80Plan must describe activities and operations
Start here
Get a plain-English read of 80
Turn the raw legal text into a practical explanation grounded in Offshore Electricity Infrastructure Regulations 2022.
80 Plan must describe activities and operations
(1) The plan must: (a) describe the environment, including the physical environment and the general operating conditions, for the licence activities; and (b) specify the location or locations of the licence activities; and (c) include details of the layout of all licence infrastructure; and (d) include an outline of the operational details of the licence activities. (2) The plan must: (a) include a timetable for the licence activities; and (b) require the licence holder to notify the Regulator at least 30 days (or another period agreed between the Regulator and the licence holder) before a licence activity specified in the timetable is to commence; and (c) require the licence holder to notify the Regulator no more than 30 days (or another period agreed between the Regulator and the licence holder) after a licence activity specified in the timetable has been completed.