Offshore Electricity Infrastructure Regulations 2022
86Plan must include information about design notification
Start here
Get a plain-English read of 86
Turn the raw legal text into a practical explanation grounded in Offshore Electricity Infrastructure Regulations 2022.
86 Plan must include information about design notification
(1) If the licence holder has given the Regulator a design notification in relation to the relevant licence, the plan must: (a) set out any feedback provided by the Regulator on the design notification; and (b) describe how the feedback has been addressed by the licence holder; and (c) state whether or not the way the offshore infrastructure project is being carried out, or is to be carried out, under the relevant licence is broadly consistent with the design notification; and (d) if the way the offshore infrastructure project is being carried out, or is to be carried out, under the relevant licence is not broadly consistent with the design notification—identify the extent of the inconsistencies and evaluate and describe how the inconsistencies have affected the offshore infrastructure project. (2) If the Regulator gave feedback on the design notification, the Regulator may only approve the plan if the Regulator is satisfied that the licence holder has adequately addressed the feedback.