Petroleum, Geothermal Energy and Greenhouse Gas Storage (Resource Management and Administration) Regulations 2015
Sch 7Final well activity report
Start here
Get a plain-English read of Sch 7
Turn the raw legal text into a practical explanation grounded in Petroleum, Geothermal Energy and Greenhouse Gas Storage (Resource Management and Administration) Regulations 2015.
Schedule 7 — Final well activity report
[r. 73(1)]
| 2. | The name of the instrument holder. | | 3. | The name of the instrument area in which the well is located. | | 4. | The purpose of the well activity (for example, testing or intervention). | | 5. | The status of the well (for example, producing, injecting, suspended or decommissioned). | | 6. | The location of the well, in the form of —<br>(a)the elevation, latitude and longitude of the well; and<br>(b)the basin and sub‑basin (if applicable) in which the well is located; and<br>(c)the map sheet name and graticular block number. | | 7. | The start date of the well activity. | | 8. | The end date of the well activity. | | 9. | What is being used as the depth reference for the well (for example, the Kelly bushing or the rig floor). | | 10. | The height of the depth reference above sea level or the Australian Height Datum. | | 11. | The water depth or ground depth at the well. | | 12. | The measured depth of the well. | | 13. | The true vertical depth of the well. | | 14. | If applicable, the depth of perforation in the resources pool or geothermal resources area. | | 15. | If applicable, the name of the drilling contractor. | | 16. | If applicable, the name of the rig drilling the well. | | 17. | If applicable, the rig’s make and model. | | 18. | If applicable, a list of log runs for wireline logging and velocity surveys. | | 19. | If applicable, the names of the contractors for —<br>(a)cementing; and<br>(b)wireline logging; and<br>(c)measurements while drilling (MWD); and<br>(d)logging while drilling (LWD); and<br>(e)mudlogging. | | 20. | If applicable, the names of MWD and LWD tools used. | | 21. | Details of equipment and casing installed on or in the well, including schematics. | | 22. | If applicable, information on cementing operations and schematics of decommissioning. | | 23. | Treatment materials used. | | 24. | Treatment material losses. | | 25. | If applicable, wireline formation analysis and processing results. | | 26. | If applicable, production test results. | | 27. | Details of any indication of petroleum, a regulated substance or geothermal energy resources. | | 28. | Raw pressure‑time listings for any formation fluid sample tests and production tests. | | 29. | Details of any produced formation materials. |
[Schedule 7 amended: SL 2026/82 r. 65.]