National Electricity (Victoria) Act 2005
33MContent of REZ scheme authority
Start here
Get a plain-English read of 33M
Turn the raw legal text into a practical explanation grounded in National Electricity (Victoria) Act 2005.
33M Content of REZ scheme authority
(1) A REZ scheme authority must—
(a) specify—
(i) the renewable energy zone within which the REZ scheme authority holder wishes to establish a connection to the declared transmission system for an eligible generating system or eligible integrated resource system; or
(ii) the renewable energy zone within which an eligible generating system or eligible integrated resource system, forming part of the applicable eligible facility, is connected to the declared transmission system; and
(b) if the REZ scheme authority holder is wishing to establish a connection to the declared transmission system for an eligible generating system or eligible integrated resource system, specify—
(i) the kind of generating system or integrated resource system for which the connection is to be established; and
(ii) the nameplate rating of the generating system or integrated resource system; and
(c) if the REZ scheme authority holder is the owner, operator or controller of a facility connected to the declared transmission system—
(i) specify the kind of facility it is; and
(ii) describe the system change the holder wishes to carry out; and
(iii) specify the nameplate rating of the facility before and after the carrying out of the system change; and
(d) set out any conditions determined by VicGrid.
***applicable eligible facility*** means the eligible facility in respect of which the REZ scheme authority holder is wishing to carry out the system change.
S. 33N inserted by No. 38/2025 s. 33.