23Report about alteration of pipeline
Start here
Get a plain-English read of 23
Turn the raw legal text into a practical explanation grounded in Pipelines Regulation 2023.
23 Report about alteration of pipeline
23 Report about alteration of pipeline
A licensee for a pipeline that has been permanently altered as a result of the carrying out of work—
(a) must give a written report about the work to the Secretary within 14 days after the work is completed, and
(b) must ensure the report includes—
(i) a statement that the work has been completed, and
(ii) a reference to the relevant standard, or condition of the licence, in accordance with which the work was carried out.
Maximum penalty—
(a) for a corporation—2,000 penalty units, or
(b) for an individual—400 penalty units.
s 23: Am 2025 (675), Sch 1[20].