National Electricity (NSW) Law
14PObligation to report net contract position
Start here
Get a plain-English read of 14P
Turn the raw legal text into a practical explanation grounded in National Electricity (NSW) Law.
14P Obligation to report net contract position
14P Obligation to report net contract position
(1) The liable entity must give the AER a report about the liable entity’s net contract position for the stated trading intervals during the reliability gap period as at the contract position day—
(a) that complies with subsection (2); and
(b) on or before the reporting day stated in the T-1 reliability instrument.
Note—
Subsection (1) is a civil penalty provision: See the definition of “civil penalty provision” in section 2AA(1).
(2) The report must—
(a) include the information required under the Rules; and
(b) be prepared and given in the manner and form required by the Rules.
(3) The liable entity must not provide information in a report the liable entity knows is false or misleading in a material particular.
Note—
Subsection (3) is a civil penalty provision: See the definition of “civil penalty provision” in section 2AA(1).
s 14P: Ins 2019 No 10, sec 7.