National Electricity (New South Wales) Regulation 2022
In ForceNSW
Jurisdiction
New South Wales
Act Number
498 of 2022
Collection
regulation
Plain English Summary
6/10 complexity
This Regulation repeals the 2015 NSW instrument and amends the National Electricity Rules to: exempt lessors of transacted distribution/transmission systems from Network Service Provider registration while a lease runs; retarget transitional references for TransGrid; declare certain Ausgrid, Essential Energy and Endeavour Energy distribution-based stand‑alone power systems as regulated; require the Minister to appoint a financial vehicle; and add specified cost‑pass‑through events tied to strategic benefit payments. It affects network owners, service providers, lessees and the Minister by changing registration duties, cost‑recovery triggers and ministerial appointment powers.
This Regulation replaces the National Electricity (New South Wales) Regulation 2015 and makes a small number of targeted amendments to the interaction between New South Wales law and the National Electricity Rules (NER). The mechanical changes are these.
Commencement and repeal. The Regulation commences on publication on the NSW legislation website and expressly repeals the 2015 Regulation, while saving existing acts, matters and things that had effect immediately before repeal (commencement and repeal provisions, ss 2 and 6). The saving clause preserves continuity of legal effect from the old regulation to the new one (s 6(2)).
Definitions. The Regulation defines “the Act” to mean the National Electricity (New South Wales) Act 1997 for interpretive convenience (s 3). It also notes relevant interpretive material remains in the Act and the Interpretation Act 1987 (s 3 note).
Modification of the NER , registration exemption for certain lessors. The Regulation inserts a new rule 9.12.5 into the NER (as applied for the purposes of the Act). That rule provides that the lessor of a transacted distribution or transmission system under a lease is, while the lease is in force, exempt from complying with clause 2.5.1 “in relation to the activity of owning the distribution system or transmission system” (s 4, new rule 9.12.5(a)). The term “transacted distribution system” and “transacted transmission system” are defined by reference to the Electricity Network Assets (Authorised Transactions) Act 2015 (s 4, new rule 9.12.5(b)).
Modification of the NER , transitional arrangement for TransGrid. The Regulation amends Chapter 9, Part B, clause 9.14.1 of the NER by replacing the name “TransGrid” with “the transmission system operator”, renumbering the clause and inserting a definition that “transmission system operator” means the Network Service Provider that operates a transmission system that is a transacted transmission system under the Electricity Network Assets (Authorised Transactions) Act 2015 (s 5).
Current sections
Direct links to the current provisions in National Electricity (New South Wales) Regulation 2022.
The Act and the Interpretation Act 1987 contain definitions and other provisions that affect the interpretation and application of this Regulation.
4
Modification of National Electricity Rules—registration as Network Service Provider
4 Modification of National Electricity Rules—registration as Network Service Provider
4 Modification of National Electricity Rules—registration as Network Service Provider
For the Act, section 9(2)(a), the National Electricity Rules are modified by inserting the following clause after Chapter 9, Part B, rule 9.12, clause 9.12.4—
5
Modification of National Electricity Rules—transitional arrangements for TransGrid
5 Modification of National Electricity Rules—transitional arrangements for TransGrid
5 Modification of National Electricity Rules—transitional arrangements for TransGrid
For the Act, section 9(2)(b), the National Electricity Rules are modified as follows—
(a) omit “TransGrid” from Chapter 9, Part B, clause 9.14.1 and insert instead “the transmission system operator”,
5A Regulated stand-alone power systems—the Act, s 8A
5A Regulated stand-alone power systems—the Act, s 8A
For the National Electricity (NSW) Law, section 6B, a stand-alone power system consisting of a distribution system owned, controlled or operated, or proposed to be owned, controlled or operated, by Ausgrid, Essential Energy or Endeavour Energy is a regulated stand-alone power system.
s 5A: Ins 2022 (711), sec 3.
5B
Application of National Electricity (NSW) Law, Part 8AA—the Act, s 8A
5B Application of National Electricity (NSW) Law, Part 8AA—the Act, s 8A
5B Application of National Electricity (NSW) Law, Part 8AA—the Act, s 8A
For the National Electricity (NSW) Law, section 118AS(1), the financial vehicle must be established by the Minister appointing as the financial vehicle the person or body the Minister is satisfied is appropriate to undertake the functions of the financial vehicle.
s 5C: Ins 2025 (603), Sch 1.
5D
Modification of National Electricity Rules—cost pass through
5D Modification of National Electricity Rules—cost pass through
5D Modification of National Electricity Rules—cost pass through
For the Act, section 9(3), the National Electricity Rules are modified as follows—
(a) omit “and” from Chapter 6A, Part C, rule 6A.7, clause 6A.7.3(a1)(4),
(b) insert after clause 6A.7.3(a1)(4)—
(4a) an event requiring an increase or decrease in the amount of a strategic benefit payment under the Electricity Supply Act 1995, as a result of—
(i) a back payment arrangement following a new determination of native title within the meaning of the Native Title Act 1993 of the Commonwealth; or
(iii) a person becoming, or ceasing to be, an Eligible Owner of Affected Land Title within the meaning of the strategic benefit payment guidelines issued under the Electricity Supply Act 1995, Schedule 2, clause 6(2)(i)(i); and
(c) insert after clause 6A.7.3(a)—
(b1) For paragraph (a), a pass through event under subparagraph (a1)(4a) is taken to be a positive change event if it is an event which entails the Transmission Network Service Provider incurring higher costs in providing prescribed transmission services than the provider would have incurred but for the event, even if the costs are not materially higher, but does not include a contingent project and the contingent project’s associated trigger event.
(d) insert after clause 6A.7.3(b)—
(c1) For paragraph (b), a pass through event under subparagraph (a1)(4a) is taken to be a negative change event if it is an event which entails the Transmission Network Service Provider incurring lower costs in providing prescribed transmission services than the provider would have incurred but for the event, even if the costs are not materially lower.
This Regulation is the National Electricity (New South Wales) Regulation 2022.
2 Commencement
2 Commencement
2 Commencement
This Regulation commences on the day on which it is published on the NSW legislation website.
Note—
This Regulation repeals and replaces the National Electricity (New South Wales) Regulation 2015, which would otherwise be repealed on 1 September 2022 by the Subordinate Legislation Act 1989, section 10(2).
3 Definition
3 Definition
3 Definition
In this Regulation—
the Act means the National Electricity (New South Wales) Act 1997.
Note—
The Act and the Interpretation Act 1987 contain definitions and other provisions that affect the interpretation and application of this Regulation.
4 Modification of National Electricity Rules—registration as Network Service Provider
4 Modification of National Electricity Rules—registration as Network Service Provider
4 Modification of National Electricity Rules—registration as Network Service Provider
For the Act, section 9(2)(a), the National Electricity Rules are modified by inserting the following clause after Chapter 9, Part B, rule 9.12, clause 9.12.4—
4 Registration as a Network Service Provider
4 Registration as a Network Service Provider
9.12.5 Registration as a Network Service Provider
(a) The lessor of a transacted distribution system or transacted transmission system under a lease is, while the lease is in force, exempt from complying with clause 2.5.1 in relation to the activity of owning the distribution system or transmission system.
(b) In this clause—
transacted distribution system means a transacted distribution system under the Electricity Network Assets (Authorised Transactions) Act 2015.
transacted transmission system means a transacted transmission system under the .
Regulated stand-alone power systems. The Regulation makes a New South Wales Law-level declaration that, for the National Electricity (NSW) Law s 6B, a stand-alone power system consisting of a distribution system owned, controlled or operated, or proposed to be owned, controlled or operated, by Ausgrid, Essential Energy or Endeavour Energy is a “regulated stand-alone power system” (s 5A). The provision is expressed as an insertion and identifies the entities by name.
Application of Part 8AA. The Regulation provides that Part 8AA of the National Electricity (NSW) Law will apply in full in the State from the date the National Electricity (New South Wales) Amendment (Orderly Exit Management Framework Opt-in) Regulation 2025 commences (s 5B). The commencement of that application is therefore conditional on the 2025 Regulation’s commencement.
Financial vehicle appointment. The Regulation adds that, for the purpose of National Electricity (NSW) Law s 118AS(1), the financial vehicle must be established by the Minister appointing as the financial vehicle the person or body the Minister is satisfied is appropriate to undertake the functions of the financial vehicle (s 5C). That is, the Minister must make the appointment and must be satisfied as to appropriateness.
Cost pass-through modification for strategic benefit payments. The Regulation modifies the NER’s pass-through rules in Chapter 6A, Part C, rule 6A.7 by adding a specific pass-through event tied to strategic benefit payment changes under the Electricity Supply Act 1995 caused by back payment arrangements following native title or Aboriginal land rights determinations or changes in eligible owner status (s 5D). It further classifies such a pass-through event as a positive or negative change event for pass-through purposes even if the costs are not materially higher or lower, and excludes contingent projects and their trigger events from this definition (s 5D).
The Regulation therefore operates largely by targeted textual modification of the NER (as applied under the Act and the National Electricity (NSW) Law) and by providing NSW-specific characterisations (regulated stand-alone power systems), ministerial appointment requirements for a financial vehicle, and specified cost pass-through treatment for strategic benefit payment adjustments.
Main concepts
The instrument is short and built on a handful of linked concepts. The key legal and regulatory concepts the Regulation operates through are these.
Modifying the National Electricity Rules as applied in New South Wales. The Regulation uses the State’s power to modify the NER for the purposes of the National Electricity (New South Wales) Act 1997 (the Act). Multiple provisions are introduced as "For the Act, section 9(2)(a)" or similar, which signals that the Regulation’s substantive effect is to change how the NER operates within NSW by textual insertion and substitution (see ss 4, 5, 5D).
Exemption from registration obligations (ownership activity). The new NER clause 9.12.5 creates an exemption that is strictly framed: the exemption applies to the lessor of a transacted distribution or transmission system under a lease, and it is limited to the activity of owning the distribution or transmission system (s 4, new 9.12.5(a)). The exemption is temporal , it lasts only while the lease is in force.
Definition by reference to another NSW Act. The exemption and the replacement definitions hinge on whether an asset is a "transacted distribution system" or a "transacted transmission system", defined by reference to the Electricity Network Assets (Authorised Transactions) Act 2015 (s 4, new 9.12.5(b); s 5 definition of transmission system operator). The Regulation therefore links NER treatment to a classification established by separate NSW law.
Transitional textual change to accommodate a new operator label. The text replacement in clause 9.14.1 substitutes “TransGrid” with “the transmission system operator”, and explicitly defines that operator by reference to a transacted transmission system under the Electricity Network Assets Act 2015 (s 5). This is a textual, transitional device to preserve the operation of the rule after asset transactions.
State-level designation of regulated stand-alone power systems. Section 5A adds a specific State-level designation, tying regulatory status for Part 8AA of the National Electricity (NSW) Law to stand-alone power systems that are distribution systems owned, controlled or operated by Ausgrid, Essential Energy or Endeavour Energy (s 5A). The concept centralises regulatory coverage of particular stand-alone systems by naming owners/operators.
Temporal link for application of Part 8AA. Section 5B sets a temporal condition: Part 8AA of the National Electricity (NSW) Law will apply in full in the State on and from the date a later NSW Regulation (the 2025 Opt-in regulation) commences (s 5B). The Regulation therefore defers operation of Part 8AA until a separate instrument takes effect.
Ministerial appointment as establishment mechanism. The Regulation prescribes that the financial vehicle required under National Electricity (NSW) Law s 118AS(1) must be established by Ministerial appointment of the person or body the Minister is satisfied is appropriate (s 5C). The concept is direct ministerial empowerment to determine the vehicle.
Specificity in pass-through cost events. Section 5D creates a tailored pass-through event linked to strategic benefit payments under the Electricity Supply Act 1995 triggered by particular historical back-payment arrangements connected to native title or Aboriginal land rights outcomes, or changes in eligible owner status. That event is to be treated as a positive or negative change event for pass-through purposes even if the cost change is not material, and contingent projects/triggers are excluded (s 5D).
These concepts are textual and prescriptive. The Regulation does not create a broad new regulatory regime; rather it amends the NER as it applies in NSW and inserts NSW-specific definitions and ministerial powers. The primary mechanisms are exemption (an ownership-registration exemption for lessors), substitution/definition (replacing “TransGrid” and defining “transmission system operator”), ministerial appointment and the adjustment of the pass-through taxonomy for a narrow class of strategic benefit payment events.
Who it affects
Identify the persons and entities the Regulation directly names or reaches, and the immediate consequences for their regulatory position.
Lessors of transacted distribution or transmission systems. The Regulation grants an explicit exemption to "the lessor of a transacted distribution system or transacted transmission system under a lease" from complying with clause 2.5.1 of the NER in relation to the activity of owning the relevant system, while the lease is in force (s 4, new rule 9.12.5(a)). The text therefore directly affects lessors in leasing arrangements covered by the Electricity Network Assets (Authorised Transactions) Act 2015.
Network Service Providers that operate a transacted transmission system. By replacing "TransGrid" with "the transmission system operator" and defining that term to mean the Network Service Provider that operates the transmission system that is a transacted transmission system under the Electricity Network Assets (Authorised Transactions) Act 2015, the Regulation affects whichever NSP becomes the operator of such a transacted transmission system (s 5).
Ausgrid, Essential Energy and Endeavour Energy. The Regulation expressly names these three distributors as owners/operators/proposed owners/operators of distribution systems that, when consisting of a stand-alone power system, are a “regulated stand-alone power system” for the purposes of National Electricity (NSW) Law s 6B (s 5A). That designation directly places those particular systems within regulated stand-alone power system status under NSW law.
Transmission Network Service Providers (TNSPs) with prescribed transmission services exposure to strategic benefit payments. Section 5D modifies the NER pass-through rules expressly for the Transmission Network Service Provider context, by adding a pass-through event tied to strategic benefit payments under the Electricity Supply Act 1995 and prescribing its classification (s 5D). This directly affects any Transmission Network Service Provider that may incur or recover costs due to back payments or changes described in that provision.
The Minister (executive decision-maker). Section 5C requires the financial vehicle to be established by the Minister appointing a person or body the Minister is satisfied is appropriate to perform the vehicle’s functions. That provision directly places the decision-making power with the Minister and affects persons or bodies who may be considered and appointed as the financial vehicle.
Market bodies and compliance administrators by implication. The Regulation’s textual modifications to the NER will alter the duties and exemptions that market participants and compliance administrators must apply. For example, the registration exemption for lessors will change who is required to comply with clause 2.5.1 in the relevant ownership context (s 4).
Parties with interests in strategic benefit payment arrangements. The pass-through modification (s 5D) refers to strategic benefit payments under the Electricity Supply Act 1995 including eligible owner changes and back payment arrangements following determinations/grants in native title or Aboriginal land rights contexts. Owners of affected land title and persons who may become or cease to be Eligible Owners under the strategic benefit payment guidelines are referenced; such classes are implicated indirectly by changing how associated payments may be treated in transmission pass-through events (s 5D).
Who is not directly changed. The Regulation does not, on its face, create new general obligations for consumers, nor does it create new criminal offences or a new licensing regime in this text. It achieves its effects by modifying which entities are subject to particular NER clauses and by defining how certain events must be treated for pass-through purposes. The Regulation therefore primarily affects specified industry participants, named distributor-owners of stand-alone systems, the Minister’s appointment power for a financial vehicle, and Transmission Network Service Providers in relation to strategic benefit payment adjustments.
Key duties and rights
Set out the principal legal duties, rights or exemptions created by the Regulation and the precise scope of those changes as written.
Exemption for lessors from clause 2.5.1 ownership registration. The Regulation inserts NER rule 9.12.5 which states that the lessor of a transacted distribution system or transacted transmission system under a lease is, while the lease is in force, exempt from complying with clause 2.5.1 "in relation to the activity of owning the distribution system or transmission system" (s 4, new 9.12.5(a)). The duty (to comply with clause 2.5.1) is therefore removed for lessors in that specific ownership activity and only for the lease duration. The provision must be read alongside clause 2.5.1 itself in the NER to determine the full content of the removed obligation, but the Regulation makes the exemption unconditional beyond the stated temporal and asset-type limits.
Defined terms tied to an NSW Act. New 9.12.5(b) defines “transacted distribution system” and “transacted transmission system” by direct reference to the Electricity Network Assets (Authorised Transactions) Act 2015. The right to the exemption therefore depends on classification under that separate NSW statute (s 4, new 9.12.5(b)). Effectively, this delegates part of the eligibility-test for the exemption to the statutory labelling produced by the Authorised Transactions Act.
Replacement and definition of the transmission system operator. Section 5 effects a substitutional duty/right change in the NER by replacing the entity name “TransGrid” with a defined “transmission system operator” and defining that operator as the Network Service Provider that operates the transacted transmission system under the Electricity Network Assets (Authorised Transactions) Act 2015. This alters who is the subject of whatever duties and rights in clause 9.14.1 previously applied to “TransGrid” (s 5).
Designation of regulated stand-alone power systems. Section 5A makes a specific designation: for the National Electricity (NSW) Law s 6B, a stand-alone power system consisting of a distribution system owned, controlled or operated, or proposed to be owned, controlled or operated, by Ausgrid, Essential Energy or Endeavour Energy is a "regulated stand-alone power system". The duty and regulatory status that flow from the National Electricity (NSW) Law s 6B therefore attach to such systems by this provision. The insertion places those systems under the regulatory construct of a "regulated stand-alone power system".
Application of Part 8AA conditional on later regulation. Section 5B instructs that Part 8AA of the National Electricity (NSW) Law applies in full in the State from the date the 2025 Opt-in Regulation commences. The right and duty framework in Part 8AA will therefore govern the relevant entities from that date forward. Until that later instrument commences, Part 8AA does not automatically apply in full under this Regulation; it is conditional (s 5B).
Minister’s appointment duty for the financial vehicle. Section 5C prescribes how the financial vehicle required by National Electricity (NSW) Law s 118AS(1) must be established: by the Minister appointing as financial vehicle the person or body the Minister is satisfied is appropriate to undertake the functions. The duty to establish the financial vehicle rests with the Minister and includes a satisfaction standard , the Minister must be satisfied as to the appropriateness of the appointee (s 5C).
Pass-through classification for strategic benefit payment events. Section 5D inserts subparagraphs into the NER pass-through framework that identify a specific class of pass-through event: an event requiring an increase or decrease in the amount of a strategic benefit payment under the Electricity Supply Act 1995 as a result of (i) a back payment arrangement following a new determination of native title, (ii) a back payment arrangement following a new grant under the Aboriginal Land Rights Act 1983, or (iii) a person becoming/ceasing to be an Eligible Owner under the strategic benefit payment guidelines (s 5D). It then prescribes that such an event is to be treated as a positive change event for pass-through purposes if it entails higher costs for the TNSP than would otherwise have been incurred, even if the costs are not materially higher, and similarly as a negative change event if it entails lower costs, again even if not materially lower. The provision also excludes contingent projects and their triggers from that pass-through event definition (s 5D).
Continuity and saving. Section 6(2) states that acts, matters or things that had effect under the 2015 Regulation immediately before repeal continue to have effect under this Regulation. That creates a transitional continuity right/duty that preserves existing legal states.
What the Regulation does not do in express terms. It does not create new licensing regimes, criminal penalties, or detailed operational obligations beyond the specified NER modifications and NSW Law designations. It does not itself set out procedural rules for the Minister’s satisfaction process, nor does it set out the NER clause 2.5.1 text or the detailed pass-through claim procedures , it amends and re-labels existing frameworks.
Penalties and enforcement
The Regulation contains no independent penalty schedule, infringement scheme, or bespoke enforcement mechanisms. The instrument operates primarily by textual modification of the National Electricity Rules as those rules apply in New South Wales and by making certain statutory designations and ministerial appointment requirements. The immediate enforcement consequences flow from how those modified provisions sit within the existing enforcement architecture of the Act and the NER rather than from the Regulation itself.
No new offence or monetary penalty in the Regulation text. A careful reading of the Regulation reveals no clauses that create offences, fines or criminal sanctions. The Regulation achieves its effect by amending the NER (ss 4, 5, 5D) and making or confirming certain State-law classifications (ss 5A-5C).
Enforcement therefore remains within the Act and the NER frameworks. Because the Regulation modifies the NER as it applies under the Act (see ss 4 and 5 where the modifications are expressly prefaced "For the Act"), any compliance obligations, sanctions for non-compliance, dispute resolution or review mechanisms available for the NER and under the Act remain the operative enforcement routes. The Regulation does not displace or restate those mechanisms; it changes the substantive duties to which they apply.
Ministerial discretion and potential judicial review. Section 5C gives the Minister the decision-making power to appoint the financial vehicle, with a statutory satisfaction threshold. While the Regulation does not specify procedures or criteria for this satisfaction, such a Ministerial decision will be an exercise of public power and therefore may be amenable to administrative law processes under general public law principles. The Regulation itself does not set out review or appeal avenues specific to the appointment.
Pass-through claims remain subject to NER processes. The 6A.7 pass-through modifications (s 5D) change the taxonomy of eligible pass-through events and how they are classified as positive or negative change events. The practical effect on enforcement of revenue allowance or cost recovery will be processed through the NER’s existing cost-pass-through procedures. The Regulation does not create new procedural enforcement steps for pass-through claims, nor does it set time limits or evidentiary standards in the text added.
Transitional continuity. The repeal and savings clause (s 6) preserves the effect of prior acts, matters and things that had effect under the 2015 Regulation. That means enforcement actions properly begun or rights/obligations in force immediately before repeal will continue under the new Regulation’s legal framework.
Administrative bodies and market operators. The Regulation’s amendments will change the duties administrative bodies enforce. For example, exemption of lessors from clause 2.5.1 as to ownership will alter registration and compliance checks that a market operator, registrar or regulator performs. The Regulation does not itself specify how regulatory agencies should transition their compliance systems; that is left to the administering bodies and the underlying enforcement law.
In short, the Regulation does not add new penalty mechanisms; it alters substantive duties within an existing enforcement regime. Anyone concerned with enforcement consequences should consult the Act and the relevant NER provisions (including clause 2.5.1 and the modified clauses) to determine which sanctions and compliance processes apply to the obligations as now framed.
How it interacts with other laws
The Regulation expressly interlocks with multiple other statutes and the National Electricity Rules. The text makes several dependencies explicit by cross-reference or by defining terms with reference to other Acts. These are the principal interactions to note.
Interaction with the National Electricity (New South Wales) Act 1997. The Regulation is made “for the Act” in many of its operative clauses (see ss 4, 5, 5D). It uses the Act’s power to modify the NER as applied in NSW. The definition section (s 3) explicitly states that “the Act” means the National Electricity (New South Wales) Act 1997 and flags that the Act contains further definitions and interpretive provisions affecting application of the Regulation (s 3 note). The Regulation therefore functions as subordinate legislation under and in aid of the Act.
Direct textual changes to the National Electricity Rules. Multiple clauses insert, omit and renumber content within the NER (ss 4, 5, 5D). Those changes apply to how the NER operates in NSW; the Regulation does not amend the Commonwealth NER per se but modifies the NER as it applies for the purposes of the NSW Act. Readers should therefore understand the Regulation as an exercise of state-level modification or adaptation of the NER modalities.
Electricity Network Assets (Authorised Transactions) Act 2015. The exemption for lessors and the replacement definition of "transmission system operator" hinge on whether an asset is a "transacted distribution system" or "transacted transmission system" under the Electricity Network Assets (Authorised Transactions) Act 2015 (ss 4(b), 5(c)). Those definitions are not set out in the Regulation but are referenced as the determinative classification. The status created by that authorised-transactions Act therefore controls eligibility for the exemption and the identity of the transmission system operator.
Electricity Supply Act 1995 and Aboriginal/native title legislation. Section 5D modifies pass-through rules to capture events that require changes in strategic benefit payments under the Electricity Supply Act 1995 as a result of back payment arrangements following a new native title determination (Native Title Act 1993 of the Commonwealth) or a new grant under the Aboriginal Land Rights Act 1983, or a person becoming/ceasing to be an Eligible Owner under the strategic benefit payment guidelines in the Electricity Supply Act 1995 (s 5D). The pass-through provision therefore draws on processes and determinations under Commonwealth native title law and the NSW Aboriginal Land Rights Act to define eligible pass-through events. The Regulation itself does not alter those Acts but makes their outputs relevant to cost-pass-through entitlement.
National Electricity (NSW) Law Part 8AA. Section 5B makes the operation of Part 8AA of the National Electricity (NSW) Law contingent on the commencement of a later NSW regulation (the 2025 Opt-in Regulation). The Regulation therefore links its effect to the separate instrument that implements an opt-in for an “Orderly Exit Management Framework”. The timing and legal consequences of applying Part 8AA are therefore dependent on that other regulation.
Ministerial appointment under National Electricity (NSW) Law s 118AS(1). Section 5C prescribes the manner of establishment of the financial vehicle required by National Electricity (NSW) Law s 118AS(1): the Minister must appoint the person or body. Thus, the Regulation interacts with the governance and institutional provisions of the National Electricity (NSW) Law and delegates establishment mechanics to the Minister rather than prescribing a fixed corporate or statutory vehicle.
Continuity with the repealed 2015 Regulation. Section 6 repeals the 2015 Regulation but preserves its existing effects immediately before repeal. This creates an interaction in time: past acts/rights continue in force under the new Regulation, but future application is governed by the new text.
Overall, the Regulation operates as a connecting tissue between the NSW Act, the NER as applied in NSW, and several other NSW and Commonwealth Acts that determine asset classification, land rights outcomes, and strategic benefit payment obligations. Its legal operation is therefore contingent on the outputs of those other statutes and instruments and on the Minister’s exercise of appointment discretion where required.
Amendment history
The Regulation records limited historical annotations within the text. The embedded notes indicate when certain sections were inserted and identify the repeal of the prior Regulation. The operative amendment timeline visible in the text is as follows.
Initial repeal and replacement. The Regulation replaces the National Electricity (New South Wales) Regulation 2015. The commencement provision (s 2) notes the Regulation repeals and replaces the 2015 Regulation that would otherwise have been repealed on 1 September 2022 by operation of the Subordinate Legislation Act 1989, s 10(2). Section 6(1) states that the 2015 Regulation is repealed.
Insertions and later amendments captured in marginal notes. Several provisions include marginal-style annotations indicating the source and year of insertion:
Section 5A is recorded as inserted in 2022, with the marginal note "Ins 2022 (711), sec 3." That indicates the stand-alone power system designation was added in 2022.
Section 5B and 5C carry the marginal note "Ins 2025 (603), Sch 1." That indicates those provisions were inserted in 2025 by regulation number 603, Schedule 1.
Section 5D carries the marginal note "Ins 2026 (113), Sch 4." That indicates the cost pass-through modification was inserted in 2026 by regulation 113, Schedule 4.
Timing notes within provisions. Section 5B ties the application of Part 8AA of the National Electricity (NSW) Law to the commencement date of the 2025 Opt-in Regulation. That creates a conditional effective date for that interaction, placing the actual operational start of Part 8AA in the hands of a later instrument.
Retention of prior effects. Section 6(2) saves acts, matters or things that had effect under the 2015 Regulation so that their effect continues under the new Regulation. That is an internal transitional saving clause aimed at ensuring continuity.
The text therefore shows a stepwise development: the Regulation replaced the 2015 instrument on publication; later insertions were made in 2022, 2025 and 2026 (as recorded). The Regulation’s marginal annotations identify the statutory instruments and schedules that effected those insertions, but the Regulation does not set out amendment debates, policy development documents or legislative history beyond those insertion notes.
For readers seeking the precise amendment provenance, the Regulation’s notes provide the regulation numbers and years for the insertions: 2022 (Ins 2022 (711)), 2025 (Ins 2025 (603)), and 2026 (Ins 2026 (113)). To trace parliamentary or executive policy material surrounding each insertion, one would need to consult the explanatory memoranda, second-reading speeches or the separate amending regulations referenced by those annotations. The Regulation itself records only the fact and date of insertion.
Litigation history
The Regulation contains no express references to litigation, judicial determinations, or past court challenges. The text does not recount cases, nor does it identify any outstanding or resolved litigation connected to the amendments made. The instrument is a statutory amendment and, within its text, there is no litigation history recorded.
What is demonstrably absent and thus relevant to practitioners:
No cases named or reported within the Regulation. The text names no judicial authorities and does not cite any precedent. The instruments used to create definitions and to modify rules (for example, the Electricity Network Assets (Authorised Transactions) Act 2015, the Electricity Supply Act 1995, Native Title Act 1993, Aboriginal Land Rights Act 1983) are referenced as substantive sources, but no litigation regarding their application or interpretation is mentioned in the Regulation itself.
No transitional litigation provisions. The saving clause (s 6(2)) preserves the effect of acts, matters and things that had effect under the 2015 Regulation immediately before repeal, but the Regulation does not mention how ongoing litigation or disputes should be handled beyond that saving. In practice, the saving clause means that existing rights or proceedings should continue under the new legal framework, but the Regulation does not give procedural detail.
No administrative review or appeals provisions specific to Ministerial appointments or pass-through events. Section 5C confers appointment discretion on the Minister for the financial vehicle, and section 5D prescribes pass-through event treatment. The Regulation does not specify internal review mechanisms or appeal routes for those decisions beyond the existing administrative law remedies that would apply generally.
For a practitioner, the absence of recorded litigation history in the Regulation itself means any judicial interpretation relevant to these amendments must be sourced from case law that interprets the Act, the NER, or the other statutes referenced. The Regulation does not supply that jurisprudence. Where disputes arise , for example, on the meaning of “transacted transmission system” under the Authorised Transactions Act, on whether a given lessor qualifies for the clause 9.12.5 exemption, on the Minister’s appointment process for the financial vehicle, or on the categorisation of a strategic benefit payment event for pass-through purposes , those disputes would be litigated or administratively reviewed under the broader statutory and regulatory frameworks, but the Regulation itself provides no litigation history or precedent.
Gotchas
Practical risks, traps for the unwary, and points that require care because the Regulation’s effects are precise and depend on other instruments.
Exemption is narrowly framed by definition and duration. The lessor exemption in new NER rule 9.12.5 applies only to a lessor of a “transacted distribution system” or “transacted transmission system” under a lease and only “while the lease is in force” (s 4). The qualification by reference to the Electricity Network Assets (Authorised Transactions) Act 2015 means an asset must be classified under that Act to trigger the exemption. A party that assumes a general lessor exemption without confirming the precise statutory classification risks non-compliance with clause 2.5.1 if the asset is not a “transacted” system as defined in that other Act.
The exemption covers “the activity of owning” the system only. The text expressly limits the exemption to compliance with clause 2.5.1 “in relation to the activity of owning the distribution system or transmission system” (s 4, new 9.12.5(a)). It does not say the lessor is exempt from other licensing or registration requirements that might apply to different activities (for example, operation, control, or system planning), and it does not alter other NER obligations. Parties should not treat the exemption as blanket relief from all NER duties.
Reliance on external statutory classification. Because the exemption and the transmission system operator definition point to the Electricity Network Assets (Authorised Transactions) Act 2015, disputes about eligibility or identity will hinge on that separate statute’s application. Practitioners should check the Authorised Transactions Act’s definitions and any related administrative determinations rather than relying solely on this Regulation.
Minister’s appointment power lacks procedural detail. Section 5C requires the Minister to appoint the financial vehicle and to be “satisfied” as to the appropriateness of the appointee. The Regulation does not specify selection criteria, transparency obligations, or timelines. Entities that may be considered for appointment should note there is no procedural or due-process description in the Regulation itself, and should anticipate ministerial discretion and the need to engage with decision-makers early.
Temporal conditions and staged implementation. Section 5B makes the application of Part 8AA contingent upon commencement of a later Opt-in Regulation. That means affected parties must track the separate 2025 regulation’s commencement date to know when Part 8AA will apply “in full” in NSW. Failure to track that linked instrument could result in mis-timing compliance activities or obligations.
Pass-through classification even when cost change is not material. The pass-through change in s 5D declares that specified strategic benefit payment events are to be taken as positive or negative change events for pass-through purposes “even if the costs are not materially higher” (or lower). This is a drafting point of risk for TNSPs and regulators because it can permit pass-through treatment based on the occurrence of those events rather than a materiality test. Parties should note too that contingent projects and their triggers are excluded, which will affect certain project-based pass-through claims.
The Regulation does not alter enforcement clauses or provide procedural rules. Because no new enforcement mechanisms are created and the Regulation modifies existing NER duties, parties should be cautious: compliance obligations should be checked against the Act and the NER, and the Regulation should not be treated as a stand-alone source of compliance procedure.
Continuity of prior arrangements may conceal differences. Section 6(2) saves acts and matters that had effect under the 2015 Regulation. Practitioners handling legacy leases, licences, or rights should review how those saved arrangements interact with the new textual changes; continuity is preserved, but subsequent dealings may be governed by the new rules and definitions.
Named entities and coverage. Section 5A’s designation of regulated stand-alone power systems explicitly names Ausgrid, Essential Energy and Endeavour Energy. If other parties operate similar systems, they are not covered by that specific designation. Relying on an assumption of general coverage for all stand-alone systems would be a mistake.
Cross-jurisdictional linkages (native title and land rights). The pass-through event references native title determinations (Native Title Act 1993, Commonwealth) and grants under the Aboriginal Land Rights Act 1983. Outcomes under those separate Acts will have downstream impacts on pass-through treatment in the NER as modified. Parties dealing with land title issues need to coordinate with the processes under those Acts and not assume the Regulation itself resolves disputes about native title or land grants.
In all these points, the mitigation approach is to read the Regulation alongside the cited statutes and the relevant NER clauses. The Regulation is not self-contained; it delegates eligibility, classification and some decision-making to other legal instruments and to ministerial discretion.
How to comply
Concrete steps, documents to check, and operational actions for the principal parties affected by the Regulation. This is not legal advice but a practical checklist tied to the text of the Regulation.
For lessors of potentially transacted assets (who might rely on the exemption in new NER rule 9.12.5):
Confirm asset status under the Electricity Network Assets (Authorised Transactions) Act 2015. The exemption applies only to “transacted distribution system” or “transacted transmission system” as defined in that Act (s 4, new 9.12.5(b)). Obtain the statutory classification or a written determination showing the asset is a transacted system.
Review your lease to ensure the exemption period aligns with lease duration. The exemption applies only “while the lease is in force” (s 4, new 9.12.5(a)). Document commencement and expiry dates and any renewal options; ensure registration or other obligations are addressed before and after the lease term.
Narrowly scope your compliance review. The exemption is specific to compliance with clause 2.5.1 “in relation to the activity of owning” the system (s 4). Identify other potentially applicable NER obligations or NSW law requirements (operation, control, market participant responsibilities) that are not altered by this exemption.
For Network Service Providers and those who may be designated the transmission system operator:
Determine whether you are the “Network Service Provider that operates the transmission system that is a transacted transmission system under the Electricity Network Assets (Authorised Transactions) Act 2015” (s 5). If so, expect to be treated as the “transmission system operator” for the purposes of clause 9.14.1 as amended.
Review clause 9.14.1 and related NER obligations as they applied formerly to “TransGrid” to understand which duties, rights or transitional arrangements now bind the designated operator.
For Ausgrid, Essential Energy and Endeavour Energy, and their advisers:
Identify stand-alone power systems that consist of a distribution system you own, control or operate, or propose to own, control or operate (s 5A). If such systems exist, they are designated as “regulated stand-alone power systems” for the purposes of National Electricity (NSW) Law s 6B.
Map the regulatory consequences of being a regulated stand-alone power system under s 6B of the National Electricity (NSW) Law. The Regulation designates status; compliance will follow the existing Law’s duties and obligations for regulated stand-alone systems.
For Transmission Network Service Providers and their regulatory teams assessing pass-through claims:
Incorporate the new pass-through event in your pass-through model. Section 5D adds a specific pass-through event tied to changes in strategic benefit payments under the Electricity Supply Act 1995 due to back-payment arrangements following a native title determination, Aboriginal land rights grant, or change in Eligible Owner status. Ensure your cost-recovery framework and claims include these events.
Prepare for the “even if not materially higher/lower” provision. The Regulation prescribes that such a pass-through event is taken to be a positive or negative change event “even if the costs are not materially higher” (or lower) (s 5D). Document the causal connection between the event and cost impact; administrative or regulatory scrutiny will focus on the defined linkage even where quantum is small.
Exclude contingent projects. The Regulation excludes contingent projects and their trigger events from this pass-through treatment (s 5D). Ensure project-based pass-through claims are analysed against the contingent-project definition in the NER to determine whether the exclusion applies.
For the Minister’s office and potential financial vehicle nominees:
Prepare materials to satisfy the Minister’s appointment requirement. Section 5C requires the Minister to appoint the financial vehicle by naming the person or body the Minister is satisfied is appropriate (s 5C). Prospective appointees should prepare governance, capability and risk materials to demonstrate appropriateness.
Establish due diligence and accountability frameworks. Because procedural guidance is not provided, the Minister and nominees should document selection criteria and due diligence steps to demonstrate a considered appointment process.
For market bodies, regulators and compliance units:
Update register and compliance systems. The change to clause 2.5.1 obligations for lessors, the renaming of “TransGrid” to “transmission system operator”, and the new pass-through taxonomy require updates to compliance checklists, registries, and automated validation systems.
Track the commencement of the 2025 Opt-in Regulation. Section 5B makes Part 8AA’s application contingent on the 2025 Opt-in Regulation commencing. Administrators must monitor that instrument’s start date to apply Part 8AA “in full” from that date (s 5B).
For lawyers and transaction teams:
Revisit transaction documentation involving leases of network assets. Ensure that lease language aligns with the statutory classification and the period of exemption, including assignment and termination consequences.
Check continuity with prior arrangements. Because s 6(2) saves actions under the 2015 Regulation, confirm whether existing contracts reference the old Regulation and whether amendments are necessary to reflect the new text.
Recordkeeping and audit trail:
Maintain contemporaneous records demonstrating the statutory classification of assets, the lease term and its in-force status, any pass-through claim documentation (causation and cost impact), and the Ministerial appointment materials. The Regulation relies on cross-references and ministerial satisfaction; documentary evidence will be decisive in any dispute or audit.
In all cases, compliance requires reading the new inserted NER clauses in context with the NER and the cited Acts (Electricity Network Assets (Authorised Transactions) Act 2015; Electricity Supply Act 1995; Native Title Act 1993; Aboriginal Land Rights Act 1983) to determine the full scope of duties and procedural steps. The Regulation modifies labels, exemptions and classifications but leaves procedural and enforcement frameworks to the existing statutory and rule architecture.
5 Modification of National Electricity Rules—transitional arrangements for TransGrid
5 Modification of National Electricity Rules—transitional arrangements for TransGrid
5 Modification of National Electricity Rules—transitional arrangements for TransGrid
For the Act, section 9(2)(b), the National Electricity Rules are modified as follows—
(a) omit “TransGrid” from Chapter 9, Part B, clause 9.14.1 and insert instead “the transmission system operator”,
(b) renumber clause 9.14.1 as clause 9.14.1(a),
(c) insert after clause 9.14.1(a), as renumbered—
(b) In this clause—
transmission system operator means the Network Service Provider that operates the transmission system that is a transacted transmission system under the Electricity Network Assets (Authorised Transactions) Act 2015.
5A Regulated stand-alone power systems—the Act, s 8A
5A Regulated stand-alone power systems—the Act, s 8A
5A Regulated stand-alone power systems—the Act, s 8A
For the National Electricity (NSW) Law, section 6B, a stand-alone power system consisting of a distribution system owned, controlled or operated, or proposed to be owned, controlled or operated, by Ausgrid, Essential Energy or Endeavour Energy is a regulated stand-alone power system.
s 5A: Ins 2022 (711), sec 3.
5B Application of National Electricity (NSW) Law, Part 8AA—the Act, s 8A
5B Application of National Electricity (NSW) Law, Part 8AA—the Act, s 8A
5B Application of National Electricity (NSW) Law, Part 8AA—the Act, s 8A
For the National Electricity (NSW) Law, section 118AB(1), Part 8AA of that law applies in full in the State on and from the date the National Electricity (New South Wales) Amendment (Orderly Exit Management Framework Opt-in) Regulation 2025 commences.
s 5B: Ins 2025 (603), Sch 1.
5C Financial vehicle—the Act, s 8A
5C Financial vehicle—the Act, s 8A
5C Financial vehicle—the Act, s 8A
For the National Electricity (NSW) Law, section 118AS(1), the financial vehicle must be established by the Minister appointing as the financial vehicle the person or body the Minister is satisfied is appropriate to undertake the functions of the financial vehicle.
s 5C: Ins 2025 (603), Sch 1.
5D Modification of National Electricity Rules—cost pass through
5D Modification of National Electricity Rules—cost pass through
5D Modification of National Electricity Rules—cost pass through
For the Act, section 9(3), the National Electricity Rules are modified as follows—
(a) omit “and” from Chapter 6A, Part C, rule 6A.7, clause 6A.7.3(a1)(4),
(b) insert after clause 6A.7.3(a1)(4)—
(4a) an event requiring an increase or decrease in the amount of a strategic benefit payment under the Electricity Supply Act 1995, as a result of—
(i) a back payment arrangement following a new determination of native title within the meaning of the Native Title Act 1993 of the Commonwealth; or
(ii) a back payment arrangement following a new grant under the Aboriginal Land Rights Act 1983; or
(iii) a person becoming, or ceasing to be, an Eligible Owner of Affected Land Title within the meaning of the strategic benefit payment guidelines issued under the Electricity Supply Act 1995, Schedule 2, clause 6(2)(i)(i); and
(c) insert after clause 6A.7.3(a)—
(b1) For paragraph (a), a pass through event under subparagraph (a1)(4a) is taken to be a positive change event if it is an event which entails the Transmission Network Service Provider incurring higher costs in providing prescribed transmission services than the provider would have incurred but for the event, even if the costs are not materially higher, but does not include a contingent project and the contingent project’s associated trigger event.
(d) insert after clause 6A.7.3(b)—
(c1) For paragraph (b), a pass through event under subparagraph (a1)(4a) is taken to be a negative change event if it is an event which entails the Transmission Network Service Provider incurring lower costs in providing prescribed transmission services than the provider would have incurred but for the event, even if the costs are not materially lower.
s 5D: Ins 2026 (113), Sch 4.
6 Repeal and savings
6 Repeal and savings
6 Repeal and savings
(1) The National Electricity (New South Wales) Regulation 2015 is repealed.
(2) An act, matter or thing that, immediately before the repeal of the National Electricity (New South Wales) Regulation 2015, had effect under that Regulation continues to have effect under this Regulation.