrictions limiting permissible development pending acquisition and consent authority scrutiny of access proposals (cl 5.1A; Schedule 1 area 24).
In sum, the Plan creates a system of mapped entitlement, procedural gates and specialist obligations that affect private landholders, Council as the decision-maker, relevant State agencies and local Aboriginal and environmental stakeholders. Those who plan or invest in land development must budget for mapping checks, consultant studies, potential contributions, and the Council’s discretionary assessment.
Key duties and rights
The Plan assigns a set of duties, checks and conditional rights to applicants, the consent authority, and specified public authorities. Below are the principal duties and rights extracted from the instrument.
Duty to determine and apply maps and zone objectives. Decision-makers must apply the maps adopted under the Plan and have regard to zone objectives when determining a development application (cl 1.7; cl 2.3(2)). Applicants have a duty to establish compliance with mapped limits (height, FSR, lot size) or justify departures under cl 4.6.
Duty to obtain development consent where required. Subdivision (cl 2.6), demolition (cl 2.7), development within specified mapped hazard areas (cl 5.21 and cl 5.22), and many other forms of development require development consent. Exempt and complying pathways exist but are constrained by standards and by exclusions for environmentally sensitive areas (cl 3.1-3.3; Schedule 2; Schedule 3).
Applicants’ obligation to provide technical documentation. Where technical constraints apply, applicants must supply the evidence needed for assessment. Examples include an acid sulfate soils management plan for works on mapped classes (cl 7.1(3)), heritage management documents or heritage conservation management plans (cl 5.10(5)-(6)), flood and evacuation analyses informed by the Considering Flooding guideline and Flood Risk Management Manual (cl 5.21(4)-(5)), and pond/ tank aquaculture design and operational compliance with Schedule 6 (cl 5.19; Schedule 6).
Duty to consult and notify. For archaeological sites and State heritage matters, the consent authority must notify the Heritage Council and consider responses (cl 5.10(7), (9)). For development in Aboriginal places of heritage significance, the consent authority must notify local Aboriginal communities and take responses into account (cl 5.10(8)). For owner-initiated acquisition matters, the Plan identifies the State authority and contemplates acquisition timing effects (cl 5.1).
Council’s duty and discretion. Council, as consent authority (cl 1.6), must assess applications against the Plan objectives and specified matters. Under cl 4.6 Council may approve departures from development standards if the applicant satisfies statutory tests and Council keeps a record of the assessment (cl 4.6(2)-(4)). Council’s duties include imposing conditions (e.g. affordable housing contributions under cl 7.14(3)-(6)), requiring DCPs under cl 6.2, and ensuring essential services are available or planned before consent is granted (cl 7.10).
Right to suspend private covenants for Plan-consistent development. Clause 1.9A suspends the effect of private agreements, covenants or similar instruments to the extent necessary to permit development that aligns with the Plan or a grant of consent, but explicitly excludes covenants imposed or required by the Council and certain environmental agreements and preserves public authority registered interests (cl 1.9A(1)-(3)). The Governor approved the clause under the Act (cl 1.9A(4)).
Statutory rights around exceptions to standards. Clause 4.6 grants a pathway to contravene development standards where compliance is unreasonable or unnecessary and the applicant can demonstrate environmental planning grounds. The consent authority must record its assessment (cl 4.6(2)-(4)). The clause excludes several "non-flexible" standards (cl 4.6(8)).
Rights to exempt and complying pathways, subject to exclusions. Developers benefit from exemptions and complying development listings in Schedules 2 and 3 where standards are met and those areas are not environmentally sensitive (cl 3.1-3.3). But where land is mapped as environmentally sensitive, those pathways are closed.
Rights and duties on affordable housing contributions. For land in the Affordable Housing Contribution Area, the Plan requires that a proportion of the gross floor area be used for affordable housing and permits Council to impose a condition requiring a 5 percent GFA contribution, satisfied by land dedication or monetary payment in accordance with the Council’s Affordable Housing Contributions Scheme (cl 7.14(1)-(6)).
Duties in special areas and site-specific constraints. The Plan contains bespoke duties: the Warriewood Valley clause caps dwelling numbers by sector and requires protection of creek rehabilitation opportunities before consent is given (cl 6.1(3)-(4)). Owners of land mapped for public acquisition have restrictions on what development can be consented to (cl 5.1A).
These duties and rights collectively allocate who must produce evidence, who decides, and what entitlements developers and landowners have. Practically, applicants must satisfy mapped standards or secure Council discretion with supporting technical material for flood, heritage, biodiversity, geotechnical, acid sulfate and other specialised matters.
Penalties and enforcement
The Plan sets out permissibility rules, consent pathways and requirements but does not itself specify particular monetary penalties or enforcement regimes in the text provided. Enforcement of the Plan’s requirements is exercised through the planning and development enforcement mechanisms established by the Environmental Planning and Assessment Act and associated regulations and local government legislation. The Plan does, however, create enforceable conditions and obligations that will be enforced by the consent authority:
Consent authority power to impose conditions. The Plan anticipates the Council imposing conditions on consents to secure conservation works, affordable housing dedications or contributions, and other mitigation measures (cl 5.10(10); cl 7.14(3)-(6)). Those consent conditions become enforceable through the Act and may carry consequences for non‑compliance under the Act and regulations.
Statutory recording and transparency requirements. Clause 4.6(4) requires the consent authority to keep a record of assessments for contraventions of development standards. That record-keeping supports reviewability and audit.
Limits on exempt development in sensitive areas and procedural gates. The Plan excludes exempt/compliant development in mapped environmentally sensitive areas (cl 3.3), which narrows the scope for unassessed works; carrying out excluded development without consent is a breach of the Act and may give rise to enforcement action.
Referral and notification obligations that trigger review or additional statutory processes. Heritage notification obligations to the Heritage Council (cl 5.10(7), (9)) and consultation with local Aboriginal communities (cl 5.10(8)) establish processes whose failure or avoidance could be material to the lawfulness of consent decisions and therefore open to review.
What the Plan does not do, within the text supplied, is list specific penalty amounts or administrative fines. Enforcement mechanisms and sanctions therefore derive from the Act, the regulations, and other applicable legislation cited in the Plan such as the Heritage Act 1977, the Fisheries Management Act 1994 and the Protection of the Environment Operations Act 1997 where those Acts create specific offences. The Plan also references approvals and licences under other Acts (e.g. fisheries and environmental licences) that continue to apply even where development is exempt under the Plan (see Schedule 2 note).
Practical enforcement risks and implementation points:
Compliance and proof burdens rest largely on applicants. For example, acid sulfate soils management plans (cl 7.1(3)), heritage management documents (cl 5.10(5)), flood risk measures (cl 5.21), and aquaculture operational requirements (cl 5.19 and Schedule 6) will be reviewed by Council. Failure to provide adequate studies or to meet conditions exposes applicants to refusal, conditions creating ongoing obligations, or post‑consent enforcement under the Act.
Inter-agency enforcement: some activities (e.g. below mean high water mark works, aquaculture, Fisheries Act matters, protection of environment offences) remain subject to parallel regulatory regimes and potential enforcement by other statutory agencies.
Record-keeping and discretionary decision-making: the Plan requires Council to record assessments for exceptions (cl 4.6(4)). Those records create an evidentiary trail that can be the basis for judicial review or merits appeals under the Act’s review pathways where parties challenge Council decisions.
In summary, the Plan sets the regulatory obligations and the consent authority’s decision gates, but the specific penalties and enforcement modalities are exercised under the primary planning Act and the other statutes the Plan references. Parties should therefore budget for potential compliance costs, conditional obligations and the legal infrastructure of enforcement under the Act when planning activity.
How it interacts with other laws
The Plan is embedded in a network of State legislation, policies and technical guidelines. The instrument repeatedly cross-references other Acts, policies and manuals; these intersections allocate responsibilities, create parallel licensing obligations, and, in some cases, pre-empt or prevail over the Plan.
Hierarchy and SEPPs. The Plan is subject to State environmental planning policies that prevail where there is conflict under section 3.28 of the Act (cl 1.9(1)). The Plan also lists specific SEPPs that may be relevant in the Land Use Table notes (for example SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021 and other chapter provisions cited in the Land Use Table note).
Interplay with the Environmental Planning and Assessment Act. The Plan is made under the Act and interacts with numerous Act provisions: the consent pathways, the operation of Division 3.5 for applications tied to amendments, the owner-initiated acquisition provisions and the Governor’s approval for clause 1.9A under section 3.16 are all actuated by the Act (see cl 1.8A note; cl 1.9A(4); cl 5.1(1) referencing section 3.15 of the Act).
Other NSW Acts and approvals. Many Plan clauses recognise that approvals and licences under other legislation remain necessary:
Heritage Act 1977: heritage items and interim heritage orders are excluded from exempt development and trigger referral and assessment pathways (cl 3.1(3)(d); cl 5.10; Schedule 5).
Fisheries and aquaculture laws: clause 5.19 and Schedule 6 require decision-makers to take into account aquaculture industry plans and strategies; the notes and specific clauses make clear Fisheries Act licences and other authorisations remain applicable.
Rural Fires Act 1997: bush fire hazard reduction works are authorised without development consent under cl 5.11.
Land Acquisition (Just Terms Compensation) Act 1991: clause 5.1 identifies the relevant acquisition authority for mapped land and references owner-initiated acquisition provisions.
Local Government Act 1993: the Plan provides for classification and reclassification of public land in line with the Local Government Act and references the process for authorising commercial use of community land and the requirement for plan of management adherence (cl 5.2; Schedule 2 sch.2-sec-oc.3).
Protection of the Environment Operations Act 1997 and Fisheries Management Act 1994: the Plan flags that exempt development under the Plan may still require licences under these Acts (Schedule 2 note for minor jetty works).
Technical guidelines and manuals. For hazard and flood matters the Plan expressly references technical guidance:
Flood Risk Management Manual and the Considering Flooding in Land Use Planning Guideline are cited for the meaning of flood planning level and for the matters consent authorities must rely on (cl 4.3(2G); cl 5.21(4)-(5); cl 5.22(4)-(5)).
Acid Sulfate Soils Manual is the standard for preparing required management plans (cl 7.1(3)-(4)).
Constraints on private instruments. Clause 1.9A operates to suspend private agreements, covenants and similar instruments that would restrict development consistent with the Plan, with exceptions for covenants the Council required or specified environmental agreements (cl 1.9A(1)-(3)). That clause therefore creates a statutory override of certain private land instruments, subject to specific exclusions and preservation of public authority registered interests.
Planning policy cross-references and precedence. The Plan’s notes and cross-references emphasise that State policies, industry development plans and strategies (for aquaculture, housing, transport, resilience and hazards) inform how the Plan is applied and can override or supplement it. For example, the Plan requires consent authorities to have regard to the NSW Oyster Industry Sustainable Aquaculture Strategy when deciding oyster aquaculture proposals (cl 5.19(5)).
In short, the Plan is not a stand-alone instrument. Its operation is interwoven with the Act’s procedural architecture, SEPPs and a set of sectoral statutes and technical manuals that define thresholds, override clauses, consultation obligations and licensing regimes. Applicants and advisers must therefore navigate the Plan alongside the cited State statutes and guidelines.
Amendment history
The Plan text contains numerous amendment annotations showing incremental changes since enactment. The instrument records insertions, substitutions, repeals and schedule changes. The following is a synthesis of the amendment markers present in the supplied text. Where the Plan body identifies an amendment, it is noted in‑line for that clause.
Select amendment notations appearing in the text:
Clause 1.8A (savings for development applications) notes amending instruments: Am 2019 (621), Sch 5[1]; 2023 (609), Sch 1.1[1].
Clause 1.9A (suspension of covenants) carries amendment note: Am 2019 (621), Sch 5[2]-[4].
Clause 2.1 (land use zones) shows amendment: Am 2022 (830), Sch 1.20[1]-[3].
Land Use Table (general) records procedural amendments in 2017, 2018, 2019, 2022 and 2023: Am 2017 (493) Sch 1.1[1][2]; 2018 (488) Sch 1.1[1]; 2019 (621) Sch 3; 2022 (830) Sch 1.20[4]-[6]; 2023 (539) Sch 1.1.
Clause 4.1AA (community title minimum lot size) was inserted: Am 2022 (830), Sch 1.20[7].
Clause 4.3 (height of buildings) was amended at multiple times: Am 2018 (145), Sch 1[1][2]; 2022 (830), Sch 1.20[7]; 2023 (609), Sch 2.14[1][2].
Clause 4.5A (density controls for certain residential accommodation) shows amendments: Am 2022 (830), Sch 1.20[9]; 2024 (42), Sch 1.32[1]-[3]; 2025 (483), Sch 1[1].
Clause 4.1B (minimum lot sizes for dual occupancies) appears as cl 4.1B - check the Plan body for its insertion date; the surrounding clauses show amendments in 2022 and later.
Clause 4.6 (exceptions to development standards) contains repeals and reference to the Environmental Planning and Assessment Regulation 2021 for procedural requirements; cl 4.6 also notes deletions and exclusions that have been changed over time.
Clause 5.9 (dwelling house or secondary dwelling affected by natural disaster) was inserted: Ins 2021 (302), Sch 1.25 and later amended 2022 (830), Sch1.20[11].
Clause 5.23 (public bushland) inserted: Ins 2022 (629), Sch 2[1].
Clause 6.1 (Warriewood Valley Release Area) contains several amendments across 2015, 2018 and 2018 instruments: Am 2015 (579), Sch 1[1]-[7]; 2018 (145), Sch 1[3]; 2018 (159), cl 5; 2018 (609), cl 4.
Schedule 1 records amendments in 2015, 2018, 2022 and 2023: sch 1 Am 2015 (67), cl 5(2); 2018 (145), Sch 1[5][6]; 2022 (830), Sch 1.20[12][13]; 2023 (692), Sch 1[2].
Schedule 2 (exempt development) notes an amendment in 2021: Am 2021 (175), Sch 2.8[1].
Schedule 5 (environmental heritage) has amendments recorded in 2016: sch 5 Am 2016 (34), Sch 1[1]-[38]; 2016 (162), cl 4(1)(2).
Clause 7.11 (converting serviced apartments) shows amendments in 2015 and 2023: Am 2015 (316), Sch 2.13; 2023 (664), Sch 3.13.
Clause 7.14 (affordable housing) was inserted in 2025: Ins 2025 (180), Sch 1[1]; and amended 2025 (483), Sch 1[2].
These amendment markers reflect iterative updates to zones, local provisions, standards for flood and coastal risk, biodiversity and affordable housing mechanisms. The Plan therefore has a track record of being modified to respond to technical guidance and policy choices at State and local level. Where the Plan text records a specific amendment notation it should be read with the cited amending instrument for the precise changes and commencement timing.
For legal advice or for transactional due diligence, practitioners should check the official consolidated Plan and the NSW legislation website for the up-to-date version, the specific amendment instruments identified by the citations above, and any associated commencement or transitional provisions that affect how the amendments operate in relation to pending development applications (see cl 1.8A dealing with savings for applications made before commencement of the Plan and later amending instruments).
Litigation history
The supplied Plan text does not contain any citations to judicial decisions, tribunal determinations or litigation outcomes that interpret its provisions. The instrument names external Acts and agencies and contains procedural and record-keeping obligations that create pathways for review under the Environmental Planning and Assessment Act, but the text itself does not report any case law or decisions.
Implications for advisers:
Absence of reported litigation in the Plan means that any contested interpretation of clauses (for example exceptions to development standards cl 4.6, or the clause suspending private covenants cl 1.9A) will need to be tested against the Act and, if necessary, in the Land and Environment Court or relevant review forum. Because the Plan requires the consent authority to record assessments and to notify particular statutory bodies, those administrative records will be important in any review.
Practitioners should search the Land and Environment Court databases and NSW planning decisions for precedents involving this Plan or its amendments if a practitioner needs judicial interpretation of particular clauses. The Plan itself, as provided, does not list prior litigation or authoritative interpretations.
If you require a targeted search for cases citing this Plan (for example challenges to cl 1.9A or cl 4.6 decisions), instruct me and I will prepare a jurisdictional case search plan and a scope of precedent-retrieval steps you should take.
Gotchas
The Plan contains many technical traps for practitioners and applicants. The following points are the main “gotchas” drawn directly from the instrument and its schedules.
Maps control outcomes. Many permissions and constraints are map-dependent. Height, floor space ratio, lot size minima, urban release sectors, biodiversity overlays, coastal risk and foreshore building lines are map-driven. Always check the current Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Urban Release Area Map, Biodiversity Map, Coastal Risk Planning Map, Foreshore Building Line Map and any Additional Permitted Uses Map before advising on permissibility (cl 1.7; cl 2.2; cl 4.1; cl 4.3; cl 4.4; cl 6.1).
Exempt/compliant pathways are closed in environmentally sensitive areas. Even development listed as exempt or complying in Schedules 2/3 cannot proceed in an “environmentally sensitive area for exempt or complying development” (cl 3.3). The definition lists coastal waters, coastal lakes, mapped wetlands and areas of high Aboriginal cultural significance or high biodiversity significance. Failing to check overlays can invalidate an otherwise workable exempt pathway.
Suspension of covenants has notable exclusions. Clause 1.9A suspends covenants to the extent necessary to enable Plan-consistent development, but it excludes covenants required by the Council, certain Crown Land instruments, conservation agreements and planning agreements under Division 7.1 of the Act. It also preserves public authority rights under registered instruments (cl 1.9A(1)-(3)). Don’t assume an old covenant is void; check the exceptions.
Subdivision and secondary dwellings. Subdivision that would separate a principal and secondary dwelling is barred unless the resulting lots meet the minimum lot size on the Lot Size Map (cl 2.6(2)). This affects proposals aiming to convert a secondary dwelling into a separate lot.
Height limits tied to flood planning level. The Plan contains complex exceptions allowing increased height above mapped limits where land is at or below the flood planning level, with precise maxima set by area (cl 4.3(2A)-(2E)). Practitioners must convert between building heights and the flood planning level (defined in cl 4.3(2G)) and check whether the site sits in one of the named Areas 1-6.
Exceptions to development standards are conditional and recordable. Clause 4.6 permits contraventions of development standards only when an applicant demonstrates compliance is unreasonable or unnecessary and there are environmental planning grounds; the consent authority must keep a record of the assessment (cl 4.6(2)-(4)). Certain development standards cannot be varied under cl 4.6(8). Applications relying on the exceptions must include the required documentation (see the Regulation referenced in the Plan).
Heritage and Aboriginal consultation obligations are procedural prerequisites. For archaeological sites and nominated State heritage items, the consent authority must notify the Heritage Council and consider its response (cl 5.10(7) and (9)). For Aboriginal places, local Aboriginal communities must be notified and responses considered (cl 5.10(8)). Failure to follow these processes may taint the consent.
Environment, health and other separate licences remain. Exempt status under the Plan does not remove licensing obligations under other legislation, for example for fisheries, waste, pollution control or Crown approvals (Schedule 2 note; cl 5.12). Check parallel regulatory regimes.
Owner-initiated acquisition and development limits. Land shown on the Land Reservation Acquisition Map is allocated to specified State authorities, and where the land remains unacquired, cl 5.1A restricts consents to particular purposes (roads or recreation areas). Development proposals on such land should be considered against the acquisition map and relevant authority (cl 5.1; cl 5.1A).
Affordable housing contribution specifics. Clause 7.14 introduces a 5 percent gross floor area affordable housing contribution for development in mapped Affordable Housing Contribution Areas and allows Council to accept land dedication or a monetary contribution. The clause references the Council’s Affordable Housing Contributions Scheme published in March 2025; the valuation and exchange rate mechanics for dedication versus monetary payment are governed by that Scheme (cl 7.14(2)-(6)). Practitioners must consult the Scheme itself for calculation methods.
Temporary uses are strictly capped. Temporary uses of land without consent are limited to a maximum of 42 days in any 12 month period unless the use is a sales office for a new release area/housing estate (cl 2.8). Events and pop-ups must therefore be planned within that limit or secure consent.
Aquaculture rules are multi-layered. Pond and tank aquaculture have site selection, species and operational requirements including conservation exclusion zones and discharge restrictions (cl 5.19 and Schedule 6). Priority oyster aquaculture areas allow some aquaculture without consent; elsewhere, the consent authority must be satisfied of compliance with Part 1 of Schedule 6 and relevant aquaculture industry development plans and strategies (cl 5.19(2)-(6)).
Council’s record of exceptions and DCP requirements for release areas. Warriewood Valley has specific dwelling caps per sector and a requirement that certain stages not proceed unless sector dwelling numbers are achieved and creek corridor rehabilitation is protected (cl 6.1(3)-(4)). Clause 6.2 requires development control plans for specified areas, and DCPs must address staging, design and sequencing, stormwater, biodiversity and cultural heritage matters.
These “gotchas” are practical triggers that determine whether a development can proceed by an exempt/compliant pathway, or will require detailed technical studies, DCP compliance and potentially contentious discretionary approvals.
How to comply
Compliance with the Plan requires a structured checklist approach because the Plan couples map-based constraints with subject-specific technical gates. Below is a practical compliance workflow and the documents, checks and likely conditions that practitioners should expect, grounded in the Plan provisions.
Preliminary map and zone check
Step: Obtain the current Plan maps on the NSW Planning Portal (Land Zoning Map; Lot Size Map; Height of Buildings Map; Floor Space Ratio Map; Flood, Coastal Risk and Biodiversity maps; Additional Permitted Uses Map; Land Reservation Acquisition Map; Foreshore Building Line Map).
Purpose: Determine the zone, permissibility (per Land Use Table), applicable lot size minima, mapped height and FSR controls, and overlays that may exclude exempt/compliant pathways (cl 1.7; cl 2.2; cl 4.1; cl 4.3; cl 4.4; cl 3.3).
Establish the correct procedural path
If the proposal is listed as exempt in Schedule 2 and the land is not an environmentally sensitive area, confirm that all Schedule 2 standards are met and that no other Act licences are required (cl 3.1; cl 3.3; Schedule 2 note).
If complying development in Schedule 3 applies, confirm the development meets the specified deemed-to-satisfy provisions and any condition in Part 2 of Schedule 3 (cl 3.2).
If neither pathway applies or the land is overlain by sensitive mapping, prepare a development application seeking development consent (cl 2.3(1); cl 3.3).
Specialist overlay checks and technical documentation
Heritage items and heritage conservation areas: if the site affects heritage items or archaeological sites, expect the consent authority to require a heritage management document or heritage conservation management plan and to notify the Heritage Council for archaeological sites (cl 5.10(4)-(6), (7)). For Aboriginal places, prepare adequate investigation and consult local Aboriginal communities (cl 5.10(8)).
Flood and coastal risk: where the site is in the flood planning area or coastal risk mapping, commission a flood risk assessment, demonstrate compatibility with flood function, show evacuation and life-safety measures, consider sea-level rise and refer to the Considering Flooding Guideline and the Flood Risk Management Manual (cl 5.21(2)-(5); cl 5.22).
Acid sulfate soils and earthworks: for works on the mapped classes, prepare an acid sulfate soils management plan consistent with the Acid Sulfate Soils Manual; for significant earthworks, prepare an erosion, drainage and soil stability management plan (cl 7.1(2)-(4); cl 7.2(3)).
Biodiversity and public bushland: if biodiversity mapping or adjoining public bushland apply, provide ecological assessments, avoidance and mitigation measures, and remediation strategies (cl 7.6; cl 5.23).
Geotechnical hazards: prepare geotechnical reports addressing site layout, cut and fill, drainage and construction methods (cl 7.7).
Aquaculture proposals: align with aquaculture industry development plans and Schedule 6 operational/site requirements, including species selection, pond/tank design and discharge controls (cl 5.19; Schedule 6).
Apply the development standards engine
Verify compliance with mapped lot size minima (cl 4.1; cl 4.1AA).
Check that proposed heights do not exceed mapped limits or that height exceptions are justified and meet the precise criteria in cl 4.3(2A)-(2F) where relevant.
Calculate FSR in accordance with cl 4.5 and consider covenants preventing “double dipping” for consolidated sites; be prepared for conditions requiring covenants to be registered to secure floor space allocation (cl 4.5(3)-(11)).
If a standard will be breached, prepare a 4.6 justification
For contraventions of development standards prepare the statutory document required by the Environmental Planning and Assessment Regulation showing why compliance is unreasonable or unnecessary and what environmental planning grounds justify the contravention. Anticipate the consent authority recording its assessment (cl 4.6(2)-(4)). Remember cl 4.6 excludes some standards from variation (cl 4.6(8)).
Address affordable housing and other local contributions
If the land sits in an Affordable Housing Contribution Area, ensure proposals meet the minimum affordable housing proportion and prepare to satisfy a 5 percent GFA contribution condition by dedication of dwellings or land, or monetary contribution in line with the Council’s Affordable Housing Contributions Scheme (cl 7.14(1)-(6)). Obtain the Council’s Scheme (March 2025) for valuation and exchange-rate methodology.
Check plan-specific constraints for special areas
For Warriewood Valley or other mapped release areas, verify sector dwelling caps and DCP requirements for staging and creek rehabilitation; obtain or prepare the required site-specific DCP before lodging applications for affected land (cl 6.1(3)-(4); cl 6.2).
Consult and notify statutory stakeholders early
Early liaison with Council, Heritage Council (where archaeological or State heritage issues arise), local Aboriginal communities (where Aboriginal places are concerned), Transport for NSW or the relevant acquisition authority (for land marked for acquisition) will reduce scope for later objections or referral delays (cl 5.1; cl 5.10(7)-(9); cl 5.1A).
Prepare conditions, covenants and management plans to secure consent
Expect Council to impose conditions requiring implementation of heritage conservation work, remediation of public bushland, flood-resilient design, acid sulfate soils management, and registration of covenants to prevent floor area duplication (cl 5.10(10); cl 5.23(3)-(5); cl 4.5(9)-(10)).
Monitor and manage concurrent non-planning approvals
Confirm whether other licences are required, for example fisheries licences, Crown consents, environmental protection licences, building approvals and connections to utilities; ensure development proposals do not assume that Plan-conformity obviates these other approvals (Schedule 2 note; cl 5.12).
Practical checklist for lodgement
Current mapping extracts confirming zoning, overlays and any additional permitted use area.
Site plan, elevations and shadow diagrams showing compliance with height/FSR/lot coverage or a 4.6 submission if non-compliant.
Heritage impact statement and any required heritage management plan.
Flood risk and evacuation assessment referencing the Considering Flooding guideline and Flood Risk Management Manual.
Acid sulfate soil preliminary assessment and management plan if the map triggers the requirement (cl 7.1).
Biodiversity/vegetation assessment with avoidance/mitigation proposal where the Biodiversity Map applies.
Geotechnical report for mapped geotechnical hazards.
DCP compliance demonstration where cl 6.2 applies.
Affordable housing calculation and proposed mechanism to satisfy the 5 percent contribution if in the mapped area (cl 7.14).
Any aquaculture-specific technical reports if cl 5.19 is relevant.
Final notes
Record retention requirements for exceptions (cl 4.6(4)) and referral timelines for heritage (cl 5.10(7), (9)) should be factored into project timelines.
Where development is proposed on land that may be acquired, or which is intended to be acquired, check cl 5.1 and cl 5.1A for permitted purposes and Council’s view on acquisition timing; the Plan also allows that a consent authority consider development on acquired land before it is used for the reservation purpose (cl 5.1(3)).
Following the workflow above and assembling the technical package aligned to the Plan’s clauses will materially reduce the risk of refusal, conditioned consents that unreasonably inflate project cost, or post-consent compliance and enforcement actions.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Pittwater Local Environment Plan 1993
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU2 Rural Landscape
Residential Zones
R2 Low Density Residential
R3 Medium Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP1 Special Activities
SP2 Infrastructure
SP3 Tourist
SP4 Enterprise
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C2 Environmental Conservation
C3 Environmental Management
C4 Environmental Living
Waterway Zones
W1 Natural Waterways
W2 Recreational Waterways
W4 Working Waterfront
cl 2.1: Am 2022 (830), Sch 1.20[1]–[3].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2
5A
Part 7 contains other local provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 42 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and l
This is an opening excerpt, not the complete document.