Petroleum (Submerged Lands) (Resource Management and Administration) Regulations 2015
Sch 3Field management plan
Start here
Get a plain-English read of Sch 3
Turn the raw legal text into a practical explanation grounded in Petroleum (Submerged Lands) (Resource Management and Administration) Regulations 2015.
Schedule 3 — Field management plan
[r. 48(1)]
| 1. | Evidence and data showing that the field contains petroleum, including details of the structure, extent and location of discovered petroleum pools. | | 2. | Estimates of the volume of petroleum in place and recoverable petroleum, including data supporting the estimates. | | 3. | A description of the following —<br>(a) the possible petroleum pools in the field;<br>(b) the applicant’s plans (if any) to explore for petroleum pools;<br>(c) how any petroleum pools of commercial quantity can be incorporated into the development of the licence area. | | 4. | A description of the following —<br>(a) an appropriate strategy for the development of the field, management of petroleum pools and optimum long‑term recovery;<br>(b) any proposed and alternative development scenarios. | | 5. | A description of how the applicant intends to recover petroleum over time, including the following information —<br>(a) the estimated positions of wells;<br>(b) the potential timing of workover operations;<br>(c) possible tie‑ins. | | 6. | Details of the past performance (if any) of production wells in the field and a prediction of the future performance of those wells. | | 7. | The proposed maximum rate of recovery of petroleum from the field. | | 8. | Details of the following —<br>(a) any aquifers that could be affected by the development of the field;<br>(b) the applicant’s proposals for the management of such aquifers including proposals for baseline monitoring. | | 9. | The project schedule, including the following —<br>(a) an estimated development timetable for production facilities such as wells, platforms and pipelines;<br>(b) estimated dates for cessation of production and field closure. | | 10. | Details of the applicant’s operations or proposals for the following —<br>(a) the enhanced recovery or recycling of petroleum;<br>(b) the processing, storage or disposal of petroleum;<br>(c) the injection of water or treatment material into an underground formation. | | 11. | Arrangements for the following —<br>(a) monitoring, recording in writing and reporting on the applicant’s conduct of pool management;<br>(b) keeping records and other documents about the applicant’s conduct of pool management. | | 12. | Details of equipment and procedures used to determine the quantity and composition of petroleum and water. | | 13. | Details of the following —<br>(a) the surface connections and equipment to be used by the applicant;<br>(b) any petroleum production by a well that is from more than one petroleum pool;<br>(c) any petroleum production from a petroleum pool that is through more than one well. | | 14. | Arrangements for the management of the following —<br>(a) produced formation material;<br>(b) waste fluid and other waste material produced from wells;<br>(c) treatment material;<br>(d) waste petroleum;<br>(e) refuse from tanks and wells;<br>(f) naturally occurring radioactive materials;<br>(g) geological risk. | | 15. | Arrangements for the disposal or flaring of any produced petroleum. | | 16. | A description of the applicant’s plans for closure of the field, including plans for decommissioning and rehabilitation. | | 17. | A list of the principal Australian and international standards that apply in relation to the applicant’s operations and plant used in connection with those operations. |