Offshore Petroleum and Greenhouse Gas Storage (Greenhouse Gas Injection and Storage) Regulations 2011
Part 13Information about consultation
Start here
Get a plain-English read of Part 13
Turn the raw legal text into a practical explanation grounded in Offshore Petroleum and Greenhouse Gas Storage (Greenhouse Gas Injection and Storage) Regulations 2011.
Part 13—Information about consultation
13.1 A description of: (a) any consultations that have taken place with stakeholders, including other users of the sea that might be affected by the proposed operations; and (b) the outcomes of the consultations. 13.2 A suitable strategy for consultation with stakeholders to establish mechanisms for interaction with stakeholders over the life of the operations.
Schedule 3—Information in summary of site plan
(subregulation 3.6(1))
1 A short description of: (a) the project; and (b) the size of its footprint; and (c) the schedule for carrying on the project. 2 The project’s location, including: (a) the latitude and longitude; and (b) the distance of the location from the nearest point of the Australian mainland; and (c) the distance of the location from the nearest Australian town and the nearest Australian capital city. 3 A description of the title. 4 The name of each current titleholder. 5 For the project: (a) its storage capacity; and (b) the proposed injection amount and the period of injection for each greenhouse gas substance to be injected; and (c) the number and location of the proposed injection wells. 6 Details of the proposed monitoring program that will verify plume behaviour.