© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
Petroleum and Geothermal Energy Resources (Resource Management and Administration) Regulations 2015
Start here
Turn the raw legal text into a practical explanation grounded in Petroleum and Geothermal Energy Resources (Resource Management and Administration) Regulations 2015.
Schedule 12 — Survey acquisition report
[r. 76(1)]
| 4. | The name of the contractor that conducted the survey. | | 5. | The name of the vessel or aircraft that was used to conduct the survey. | | 6. | A map showing where the survey was conducted. | | 7. | The dates on which the survey started and ended. | | 8. | Details of all data acquisition equipment and systems used. | | 9. | Details of all positioning and navigation equipment and systems used. | | 10. | The number of lines of data acquired in the survey and the number of data acquisition points along each line. | | 11. | Navigation data for the survey, in the form of —<br>(a) for a 2‑dimensional seismic survey — x, y and z coordinates for each shotpoint; or<br>(b) for other 2‑dimensional surveys — line ends and bends; or<br>(c) for a 3‑dimensional seismic survey — a full fold polygon outline; or<br>(d) for other 3‑dimensional surveys — a polygon outline. | | 12. | The geometry of the acquisition parameters. | | 13. | The results of any onboard data processing. | | 14. | The results of any system tests, calibrations and diagnostics. |