Offshore Petroleum and Greenhouse Gas Storage Regulations 2021
Sch 6Information that must be set out in summary of site plan
Start here
Get a plain-English read of Sch 6
Turn the raw legal text into a practical explanation grounded in Offshore Petroleum and Greenhouse Gas Storage Regulations 2021.
Schedule 6—Information that must be set out in summary of site plan
Regulation 169(1)
1 A short description of—
(a) the project; and
(b) the size of its footprint; and
(c) the schedule for carrying on the project.
2 The project's location, including—
(a) the latitude and longitude; and
(b) the distance of the location from the nearest point of the Australian mainland; and
(c) the distance of the location from the nearest Australian town and the nearest Australian capital city.
3 A description of the title.
4 The name of each current titleholder.
5 For the project—
(a) its storage capacity; and
(b) the proposed injection amount and the period of injection for each greenhouse gas substance to be injected; and
(c) the number and location of the proposed injection wells.
6 Details of the proposed monitoring program that will verify plume behaviour.