sec.28 Requirement to survey the surface location and elevation of a petroleum well or bore
The holder of a petroleum tenure under which a petroleum well or bore is drilled must ensure the surface location and elevation of the well are surveyed—
before, or as soon as practicable after, drilling of the well starts; but
not later than 6 months after the drilling starts.
The survey must be carried out by a person—
who is registered as a surveyor, surveying graduate or surveying associate under the Surveyors Act 2003 ; or
who holds a corresponding registration as a surveyor in another State.
The survey must be tied to—
the State control survey under the Survey and Mapping Infrastructure Act 2003 ; and
a survey mark related to the AHD.
The location and elevation of the petroleum well or bore must be surveyed to the level of accuracy required under—
a survey standard that applies to the type of survey and the area in which the survey is being carried out; and
the Survey and Mapping Infrastructure Act 2003 .
In this section—
AHD means the Australian height datum adopted by the National Mapping Council of Australia for referencing a level or height back to a standard base level.
survey standard means a survey standard under the Survey and Mapping Infrastructure Act 2003 .
(sec.28-ssec.1) The holder of a petroleum tenure under which a petroleum well or bore is drilled must ensure the surface location and elevation of the well are surveyed— before, or as soon as practicable after, drilling of the well starts; but not later than 6 months after the drilling starts.
(sec.28-ssec.2) The survey must be carried out by a person— who is registered as a surveyor, surveying graduate or surveying associate under the Surveyors Act 2003 ; or who holds a corresponding registration as a surveyor in another State.
(sec.28-ssec.3) The survey must be tied to— the State control survey under the Survey and Mapping Infrastructure Act 2003 ; and a survey mark related to the AHD.
(sec.28-ssec.4) The location and elevation of the petroleum well or bore must be surveyed to the level of accuracy required under— a survey standard that applies to the type of survey and the area in which the survey is being carried out; and the Survey and Mapping Infrastructure Act 2003 .
(sec.28-ssec.5) In this section— AHD means the Australian height datum adopted by the National Mapping Council of Australia for referencing a level or height back to a standard base level. survey standard means a survey standard under the Survey and Mapping Infrastructure Act 2003 .
- (a) before, or as soon as practicable after, drilling of the well starts; but
- (b) not later than 6 months after the drilling starts.
- (a) who is registered as a surveyor, surveying graduate or surveying associate under the Surveyors Act 2003 ; or
- (b) who holds a corresponding registration as a surveyor in another State.
- (a) the State control survey under the Survey and Mapping Infrastructure Act 2003 ; and
- (b) a survey mark related to the AHD.
- (a) a survey standard that applies to the type of survey and the area in which the survey is being carried out; and
- (b) the Survey and Mapping Infrastructure Act 2003 .