Petroleum and Greenhouse Gas Storage (Submerged Lands) (Resource Management and Administration) Regulations 2015
Sch 3Field management plan
Start here
Get a plain-English read of Sch 3
Turn the raw legal text into a practical explanation grounded in Petroleum and Greenhouse Gas Storage (Submerged Lands) (Resource Management and Administration) Regulations 2015.
Schedule 3 — Field management plan
[r. 48(1)]
| 1. | Evidence and data showing that the field contains petroleum or a regulated substance, including details of the structure, extent and location of discovered resources pools. | | 2. | Estimates of the volume of petroleum or regulated substances in place and recoverable petroleum or regulated substances, including data supporting the estimates. | | 3. | A description of the following —<br>(a)the possible resources pools in the field;<br>(b)the applicant’s plans (if any) to explore for resources pools;<br>(c)how any resources pools of commercial quantity can be incorporated into the development of the licence area. | | 4. | A description of the following —<br>(a)an appropriate strategy for the development of the field, management of resources pools and optimum long‑term recovery;<br>(b)any proposed and alternative development scenarios. | | 5. | A description of how the applicant intends to recover petroleum or regulated substances over time, including the following information —<br>(a)the estimated positions of wells;<br>(b)the potential timing of workover operations;<br>(c)possible tie‑ins. | | 6. | Details of the past performance (if any) of production wells in the field and a prediction of the future performance of those wells. | | 7. | The proposed maximum rate of recovery of petroleum or regulated substances from a resources pool in the field. | | 8. | Details of the following —<br>(a)any aquifers that could be affected by the development of the field;<br>(b)the applicant’s proposals for the management of such aquifers including proposals for baseline monitoring. | | 9. | The project schedule, including the following —<br>(a)an estimated development timetable for production facilities such as wells, platforms and pipelines;<br>(b)estimated dates for cessation of production and field closure. | | 10. | Details of the applicant’s operations or proposals for the following —<br>(a)the enhanced recovery or recycling of petroleum or regulated substances;<br>(b)the processing, storage or disposal of petroleum or regulated substances;<br>(c)the injection of water or treatment material into an underground formation. | | 11. | Arrangements for the following —<br>(a)monitoring, recording in writing and reporting on the applicant’s conduct of pool management;<br>(b)keeping records and other documents about the applicant’s conduct of pool management. | | 12. | Details of equipment and procedures used to determine the quantity and composition of petroleum, regulated substances and water. | | 13. | Details of the following —<br>(a)the surface connections and equipment to be used by the applicant;<br>(b)any petroleum or regulated substance production by a well that is from more than 1 resources pool;<br>(c)any petroleum or regulated substance production that is from a resources pool that is through more than 1 well. | | 14. | Arrangements for the management of the following —<br>(a)produced formation material;<br>(b)waste fluid and other waste material produced from wells;<br>(c)treatment material;<br>(d)waste petroleum or regulated substances;<br>(e)refuse from tanks and wells;<br>(f)naturally occurring radioactive materials;<br>(g)geological risk. | | 15. | Arrangements for the disposal or flaring of any produced petroleum or regulated substances. | | 16. | A description of the applicant’s plans for closure of the field, including plans for decommissioning and rehabilitation. | | 17. | A list of the principal Australian and international standards that apply in relation to the applicant’s operations and plant used in connection with those operations. |