National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (Miscellaneous Provisions) Transitional Rules 2024
In Force
CTH
Jurisdiction
Commonwealth
Collection
legislative instrument
Plain English Summary
6/10 complexity
This instrument makes short-term, transitional adjustments to how parts of the NDIS Act apply while replacement rules are developed. It limits when the Agency can treat misused NDIS payments as recoverable debt, relaxes claim requirements for certain recurring transport payments (with a fortnightly cap), and requires the CEO to satisfy a ‘most appropriately funded by the NDIS’ test for supports in certain old plans. It affects NDIS providers, self-managing participants, plan nominees and the Agency’s enforcement and planning decisions.
This instrument is a transitional rules instrument titled the National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (Miscellaneous Provisions) Transitional Rules 2024 (the instrument). It is made under item 138 of Schedule 1 to the National Disability Insurance Scheme Amendment (Getting the NDIS Back on Track No. 1) Act 2024 (the amending Act) (s 3). The instrument declares that expressions defined in the National Disability Insurance Scheme Act 2013 (NDIS Act) carry the same meanings in the instrument (s 4(2)). It therefore operates as a focused set of transitional adjustments to how specific provisions of the NDIS Act and associated rules apply immediately after commencement of Schedule 1 to the amending Act.
Mechanically, the instrument does three primary things:
It modifies enforcement of debts arising from a person’s failure to comply with paragraph 46(1)(a) of the NDIS Act (the requirement to spend NDIS amounts only on NDIS supports) for a defined transitional period, by suspending the operation of subsection 182(3) of the NDIS Act in many cases during that period, subject to two narrow exceptions (s 5(1)-(2)).
It removes the operation of section 45A of the NDIS Act, as in force after commencement, for certain transport-related payments under both old framework plans and some payments under new framework plans (including a per‑fortnight cap of $132.58 for private vehicle transport payments to certain payees) (s 6(1), (1A), (2)).
It prescribes how the CEO must treat statements of participant supports in an old framework plan approved or varied during a defined transitional window, by requiring the CEO to be satisfied that each support is “most appropriately funded or provided through the National Disability Insurance Scheme” and by obliging the CEO to apply methods, criteria and matters that were prescribed under s 34(2) of the NDIS Act immediately before commencement (s 7(1)-(5)).
These are transitional rules. The instrument is intentionally limited in scope: it operates with specific timing and thresholds, invokes definitions and rulemaking references in the NDIS Act, and preserves the use of pre‑existing NDIS rules for decision criteria during the transitional period (s 4, s 7(4)). The instrument does not itself create new penalty regimes; it adjusts how certain existing NDIS Act provisions apply during specified transitional windows (notably the application of s 182(3) and s 45A).
Main concepts
The instrument is short and revolves around a small set of concepts established either in the NDIS Act (which retains its primary definitions) or in the amending Act and existing NDIS rules. The instrument uses those concepts rather than redefining them within the instrument (s 4(2)). The principal concepts to track in this instrument are:
NDIS amount and paragraph 46(1)(a): Section 5 operates where a person fails to comply with paragraph 46(1)(a) of the NDIS Act, which is the statutory requirement to spend NDIS funds only on NDIS supports. The instrument assumes the reader knows that paragraph and treats failures against it as the triggering conduct for debt recovery considerations (s 5(1)).
Subsection 182(3) of the NDIS Act: Section 5 alters the application of s 182(3), which is a provision that otherwise interacts with debts due to the Agency. The instrument does not repeal s 182(3); it suspends its operation in specified transitional circumstances, except where specified thresholds are met (s 5(2)).
Old framework plan and new framework plan: Sections 6 and 7 deploy the distinction between “old framework plan” and “new framework plan”. The instrument does not define those phrases itself, but s 4(2) requires that terms defined in the NDIS Act have the same meaning in the instrument, so the distinction should be read with reference to the NDIS Act and the amending Act (s 4(2); ss 6, 7).
Section 45A of the NDIS Act: Section 6 excludes the operation of s 45A in certain transport payment contexts. Section 45A is therefore relevant in framing when claims for reimbursement or payment are statutorily required; the instrument creates carve-outs to that requirement for recurring transport supports under old framework plans and for certain private vehicle transport payments under new framework plans to specified payees up to a fixed fortnightly amount (s 6(1), (1A)).
CEO satisfaction standard and pre‑existing methods/criteria: Section 7 imposes an additional substantive test on the CEO when approving or varying statements of participant supports for old framework plans during a transitional window: the CEO must be satisfied each support is “most appropriately funded or provided through the National Disability Insurance Scheme” and not more appropriately funded through other general systems, universal service obligations or discrimination‑law reasonable adjustments. The CEO must apply methods or criteria and have regard to matters that were prescribed under s 34(2) of the NDIS Act immediately before commencement (s 7(2)-(4)).
Other technical details underpinning the main concepts include: the instrument’s statutory authority (item 138 of Schedule 1 to the amending Act, s 3); the cross‑references to the first NDIS rules made for para 35(4)(d) (which define the end of the transitional window in s 7(1)); and the explicit numeric limits and time periods that define the transitional reliefs and obligations (for example: 30 days for providers, 12 months for others, the $1,500 threshold, and the $132.58 per‑fortnight cap) (s 5(1), (2); s 6(1A)(c)).
Who it affects
The instrument directly affects three overlapping groups: participants and those who receive NDIS funding for their supports, people and entities who receive NDIS amounts on behalf of participants including NDIS providers, and the Agency and CEO who administer and make decisions under the NDIS Act.
NDIS providers and payees who receive NDIS amounts on behalf of a participant: Section 5 treats a person who is an NDIS provider and received an amount on behalf of a participant differently from others by applying a 30‑day transitional period from commencement of Schedule 1 to the amending Act for failures to comply with paragraph 46(1)(a) (s 5(1)(a)). For such providers, the instrument modifies the immediate application of s 182(3) during that 30‑day period (s 5(1)(a)-(2)). Providers therefore are directly affected in terms of enforcement timing and potential debt treatment over that 30‑day window.
Other persons who receive NDIS amounts: Section 5(1)(b) creates a longer transitional window (12 months) for any other person who fails to comply with paragraph 46(1)(a) , that is, persons who are not NDIS providers but who receive NDIS funds. Those persons therefore have a different time window in which the suspension of s 182(3) applies (s 5(1)(b)).
Participants who self‑manage, plan nominees, and persons managing funding for child participants under s 74(1): Section 6(1A)(a) expressly identifies three categories of payees: participants who self‑manage; plan nominees who manage funding for a participant; and persons mentioned in s 74(1) who manage funding for a child participant (s 6(1A)(a)). These persons can receive payments for acquisition of private vehicle transport supports under a new framework plan without being subject to s 45A claim requirements up to $132.58 per fortnight (s 6(1A)(b)-(c)).
The CEO and the Agency: Section 7 imposes decision‑making obligations on the CEO when approving or varying statements of participant supports included in an old framework plan during the transitional window described in s 7(1). The CEO must be satisfied of the “most appropriately funded or provided through the NDIS” matter for each support and must apply methods/criteria and have regard to matters that were prescribed by pre‑commencement NDIS rules (s 7(2)-(4)). The Agency is also implicated in s 5 because subsection 182(3) of the NDIS Act is expressly excluded from application unless threshold conditions in s 5(2) are met, which affects Agency debt recovery practice.
Who bears financial risk or compliance burden depends on role: providers and other payees bear the immediate duty to spend NDIS amounts only on NDIS supports under paragraph 46(1)(a) and must manage their conduct inside the transitional windows set by s 5; self‑managing participants and nominated plan managers gain an administrative relief for certain private vehicle payments under s 6(1A); the CEO bears an evidentiary and satisfaction task under s 7 when approving or varying old framework plan statements. The instrument therefore shifts timing and evidentiary burdens among these groups rather than creating new substantive entitlements for entirely new classes of persons.
Key duties and rights
The instrument alters decision responsibilities and the application of certain duties that already exist in the NDIS Act, rather than imposing numerous fresh duties. The salient duties and rights created or adjusted by this instrument are as follows:
Duty to spend NDIS amounts on NDIS supports (reference point): The underlying duty remains paragraph 46(1)(a) of the NDIS Act; the instrument does not change paragraph 46(1)(a) itself, but it affects the debt/recovery consequences that follow a failure to comply with that duty during a transitional window (s 5(1)). The instrument therefore does not remove the underlying spending duty; it changes how subsection 182(3) applies in certain situations (s 5).
Suspension of s 182(3) in defined circumstances: For failures occurring in the specified transitional periods, subsection 182(3) of the NDIS Act “does not apply” unless either the NDIS amount is $1,500 or more, or prior to the failure the Agency had notified the person of at least two previous failures to comply with paragraph 46(1)(a). This creates a statutory threshold condition that narrows the circumstances in which s 182(3) can be relied upon for debt recovery during the transitional window (s 5(2)). Practically, this produces a distinguishable rule: during the transitional period, only relatively large amounts (≥ $1,500) or repeat failures (2 or more prior notices) will leave s 182(3) operable.
Claim requirements for transport supports , carve‑outs to s 45A: The instrument removes the operation of s 45A for recurring transport supports under an old framework plan (s 6(1)). It also removes s 45A for payments (in respect of acquisition of private vehicle transport supports under a new framework plan) to specified payees , self‑managing participants, plan nominees, and persons in s 74(1) managing a child’s plan , to the extent the payment is equal to or less than $132.58 per fortnight (s 6(1A)(a)-(c)). This is a limited right to not be bound by s 45A claim rules in those circumstances.
CEO’s decision standard for old framework plan statements: When a statement of participant supports in an old framework plan is approved or varied during the transitional window described, the CEO must, in addition to the matters in s 34(1) of the NDIS Act, be satisfied that each general or reasonable and necessary support is most appropriately funded or provided through the NDIS and not more appropriately funded through other general systems, universal service obligations or reasonable adjustments under discrimination law (s 7(2)-(3)). This places a substantive test on the CEO’s satisfaction and an obligation to apply pre‑existing methods/criteria and to have regard to pre‑existing matters that were prescribed under s 34(2) immediately before commencement (s 7(4)).
Penalties and enforcement
The instrument does not itself create new criminal offences or new penalty regimes. Rather, it modifies the practical operation of particular enforcement and debt mechanisms in the NDIS Act, and it changes when certain statutory claim rules apply. The enforcement consequences to note are:
Non‑application of s 182(3) for many transitional failures: Section 5 expressly provides that subsection 182(3) of the NDIS Act “does not apply” in relation to failures to comply with paragraph 46(1)(a) that occur during the transitional periods defined in s 5(1), except where the NDIS amount is $1,500 or more or where the Agency had previously notified the person of at least two prior failures (s 5(2)). Because s 182(3) concerns debts due to the Agency, this is an express statutory limitation on the Agency’s use of s 182(3) as an enforcement mechanism for those failures during the transitional windows (s 5).
Thresholds that preserve enforcement in certain cases: The instrument deliberately preserves s 182(3) where amounts are $1,500 or more or where there is a history of at least two prior notices from the Agency. In those situations s 182(3) still applies and any debt or enforcement procedures tied to s 182(3) remain available to the Agency (s 5(2)). The instrument therefore calibrates enforcement intensity by amount and prior notification history.
Claims regime altered for certain transport payments: Section 6 removes the application of s 45A in respect of recurring transport supports under old framework plans (s 6(1)), and for certain private vehicle transport payments under new framework plans to specified payees up to $132.58 per fortnight (s 6(1A)). Since s 45A establishes when a claim is required, excluding its operation narrows the Agency’s statutory claim rights in respect of those payments during the instrument’s operation. The instrument does not itself state alternate recovery procedures in those cases; it simply excludes s 45A’s claim requirement.
CEO decision obligations and evidentiary considerations: Section 7 imposes on the CEO the duty to be satisfied that each listed support in an old framework plan is most appropriately funded or provided through the NDIS, and that in doing so the CEO must apply pre‑existing methods/criteria. That statutory satisfaction standard will be the administrative threshold the Agency must meet when approving or varying such statements, and so enforcement or later contestation of funding choices will be judged against that statutory standard (s 7(2)-(4)).
Operationally, the instrument increases the Agency and CEO’s discretion in some respects and constrains automatic enforcement in others. It is explicit: s 5 reduces automatic operation of s 182(3) subject to numerical and notice thresholds; s 6 removes a claim requirement in defined circumstances; s 7 prescribes the CEO’s satisfaction test and the set of methods/criteria to be applied (s 5-7). The instrument does not create a new penalty for non‑compliance with its own transitional rules; penalties or recovery actions remain those contained in the NDIS Act, applied subject to the modifications the transitional rules require.
How it interacts with other laws
This instrument operates as amendments to the application of particular provisions of the NDIS Act and interacts directly with prior NDIS rules and the amending Act. The principal points of interaction are explicit in the instrument:
Statutory authority from the amending Act: The instrument is made under item 138 of Schedule 1 to the National Disability Insurance Scheme Amendment (Getting the NDIS Back on Track No. 1) Act 2024 (s 3). The instrument therefore derives its legal power from that Schedule in the amending Act and must be read alongside the amending Act’s transitional framework (s 3).
Definitions and meanings in the NDIS Act: Section 4(2) provides that any expression defined in the NDIS Act has the same meaning in the instrument. That means the instrument imports the NDIS Act’s definitions of concepts such as “participant”, “NDIS provider”, “old framework plan”, “new framework plan”, “NDIS amount”, “self‑managing”, and references to particular sections (s 4(2)). Interaction therefore requires reading the NDIS Act’s definitions and operative sections in conjunction with the instrument.
Modification of specific NDIS Act provisions: The instrument modifies the application of subsection 182(3) (s 5), excludes the application of s 45A for specified payments (s 6), and supplements the CEO’s existing obligations under s 34(1) of the NDIS Act by adding a “most appropriately funded or provided” test for statements in old framework plans during the transitional window (s 7(2)). Each of these changes must be read as a temporal adjustment to the NDIS Act’s substantive architecture.
Use of pre‑existing NDIS rules and the timing of new NDIS rules: Section 7(1) ends the transitional window for CEO obligations immediately before the commencement of the first NDIS rules made for paragraph 35(4)(d) of the NDIS Act as added by Schedule 1 to the amending Act. Section 7(4) then requires the CEO to apply methods/criteria and have regard to matters that were prescribed under s 34(2) by NDIS rules in force immediately before commencement. That creates a direct dependence on the content and timing of existing NDIS rules and the first rules under para 35(4)(d). Similarly, s 6(2) modifies the effect of subitem 132A(1) of Schedule 1 to the amending Act as if additional words were added, tying this instrument into the amending Act’s Schedule (s 6(2)).
Reservation of power to modify effect via amending Act Schedule: The instrument includes a cross‑note observing that subitem 138(2) of Schedule 1 to the amending Act confers power to modify the effect of provisions of that Schedule, which is relevant to how s 6(2) operates in relation to subitem 132A(1) (s 6(2) and the following note). The instrument therefore sits inside a statutory matrix of Schedule‑level modification powers.
Amendment history
This instrument is itself a transitional rules instrument made in 2024 and its amendment history within the text provided is minimal and explicit. The instrument records its authority and relationship to the amending Act (s 3) and refers to subitems of Schedule 1 to that amending Act (s 6(2) and accompanying note). The specific historical pointers in the instrument are:
Origin and authority: The instrument is made under item 138 of Schedule 1 to the National Disability Insurance Scheme Amendment (Getting the NDIS Back on Track No. 1) Act 2024 (s 3). That identifies the instrument’s enabling provision in the amending Act; no earlier versions of this instrument are provided in the text.
Temporal references to NDIS rules: The instrument explicitly ties parts of its operation to the timing of the first NDIS rules made for paragraph 35(4)(d) of the NDIS Act as added by Schedule 1 to the amending Act (s 7(1)). This establishes that the transitional application of s 7 ends immediately before those rules commence.
Interaction with subitems of Schedule 1 to the amending Act: Section 6(2) states that Subitem 132A(1) of Schedule 1 to the amending Act has effect “as if” certain words were added, thereby effecting an implicit amendment of the operation of the amending Act’s Schedule via the transitional instrument (s 6(2)). The instrument also includes a note directing readers to subitem 138(2) of Schedule 1 to the amending Act for the power to modify the effect of provisions of that Schedule, indicating that the amending Act itself contains modification powers relevant to this instrument (s 6(2) note).
No internal amendments within the instrument: The instrument does not record or contain amendments to itself. No earlier versions, superseding instruments, or subsequent amendments are included in the provided text. The title includes the calendar year 2024, which is the operative year for this instrument.
Because the instrument is transitional and explicitly refers to timing and to the amending Act’s schedule, its practical scope and therefore any future amendment pathway is likely to be bound up with the commencement of the specified NDIS rules and any exercise of modification powers in the amending Act’s Schedule. The instrument does not contain a recorded chain of previous amendments or subsequent variations; the only internal historic content is its relationship to the amending Act and the timing of NDIS rules (s 3, s 6(2), s 7(1), s 7(4)).
Litigation history
The instrument contains no litigation history, case citations, or references to judicial decisions. The text does not name any cases and does not indicate that it has been the subject of litigation (the instrument is silent on judicial proceedings). The absence of litigation references in the instrument itself means any litigation history would need to be sourced from external court records or commentary, which are not provided in the text.
That said, the instrument creates a set of legal question areas that are naturally contestable and would be expected to be the focal points of any future litigation or administrative review. The instrument’s text highlights these potential contention points without deciding them; they include:
Meaning and scope of “old framework plan” and “new framework plan”: Because the instrument relies on those labels (s 6, s 7) but does not define them in the instrument itself, parties could litigate whether a particular plan falls inside the “old” or “new” category. Resolution of such disputes would require reference to the definitions in the NDIS Act and possibly the amending Act’s Schedule (s 4(2)).
Application and non‑application of s 182(3): Section 5 suspends application of s 182(3) during specified windows except for amounts of $1,500 or more or where the Agency had issued at least two prior notices (s 5(2)). Disputes could arise over whether a prior Agency communication amounts to a qualifying notice, the temporal sequencing of prior notices, or whether a particular payment qualifies as an “NDIS amount”. Litigation might focus on whether s 182(3) was correctly held inapplicable or applicable in particular circumstances.
Interpretation of the CEO’s satisfaction standard in s 7: The CEO must be satisfied that a support is most appropriately funded or provided through the NDIS and not more appropriately funded through other systems, including universal service obligations and discrimination‑law reasonable adjustments (s 7(2)-(3)). Litigable questions could include what evidence suffices to meet the CEO’s statutory satisfaction standard, how the CEO should apply pre‑existing methods/criteria under s 34(2) that were in force immediately before commencement, and the standard of review for any judicial review of the CEO’s decision.
Application of the s 45A exceptions in s 6: Section 6(1) and (1A) exclude s 45A for particular transport payments. Parties could litigate whether a payment is a recurring transport support under an old framework plan, or whether a private vehicle transport payment falls within the $132.58 per fortnight cap and to whom the exemption applies. Disputes could also arise about how fortnightly periods are measured and aggregated.
Gotchas
The instrument is short but contains a number of details where a failure to read the precise words will change practical outcomes. The following are concrete drafting and timing points that often catch practitioners, with explicit cross‑references to the instrument:
Different transitional windows for providers and others: Section 5 treats an NDIS provider who received the amount on behalf of a participant differently from “any other case” (s 5(1)(a)-(b)). Providers face a 30‑day transitional window from commencement of Schedule 1 to the amending Act; other persons get a 12‑month window. Confusing those windows can lead to incorrect assumptions about applicability of s 182(3).
s 182(3) does not apply unless amount ≥ $1,500 or two prior notices from the Agency: Section 5(2) creates a cumulative test for when s 182(3) remains operative. If the NDIS amount is under $1,500 and the Agency has not previously notified the person of at least two previous failures, subsection 182(3) does not apply. Practitioners must track both the monetary threshold and the Agency’s prior notification history.
The meaning of “NDIS amount” and “failure to comply” are sourced to the NDIS Act: The instrument references failures against paragraph 46(1)(a) and “NDIS amount”. Those concepts are not restated; s 4(2) instructs that NDIS Act definitions apply. Users must consult the NDIS Act definitions rather than relying solely on the transitional rules text (s 4(2)).
Exclusion of s 45A is limited and specific: Section 6(1) excludes s 45A for a payment in respect of the acquisition/provision of a recurring transport support under an old framework plan. Section 6(1A) excludes s 45A for payments to defined persons in respect of acquisition of a private vehicle transport support under a new framework plan, but only to the extent the payment is equal to or less than $132.58 per fortnight (s 6(1), (1A)(a)-(c)). The instrument therefore creates a technical per‑fortnight cap that applies only to those payees and only to private vehicle transport under a new plan. The precise amount ($132.58) and the temporal unit (per fortnight) matter; practitioners should not generalise the exclusion to other supports, payees, or larger amounts.
Temporal interplay between “as in force on and after commencement” and “immediately before commencement”: The instrument uses careful temporal language. For example s 6(1) and s 7 refer to provisions “as in force on and after the commencement of Schedule 1 to the amending Act” and s 7(4) requires the CEO to apply methods/criteria that were prescribed “immediately before the commencement” (s 6(1); s 7(1), (4)). That means some tests apply based on how the NDIS Act or rules read immediately before commencement, while other references import the post‑commencement form of the relevant provisions. Attention to the discrete temporal language is essential.
How to comply
Practitioners, plan managers, providers, self‑managing participants and agency decision makers should take targeted compliance steps that follow directly from the instrument’s mechanics. Below are practical, source‑grounded actions tied to the relevant sections.
Identify whether the payment/plan falls in the transitional windows
For possible s 182(3) suspension (s 5): Determine whether the alleged failure to comply with paragraph 46(1)(a) occurred during the transitional period defined in s 5(1). If the person is an NDIS provider who received the amount on behalf of a participant, the relevant window is 30 days starting on commencement of Schedule 1 to the amending Act (s 5(1)(a)). For any other person, the window is 12 months starting on that commencement (s 5(1)(b)). Record the date of receipt and whether the payee was an NDIS provider.
Track amount thresholds and prior notifications
Under s 5(2), s 182(3) continues to apply if the NDIS amount is $1,500 or more, or if the Agency had notified the person about at least two previous failures prior to the failure in question. Maintain contemporaneous records of Agency notices and amounts received to establish whether either threshold is met. The absence of two prior notices and amounts under $1,500 mean s 182(3) will not apply for failures in the relevant transitional window (s 5(2)).
For transport payments, check which plan type applies and who the payee is
If the payment is for a recurring transport support under an old framework plan, s 45A does not apply (s 6(1)). If the payment concerns acquisition of a private vehicle transport support under a new framework plan, determine whether the payee is a self‑managing participant, a plan nominee managing funding on behalf of a participant, or a person mentioned in s 74(1) managing a child’s plan. If so, s 45A does not apply to the extent the payment is equal to or less than $132.58 per fortnight (s 6(1A)(a)-(c)). Ensure fortnightly aggregations are calculated consistently and keep evidence of amounts paid in each fortnight.
For plan approvals or variations under old framework plans, prepare evidence to support CEO satisfaction
If you are the Agency or advising the CEO (s 7): where a statement of participant supports in an old framework plan is approved or varied during the transitional period in s 7(1), ensure the record shows the CEO’s satisfaction that each support is most appropriately funded or provided through the NDIS and not more properly funded through other general systems, universal service obligations, or reasonable adjustments under discrimination law (s 7(2)-(3)). Apply the methods/criteria and have regard to the matters that were prescribed under s 34(2) by NDIS rules in force immediately before commencement (s 7(4)). Retain decision memoranda that set out the application of those pre‑existing methods/criteria.
Current sections
Direct links to the current provisions in National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (Miscellaneous Provisions) Transitional Rules 2024.
8
Part 1
Preliminary
Part 1—Preliminary
1
Name
1 Name
This instrument is the National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (Miscellaneous Provisions) Transitional Rules 2024.
3
Authority
3 Authority
This instrument is made under item 138 of Schedule 1 to the National Disability Insurance Scheme Amendment (Getting the NDIS Back on Track No. 1) Act 2024.
4
Definitions
4 Definitions
(1) In this instrument:
amending Act means the National Disability Insurance Scheme Amendment (Getting the NDIS Back on Track No. 1) Act 2024.
NDIS Act means the National Disability Insurance Scheme Act 2013.
(2) An expression that is defined for the purposes of the NDIS Act has the same meaning when used in this instrument as it has in that Act.
Part 2
Transitional provisions
Part 2—Transitional provisions
5
Debts due to the Agency—complying with requirement to spend NDIS amounts only on NDIS supports
5 Debts due to the Agency—complying with requirement to spend NDIS amounts only on NDIS supports
(1) This section applies in relation to a person’s failure to comply with paragraph 46(1)(a) of the NDIS Act, as in force on and after the commencement of Schedule 1 to the amending Act, in relation to an NDIS amount where the failure occurs during the following period:
(a) if the person is an NDIS provider and the person received the amount on behalf of a participant—the period of 30 days starting on that commencement;
(b) in any other case—the period of 12 months starting on that commencement.
(2) Subsection 182(3) of the NDIS Act does not apply in relation to the failure unless:
(a) the NDIS amount is $1,500 or more; or
(b) before the failure occurred, the Agency had notified the person about at least 2 previous failures by the person to comply with paragraph 46(1)(a) of the NDIS Act.
6
Claims not required for certain supports
6 Claims not required for certain supports
(1) Section 45A of the NDIS Act, as in force on and after the commencement of Schedule 1 to the amending Act, does not apply in relation to a payment in respect of the acquisition or provision of a recurring transport support under an old framework plan.
(1A) Section 45A of the NDIS Act, as in force on and after the commencement of this subsection, does not apply in relation to a payment:
(a) to:
(i) a participant who self‑manages the funding for supports under their plan
(ii) a plan nominee of a participant who manages funding for supports under that participant’s plan, or
(iii) a person mentioned in s 74(1) of the NDIS Act who manages funding for supports under a plan for a participant who is a child
(b) which is made in respect of the acquisition of a private vehicle transport support under a new framework plan, and
(c) to the extent the payment is equal to or less than $132.58 in respect of each fortnightly period.
(2) Subitem 132A(1) of Schedule 1 to the amending Act has effect as if the words “and subsection 6(1) and subsection 6(1A) of the National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (Miscellaneous Provisions) Transitional Rules 2024” were added at the end of that subitem.
Note: See subitem 138(2) of Schedule 1 to the amending Act for the power to modify the effect of provisions of that Schedule.
7
Requirement for supports to be most appropriately funded or provided through the National Disability Insurance Scheme
7 Requirement for supports to be most appropriately funded or provided through the National Disability Insurance Scheme
(1) This section applies in relation to a statement of participant supports included in an old framework plan for a participant if the statement is approved or varied during the period:
(a) starting on the commencement of Schedule 1 to the amending Act; and
(b) ending immediately before the commencement of the first National Disability Insurance Scheme rules made for the purposes of paragraph 35(4)(d) of the NDIS Act (as added by Schedule 1 to the amending Act).
(2) For the purpose of specifying in the statement the general supports that will be provided, and the reasonable and necessary supports that will be funded, the CEO must be satisfied of the matter mentioned in subsection (3) in relation to the funding or provision of each such support, in addition to the matters of which the CEO must be satisfied as mentioned in subsection 34(1) of the NDIS Act, as in force on and after the commencement of Schedule 1 to the amending Act.
(3) The matter of which the CEO must be satisfied is that the support is most appropriately funded or provided through the National Disability Insurance Scheme, and is not more appropriately funded or provided through other general systems of service delivery or support services offered by a person, agency or body, or systems of service delivery or support services offered:
(a) as part of a universal service obligation; or
(b) in accordance with reasonable adjustments required under a law dealing with discrimination on the basis of disability.
(4) In deciding whether or not he or she is satisfied of the matter mentioned in subsection (3), the CEO must apply any methods or criteria, and have regard to any matters, that:
(a) were prescribed for the purposes of subsection 34(2) of the NDIS Act by National Disability Insurance Scheme rules in force immediately before the commencement of Schedule 1 to the amending Act; and
(b) related to the matter mentioned in paragraph 34(1)(f) of the NDIS Act, as in force immediately before that commencement.
(5) This section applies as mentioned in subsection (1):
(a) whether the participant becomes a participant; and
(b) in the case of a variation—whether the plan comes into effect;
before, on or after the commencement of Schedule 1 to the amending Act.
Source text
Sourced from the Federal Register of Legislation (legislation.gov.au), CC BY 4.0.
Part 1 Preliminary
Part 1—Preliminary
1 Name
1 Name
This instrument is the National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (Miscellaneous Provisions) Transitional Rules 2024.
3 Authority
3 Authority
This instrument is made under item 138 of Schedule 1 to the National Disability Insurance Scheme Amendment (Getting the NDIS Back on Track No. 1) Act 2024.
4 Definitions
4 Definitions
(1) In this instrument:
amending Act means the National Disability Insurance Scheme Amendment (Getting the NDIS Back on Track No. 1) Act 2024.
NDIS Act means the National Disability Insurance Scheme Act 2013.
(2) An expression that is defined for the purposes of the NDIS Act has the same meaning when used in this instrument as it has in that Act.
Part 2 Transitional provisions
Part 2—Transitional provisions
5 Debts due to the Agency—complying with requirement to spend NDIS amounts only on NDIS supports
5 Debts due to the Agency—complying with requirement to spend NDIS amounts only on NDIS supports
(1) This section applies in relation to a person’s failure to comply with paragraph 46(1)(a) of the NDIS Act, as in force on and after the commencement of Schedule 1 to the amending Act, in relation to an NDIS amount where the failure occurs during the following period:
(a) if the person is an NDIS provider and the person received the amount on behalf of a participant—the period of 30 days starting on that commencement;
(b) in any other case—the period of 12 months starting on that commencement.
(2) Subsection 182(3) of the NDIS Act does not apply in relation to the failure unless:
(a) the NDIS amount is $1,500 or more; or
(b) before the failure occurred, the Agency had notified the person about at least 2 previous failures by the person to comply with paragraph 46(1)(a) of the NDIS Act.
6 Claims not required for certain supports
6 Claims not required for certain supports
(1) Section 45A of the NDIS Act, as in force on and after the commencement of Schedule 1 to the amending Act, does not apply in relation to a payment in respect of the acquisition or provision of a recurring transport support under an old framework plan.
(1A) Section 45A of the NDIS Act, as in force on and after the commencement of this subsection, does not apply in relation to a payment:
(a) to:
(i) a participant who self‑manages the funding for supports under their plan
(ii) a plan nominee of a participant who manages funding for supports under that participant’s plan, or
(iii) a person mentioned in s 74(1) of the NDIS Act who manages funding for supports under a plan for a participant who is a child
(b) which is made in respect of the acquisition of a private vehicle transport support under a new framework plan, and
(c) to the extent the payment is equal to or less than $132.58 in respect of each fortnightly period.
(2) Subitem 132A(1) of Schedule 1 to the amending Act has effect as if the words “and subsection 6(1) and subsection 6(1A) of the National Disability Insurance Scheme (Getting the NDIS Back on Track No. 1) (Miscellaneous Provisions) Transitional Rules 2024” were added at the end of that subitem.
Note: See subitem 138(2) of Schedule 1 to the amending Act for the power to modify the effect of provisions of that Schedule.
7 Requirement for supports to be most appropriately funded or provided through the National Disability Insurance Scheme
7 Requirement for supports to be most appropriately funded or provided through the National Disability Insurance Scheme
(1) This section applies in relation to a statement of participant supports included in an old framework plan for a participant if the statement is approved or varied during the period:
(a) starting on the commencement of Schedule 1 to the amending Act; and
(b) ending immediately before the commencement of the first National Disability Insurance Scheme rules made for the purposes of paragraph 35(4)(d) of the NDIS Act (as added by Schedule 1 to the amending Act).
(2) For the purpose of specifying in the statement the general supports that will be provided, and the reasonable and necessary supports that will be funded, the CEO must be satisfied of the matter mentioned in subsection (3) in relation to the funding or provision of each such support, in addition to the matters of which the CEO must be satisfied as mentioned in subsection 34(1) of the NDIS Act, as in force on and after the commencement of Schedule 1 to the amending Act.
(3) The matter of which the CEO must be satisfied is that the support is most appropriately funded or provided through the National Disability Insurance Scheme, and is not more appropriately funded or provided through other general systems of service delivery or support services offered by a person, agency or body, or systems of service delivery or support services offered:
(a) as part of a universal service obligation; or
(b) in accordance with reasonable adjustments required under a law dealing with discrimination on the basis of disability.
(4) In deciding whether or not he or she is satisfied of the matter mentioned in subsection (3), the CEO must apply any methods or criteria, and have regard to any matters, that:
(a) were prescribed for the purposes of subsection 34(2) of the NDIS Act by National Disability Insurance Scheme rules in force immediately before the commencement of Schedule 1 to the amending Act; and
(b) related to the matter mentioned in paragraph 34(1)(f) of the NDIS Act, as in force immediately before that commencement.
(5) This section applies as mentioned in subsection (1):
(a) whether the participant becomes a participant; and
(b) in the case of a variation—whether the plan comes into effect;
before, on or after the commencement of Schedule 1 to the amending Act.
Application timing and scope: Section 7 explicitly states the CEO’s obligations apply whether the participant becomes a participant and in case of a variation whether the plan comes into effect, before, on or after commencement (s 7(5)). That is, the duty attaches to approvals or variations in the specified approval/variation window regardless of when the plan takes effect.
Rights implicit in the instrument include a degree of procedural and practical relief for certain payees from the statutory claim requirement in s 45A (s 6), and a statutory protection for persons facing debt recovery in many cases during the transitional windows due to the non‑application of s 182(3) unless specific thresholds are met (s 5(2)). Duties are concentrated on the CEO for evaluative decisionmaking for old framework plan statements (s 7(2)-(4)). The instrument therefore redistributes procedural burdens: it reduces immediate automatic debt enforcement for certain target failures, it narrows claim procedure obligations for specified transport payments, and it requires the CEO to apply a particular evaluative standard using pre‑existing criteria for specified plan statements.
No express conflict or override of other Commonwealth, state or territory laws: The instrument does not itself purport to alter the operation of state or territory laws, universal service obligations, or discrimination laws; those categories appear as comparative funding sources in s 7(3). Section 7(3) requires the CEO to be satisfied a support is not more appropriately funded through other systems, universal service obligations, or reasonable adjustments under laws dealing with discrimination based on disability (s 7(3)). This places those other legal frameworks as reference points for NDIS funding decisions rather than displacing them.
In short, the instrument modifies how certain NDIS Act provisions and pre‑existing NDIS rules operate over a defined transitional period. It relies on and points back to the amending Act and prior NDIS rules for authority, definitions and decision‑making criteria (ss 3-4, 6(2), 7(4)). Those interconnections imply that implementation and interpretation of the transitional rules cannot be isolated from the NDIS Act, the amending Act’s Schedule, and the content and timing of NDIS rules.
The instrument itself does not provide decisions or precedents. If litigation arises, courts or tribunals will necessarily interpret the instrument in light of the NDIS Act, the amending Act and the pre‑existing NDIS rules referenced by the instrument (s 4(2), s 6(2), s 7(4)). For now, the instrument is a fresh transitional enactment recorded as part of the amending Act’s implementation architecture; any litigation history will need to be developed in the courts and is not present in the instrument text.
References to other bits of the amending Act’s Schedule: Section 6(2) operates “as if” subitem 132A(1) of Schedule 1 to the amending Act included additional words referencing subsections 6(1) and 6(1A) of this instrument (s 6(2)). The note points you to subitem 138(2) for the power to modify effect. Practitioners should be alert to the way the instrument is modifying the amending Act’s Schedule by reference.
CEO satisfaction test applies regardless of when the plan takes effect: Section 7(5) makes the CEO’s obligation applicable whether the participant becomes a participant and, in the case of a variation, whether the plan comes into effect, and regardless of whether those events occur before, on or after commencement. There is therefore potential for the CEO to be required to apply the transitional test to plans or variations that take effect at different times relative to commencement (s 7(5)).
The instrument does not itself provide alternate claim or recovery rules where s 45A or s 182(3) are excluded: Where the instrument excludes s 45A or suspends s 182(3), it does not in the text set out alternative mechanisms or processes for recovery or oversight. Practitioners should note that the absence of s 45A or s 182(3) does not automatically create a freestanding entitlement; it simply changes the applicability of those particular statutory provisions (s 5; s 6).
Narrow scope , do not overextend the carve‑outs: The instrument’s changes are tightly targeted to particular supports, payees, amounts and time periods. For example, the $132.58 cap applies only to private vehicle transport payments under a new framework plan to specified payees (s 6(1A)); it does not apply to other transport supports, other payees, or larger amounts. Reading the carve‑outs more broadly than the statutory words permit will lead to compliance error.
These are practical points that flow directly from the instrument’s precise phrasing. The interaction of monetary thresholds, identity of the payee, the old/new plan distinction, and the timing of approvals/variations are the details that materially alter the application of established NDIS Act provisions during the transitional period (ss 5-7).
Maintain clear documentation and time stamps
For providers and payees, document the receipt date, the purpose of the amount, how it was spent, and the link to NDIS supports to evidence compliance with paragraph 46(1)(a). Where the transitional windows or thresholds are relevant, keep contemporaneous logs showing the dates and amounts to demonstrate whether s 182(3) could be engaged (s 5).
Communicate proactively with the Agency
If there is a potential failure to comply with paragraph 46(1)(a), consider early engagement with the Agency to resolve issues before formal notices accumulate. Under s 5(2) the Agency’s prior notices are a key trigger for s 182(3) becoming applicable; control of communication and remediation steps will affect whether those notice thresholds are met.
When claiming transport payments, ensure the factual matrix fits the carve‑out precisely
If relying on the s 45A carve‑outs (s 6), be precise: confirm whether the support is recurring transport under an old framework plan or private vehicle transport under a new framework plan and whether the payee is within the enumerated categories, and ensure the amount per fortnight does not exceed $132.58 (s 6(1), (1A)). Do not assume the carve‑out covers other transport types or larger payments.
For advisers drafting submissions to the CEO, reference pre‑commencement rules
Section 7(4) makes the CEO’s application of methods/criteria dependent on rules that were in force immediately before commencement. Practitioners preparing material for the CEO should identify and explicitly reference the text of the pre‑commencement s 34(2) rules and show how those methods/criteria have been applied to the supports under consideration.
Map plan changes and approval dates against the instrument’s timing rules
Because s 7(5) applies irrespective of when the plan takes effect (before, on or after commencement), map the sequence of approval, variation and plan effectiveness dates to ensure obligations are applied correctly (s 7(5)). When advising clients, confirm whether the plan’s approval or variation date falls within the s 7(1) window (which ends immediately before the first NDIS rules for para 35(4)(d) commence).
Keep an eye on subsequent rules and Schedule commencements
The instrument’s operation is expressly linked to the timing of the first NDIS rules under para 35(4)(d) and subitems of the amending Act’s Schedule (s 6(2), s 7(1)). Practitioners should monitor the commencement of those rules and any action under subitem 138(2) of the amending Act which may further modify the Schedule’s effect.
Following these steps will align operational practice with the instrument’s explicit statutory mechanics. The key compliance principle is precision: apply the instrument’s monetary thresholds, payee definitions, plan‑type distinctions, and temporal windows exactly as the text requires (ss 4-7).