Offshore Petroleum and Greenhouse Gas Storage Regulations 2021
306Requirement for survey processing report and data
Start here
Get a plain-English read of 306
Turn the raw legal text into a practical explanation grounded in Offshore Petroleum and Greenhouse Gas Storage Regulations 2021.
306 Requirement for survey processing report and data
(1) A greenhouse gas titleholder who undertakes a geophysical or geological survey in a title area must give the Minister a survey processing report and all processed survey data within—
(a) in the case of a 2-dimensional seismic survey—12 months after the day on which the acquisition of the data is completed; or
(b) in the case of a 3-dimensional seismic survey—18 months after the day on which the acquisition of the data is completed; or
(d) if the Minister authorises the titleholder to give the report within another period—the other period.
processed survey data means—
(a) in relation to a 2-dimensional seismic survey—each type of data mentioned in an item in Part 1 of Schedule 10—
(ii) presented on another medium or in another format which the Minister has authorised the greenhouse gas titleholder to use; or
(b) in relation to a 3-dimensional seismic survey—each type of data mentioned in an item in Part 2 of Schedule 10 and presented in accordance with paragraph (a)(i) or (ii); or
(c) in relation to any other type of survey—each type of data mentioned in an item in Part 3 of Schedule 10 and presented in accordance with paragraph (a)(i) or (ii);
survey processing report means a report that includes—
(d) the dates on which processing of the survey started and ended; and
(e) the name of the processing contractor; and
(f) the purpose of the processing; and
(g) a summary of the data acquisition parameters; and
(h) details of all the processing sequences and techniques used; and
(i) a sample Extended Binary Coded Decimal Interchange Code (EBCDIC) header from the final data set; and
(j) listings of all processed data; and
(k) in the case of a 3-dimensional survey—
(i) a description of the position of the survey polygon; and
(ii) a calculation for the 3-dimensional line numbering convention.