CTHIn ForceLegislation
Ozone Protection and Synthetic Greenhouse Gas Management Regulations 1995
3Unlicensed manufacture of scheduled substances or equipment
Start here
Get a plain-English read of 3
Turn the raw legal text into a practical explanation grounded in Ozone Protection and Synthetic Greenhouse Gas Management Regulations 1995.
#### 3 Unlicensed manufacture of scheduled substances or equipment
Manufacture of scheduled substances—exempt circumstances
(1) For the purposes of subsection 13(2) of the Act, the following circumstances are prescribed:
(a) that the SGG is not an HFC and the whole amount of the SGG is used in:
(i) a medical device; or
(ii) medicine; or
(iii) a veterinary device; or
(iv) veterinary medicine;
(b) that the manufacture of the SGG consists of the formation of the SGG as a by‑product of the manufacture of aluminium.
Manufacture of equipment containing a scheduled substance
(1A) For the purposes of paragraph 13(3)(d) of the Act, the following equipment is prescribed:
(a) small SGG air conditioning equipment;
(b) multi‑head small SGG air conditioning equipment.
(2) For the purposes of paragraph 13(5)(d) of the Act, the following are prescribed:
(a) a scheduled substance other than an SGG;
(b) small SGG air conditioning equipment;
(c) multi‑head small SGG air conditioning equipment.