302Requirement for initial well completion report and data
Start here
Get a plain-English read of 302
Turn the raw legal text into a practical explanation grounded in Offshore Petroleum and Greenhouse Gas Storage Regulations 2021.
302 Requirement for initial well completion report and data
(1) A greenhouse gas titleholder who undertakes drilling operations in a title area must give the Minister an initial well completion report and all initial well completion data within—
(a) 6 months after the rig release date; or
initial well completion data means each type of data mentioned in an item in Schedule 7—
(b) presented on another medium or in another format which the Minister has authorised the greenhouse gas titleholder to use;
initial well completion report means a report that includes all of the information listed in subregulation (3).
(3) For the purposes of the definition of initial well completion report in subregulation (2), the information required is in the following Table.
| 3 | The location of the well, in the form of—<br> (a) latitude and longitude; and<br> (b) map sheet name and graticular block number; and<br> (c) seismic line location and shotpoint number | | 4 | The results of a check survey of the location of—<br> (a) for a subsea well—the wellhead; or<br> (b) in any other case—the top of the casing supporting the blow-out preventer | | 5 | If the well is a sidetrack—the name of the parent well | | 6 | The names of the rig contractor and rig operator | | 7 | The name of the rig drilling the well | | 8 | The rig's make and model | | 9 | The names of the contractors for—<br> (a) cementing; and<br> (b) wireline logging; and<br> (c) measurements while drilling (MWD); and<br> (d) logging while drilling (LWD); and<br> (e) mudlogging | | 10 | Names of MWD and LWD tools used | | 11 | List of log runs for wireline logging and velocity surveys | | 12 | The purpose of the well (for example development, appraisal, exploration or stratigraphy) | | 13 | The outcome of the well operation (for example completion of the well as an injector, suspension or abandonment) | | 14 | Raw pressure-time listings for any formation fluid sample tests and production tests | | 15 | The spud date | | 16 | The rig release date | | 17 | What is being used as the depth reference for the well (for example the Kelly bushing or the rig floor) | | 18 | The height of the depth reference above sea level | | 19 | The water depth at the well | | 20 | The measured depth of the well | | 21 | The true vertical depth of the well | | 22 | If applicable, the depth of perforation in the storage formation | | 23 | The date on which the total depth was reached | | 24 | If the well is deviated or horizontal—<br> (a) the surveyed path of the well; and<br> (b) the coordinates of the bottom of the well bore; and<br> (c) if applicable, the coordinates and true vertical depth of the intersection of the well with the storage formation | | 25 | Particulars of equipment and casing installed on or in the well, including schematics | | 26 | If applicable, information on cementing operations and schematics of abandonment | | 27 | Bit records | | 28 | Drilling fluids used | | 29 | Drilling fluid losses | | 30 | List of cores, cuttings and samples taken, and their depths and intervals |