Compliance under this plan requires a structured, instrument-aware approach because the plan imposes consent requirements for particular development types but defers procedural and enforcement mechanisms to the Environmental Planning and Assessment Act 1979 and to other environmental planning instruments that it preserves or overrides.
Step 1 , Confirm site jurisdiction and scope: Verify that the land is within the City of Penrith (cl 3). The plan applies to all land in the City, so this is the primary geographic gateway. If the land lies outside the City of Penrith, the plan’s provisions do not apply.
Step 2 , Identify the proposed development type against the plan’s categories: Map the proposed works to the plan’s operative categories:
- Erection of a dwelling house (cl 6(1)), noting the plan’s definition of “dwelling house” as the only dwelling on an allotment (cl 5(1));
- Erection of a building or structure ordinarily associated with a dwelling house, including alterations and additions (cl 7(1)(a); cl 5(1));
- Change of building use (cl 7(1)(b));
- Demolition (cl 7(1)(c));
- Structural, internal or external building work in association with specific commercial uses (cl 7(1)(d)); and
- Subdivision of land (cl 8(1)).
Make a precise factual determination whether the proposed works fall within these categories based on the plan’s definitions in cl 5(1). For example, confirm whether the proposal is a single dwelling on an allotment to attract cl 6, or whether multiple dwellings on an allotment change the classification.
Step 3 , Check whether another instrument already requires consent or prohibits the development: Each of the consent gates is subject to the condition that the development “does not require development consent because of another environmental planning instrument, and is not prohibited by another environmental planning instrument” (cl 6(3), cl 7(2)(a), cl 8(2)(a)). Therefore:
- Search for applicable local environmental planning instruments, State environmental planning policies and any deemed environmental planning instruments that may apply to the site and the proposed development.
- Pay special attention to the instruments listed in cl 4(3): the specified Chapters of State Environmental Planning Policy (Transport and Infrastructure) 2021, State Environmental Planning Policy (Resources and Energy) 2021, State Environmental Planning Policy (Precincts,Western Parkland City) 2021, State Environmental Planning Policy (Biodiversity and Conservation) 2021, and Penrith Local Environmental Plan No 255,Exempt and Complying Development (cl 4(3)(a)-(e)). These instruments are expressly preserved by the plan and may displace or supplement its obligations.
Step 4 , Check exempt and complying development pathways under Penrith LEP No 255: If the proposed development is identified as exempt or complying under Penrith LEP No 255, the plan’s consent gates do not apply (cl 4(3)(e); cl 7(2)(c); cl 8(2)(c)). Therefore review LEP No 255 to determine whether the development qualifies for an exempt or complying pathway. If it does, the proponent may proceed under those rules rather than via a development application under this plan.
Step 5 , Check for Crown building work status if relevant: If the project is Crown building work, the consent prohibitions in cl 7 and cl 8 do not apply (cl 7(2)(d); cl 8(2)(d)). Determine whether the project falls within the Act’s definition of Crown building work in s 116G. If Crown work status is arguable, obtain legal clarification because Crown status affects both process and applicable obligations.
Step 6 , Determine whether the plan or other instruments prohibit the development: The consent gates are inapplicable where another instrument prohibits the development. Confirm whether any instrument expressly prohibits the proposed works. If so, consent cannot be used to validate a prohibited development under this plan.
Step 7 , If consent is required, prepare and lodge an application under the Act: The plan requires development consent but does not specify application forms, criteria or authority. Therefore:
- Identify the consent authority and the procedural requirements under the Environmental Planning and Assessment Act 1979 and relevant regulations and practice notes.
- Prepare an application that addresses any matters listed under the Act and under any applicable State or local instrument preserved by cl 4(3).
- Include plans and documentation that demonstrate how the proposal fits the plan’s definitions and addresses any overlapping instruments.
Step 8 , Anticipate cross-instrument assessment: Because the plan may prevail over inconsistent local instruments (cl 4(1)), but also preserves certain State instruments (cl 4(3)), the application should identify and explain any inconsistencies and why the plan’s provisions apply. Where the plan and other instruments both apply, the application should demonstrate compliance with the most relevant provisions and identify any conflict for the consent authority’s consideration.
Step 9 , Maintain records of instrument checks and interpretation: Keep written records of the instrument checks described above , including searches of LEP No 255, the relevant SEPPs listed in cl 4(3), and any determinations about Crown building work or prohibitions. Those records will be useful in the event of a compliance query or enforcement action.
Step 10 , Seek legal or planning advice for borderline cases: Given the narrow definitions in cl 5 (for example the allotment-based definition of “dwelling house”) and the plan’s conditional operation, obtain professional advice where the classification of the development or the interaction of instruments is in doubt. Where an activity might be wrongly assumed to be exempt or where multiple dwellings on a single allotment are involved, early advice reduces the risk of unauthorised development.
Other practical tips grounded in the plan:
-
Treat the plan’s notes cautiously. Clause 5(2) states that the list of contents and notes are not part of the plan. The plan’s commencement note about the meaning of “change of building use” is therefore an interpretive hint, not an operative definition overriding more current definitions that may exist in the Building Code or the Act.
-
Be aware of the plan’s amendment history. Clause 4’s amendment annotations suggest that the relationship between this plan and other instruments has been adjusted over time. Where project timelines span multiple amendments, verify the operative text applicable to the project’s critical dates.
-
Do not assume the plan supplies enforcement or appeal procedures. The plan creates duties but does not state how contraventions are enforced. Consult the Act for enforcement processes and potential sanctions.
Following these steps, and documenting the cross-instrument checks and factual mapping to the plan’s definitions, is the compliance pathway that aligns with the plan’s structure and operative text.