99 Completion of notified well activity
Notice of completion of notified well activity
(a) the titleholder was required to notify NOPSEMA of the proposal to carry out a well activity under section 97; and
(b) the titleholder completes the well activity; and
(c) the titleholder does not notify NOPSEMA of the completion:
(i) in writing; and
(ii) within 10 days of the completion.
Change to design, construction or operation of well
(a) the titleholder was required to notify NOPSEMA of the proposal to carry out a well activity under section 97; and
(b) the titleholder completes the well activity; and
(c) the well activity resulted in a material change to the design, construction or operation of the well; and
(d) the titleholder does not give NOPSEMA a written description of the change, in writing, within 30 days of the completion.
(3) A titleholder commits an offence of strict liability if the titleholder contravenes subsection (1) or (2).
Note: This subsection is a continuing offence under section 4K of the Crimes Act 1914. See section 237 of this instrument for the maximum penalty for each day that an offence under this subsection continues.
(4) A titleholder is liable to a civil penalty if the titleholder contravenes subsection (1) or (2).
Note: This subsection is a continuing civil penalty provision under section 93 of the Regulatory Powers Act. See section 237 of this instrument for the maximum civil penalty for each day that a contravention referred to in this subsection continues.