National Greenhouse and Energy Reporting (Measurement) Determination 2008
Div 42.1—Cement clinker production
Start here
Get a plain-English read of Div 4
Turn the raw legal text into a practical explanation grounded in National Greenhouse and Energy Reporting (Measurement) Determination 2008.
Division 4.2.1—Cement clinker production
4.2 Application
4.3 Available methods
4.4 Method 1—cement clinker production
4.5 Method 2—cement clinker production
4.6 General requirements for sampling cement clinker
4.7 General requirements for analysing cement clinker
4.8 Method 3—cement clinker production
4.9 General requirements for sampling carbonates
4.10 General requirements for analysing carbonates
Division 4.2.2—Lime production
4.11 Application
4.12 Available methods
4.13 Method 1—lime production
4.14 Method 2—lime production
4.15 General requirements for sampling
4.16 General requirements for analysis of lime
4.17 Method 3—lime production
4.18 General requirements for sampling
4.19 General requirements for analysis of carbonates
Division 4.2.3—Use of carbonates for production of a product other than cement clinker, lime or soda ash
4.20 Application
4.21 Available methods
4.22 Method 1—product other than cement clinker, lime or soda ash
4.22A Method 1A—product other than cement clinker, lime or soda ash for use of carbonates in clay materials
4.23 Method 3—product other than cement clinker, lime or soda ash
4.23A Method 3A—product other than cement clinker, lime or soda ash for use of carbonates in clay materials
4.23B General requirements for sampling clay material
4.23C General requirements for analysing clay material
4.24 General requirements for sampling carbonates
4.25 General requirements for analysis of carbonates
Division 4.2.4—Soda ash use and production
4.26 Application
4.27 Outline of Division