Petroleum (Submerged Lands) (Resource Management and Administration) Regulations 2015
Sch 11Survey acquisition report
Start here
Get a plain-English read of Sch 11
Turn the raw legal text into a practical explanation grounded in Petroleum (Submerged Lands) (Resource Management and Administration) Regulations 2015.
Schedule 11 — Survey acquisition report
[r. 75(1)]
| 4. | The name of the contractor that conducted the survey. | | 5. | The name of the vessel or aircraft that was used to conduct the survey. | | 6. | A map showing where the survey was conducted. | | 7. | The dates on which the survey started and ended. | | 8. | Details of all data acquisition equipment and systems used. | | 9. | Details of all positioning and navigation equipment and systems used. | | 10. | The number of lines of data acquired in the survey and the number of data acquisition points along each line. | | 11. | Navigation data for the survey, in the form of —<br>(a) for a 2‑dimensional seismic survey — x, y and z coordinates for each shotpoint; or<br>(b) for other 2‑dimensional surveys — line ends and bends; or<br>(c) for a 3‑dimensional seismic survey — a full fold polygon outline; or<br>(d) for other 3‑dimensional surveys — a polygon outline. | | 12. | The geometry of the acquisition parameters. | | 13. | The results of any onboard data processing. | | 14. | The results of any system tests, calibrations and diagnostics. |