26J
26J
The methodology known as “total factor productivity”—
(a) as a regulatory economic methodology to be applied by the AER for the purpose of—
(i) making a distribution determination or transmission determination; or
(ii) amending a distribution determination or transmission determination; or
(iii) making an access determination;
(b) as an economic regulatory tool to inform and assist the AER in applying, or analysing the application of the regulatory economic methodology known as the “building block approach” by the AER for the purpose of—
(i) making a distribution determination or transmission determination; or
(ii) amending a distribution determination or transmission determination; or
(iii) making an access determination.